Loading...
HomeMy WebLinkAbout1969-06-18 Septic System DesignFORM A VILLAGE OF ORONO PERMIT NO. RECEIPT NO. CRYSTAL BAY, MINNESOTA Contractor's Name --- Contractor's Address — --- Owner's Name Owner's Address DRAWING NO.I SEPTIC TANKS j, DISTRIBUTION SOA WELL • �,J \ �. i \� —DISTANCE BETWEEN WELL AND SEPTIC TANK ON ADJOINING PROPERTY i� WELL • DISTANCE BETWEEN SEPTIC TANK \ \ AAANO WELL ON ADJOINING PROPERTY BUILDING \ Q Q� � DISTANCE BETWEEN WELL \ \ AND SEPTIC TANK SEPTIC TANKS �3 A�AWING 10 2 DIRECTION OF FLOW OF SYSTEM FROM HOUSE NORTH Q11 D� SOUTH O DISTRIBUTION EAST O BUILDING _ SrTI TA11K5 \ BOX 't �.-,� WESt 0 1-4 The following information shall be furnished in the above drawings as referred to in Section 20, paragraph 45 of the Village of Orono Building Ordinance. 1. All distances, in feet, shall be plainly marked on Drawing No. 1. 2. Measurements shall be taken from the two farthest corners of the building where a straight line can be obtained to the cleanouts of the first and second septic tanks and to the distribution box. Mark these distances, in feet, on Drawing No. 2. 3. Indicate approximate well location with the letter "W" on Drawing No. 2. 4. Check direction of sewage or waste disposal system as shown on Drawing No. 2.