Loading...
HomeMy WebLinkAbout1994-09-123 Application for Utility Permit•" CITY OF ORONO APPLICATION FOR UTILITY PERK" TS ;;4 42S Box 66 (2750 Kelley Parkway) SEWER/WATER Crystal Bay, MN 55323 GENERAL INEOR-TATION you may apply for utility permits by mail or in person at g e 1 2. Mailed in applications are subject to the postage and handling fees aiil�v .. v. Permit cards will be seat by return mail the same day the application is received. 3 permits are not valid until you receive a permit card. 4 Work must not begin unless the permit card is available on the job site. 5. Utility connection permits may be issued to licensed contractors only. for ty stub as -built locations. DO EXCAVATE 6 Contact the STREET AND DO NOTTAPANY MAIN rwithout express app oval of theTPublic IN ANY c Works Department. issuance of a permit does not grant this approval. 7. All work must be done in zccordance with State Code requirements. 8. All work must be inspected before is covered.Call 7357.ura required. �� JOB SITE ADDRESS: J Occupancy Type: x Reside iAi Owner's Name: H� 1(5 n Mailing Address: 13 " C: 0 e (A C.;-- Contractor's Name: Mailing Address: I CA Commercial Prone Number: City:01( - t' Prone Number: 1 City: L11 t2 PERMIT TYPE $ Municipal Sewer Connection (S35.00 per stub) cast iron pipe size inches; material PVC (on sand fill); permit applications unless prepaid. If not SAC Charge ($800.00) must accompany all sewer prepaid, a sewer connection permit will not be issued. Municipal Water Connection ($35.00 per stub) other pipe size inches; material copper; WATER METERS must be picked up and paid for at City Ha;l. (5/8" meters = $133.00; 3/4" meters = $181.00; 1" meters = $235.00) Separate plumbing Permit issued for water meter. Water meters must be set and sealed by Orono Water Department (473-735T, upon completion of meter installation. REQUIRED minimum setbacks from drainfield and septic tanks = 75' REQUIRED setback from sewer line = 20' PERMIT FEE CALCULATION $ 1. Subtotal of above permit requested $ .50 2. State Surcharge The State Building Code Division Surcharge of s.50 per permit must be included for each well, sewer and water connection permit requested. $ 1 5(1 3. Postage & Handling (Only mail -in applications) $ 4. TOTAL PERMIT FEE (add lines 1-3 above) The undersigned hereby applies to the City of Orono for issuance of a Utility Permit. to do all work in strict accordance with the ordinances of the City and the regulations e. State of Minnesota, and certifies that all statements made on this application are complete, tn-e and correct.xr�, - Dale: Signature of Applicant: .(��