Loading...
HomeMy WebLinkAbout2314 Olive Avenue - Sewer Televising Report (454)f TO: Mark Willier, First Choice Exteriors For the address: 2314 Olive Avenue Orono, MN Email: mark@firstchoiceexteriorsmn.com Phone: 952-380-9916 HIGHVIEW PLUMBING, INC. 7460 Oxford Street St. Louis Park, MN 55426 highviewplumbing.com email: office@highviewplumbing.com Phone: (952) 933-8600 Fax: 952-943-0932 We proposed to furnish and install for the home situated on (Home, Building, Store, etc) Same as above MN the following material: (Street) (City) (State) - Excavate approx. 100’ from outside clean-out - Install CIPP liner from excavation to 4” PVC near house and out to 6” PVC in boulevard - Repipe access point with Sch 40 PVC pipe & fittings - Excavation, backfilling, labor and material to complete work - Permit with post work video uploaded to City of Orono We agree to furnish and install the material specified above for the sum of $12,840.00 provided that acceptance is received by us within 2 days from the date hereof. We guarantee to install the above material in a workmanlike manner, subject to you or your agent's inspection at any and all times during installation and in compliance with local and state ordinances governing such work. Materials used have passed ASTM requirements for admission to the Universal Plumbing Code and must meet 50-year life expectancy testing. We extend a three-year correction period from date of completion against installation, operational and mechanical defects. Materials used in this installation are covered under the manufacturers’ individual product warranties. We agree to furnish the necessary permits as a part of this proposal and obtain required inspections as mandated by municipality. This constitutes the entire agreement. If extra work or material is necessary, it is hereby understood that an extra charge will be made. It is expressly stipulated and agreed that the undersigned shall not be held liable for damage to unmarked private underground lines (including but not limited to sprinkler lines, electric pet fences & electrical lines to outdoor lights) & any contingencies occasioned by strikes, fire, weather, or acts of other contractors or any other cause beyond his control. An extra charge for unusual soil condition or high water table/dewatering, may apply. For sewer & water, dirt/soil is replaced in order of removal, and existing sod/grass is replaced, if able, to the best of our ability and as weather conditions allow; homeowner(s) responsible for further restoration of toppings as necessary. Size of the excavation site is kept to a minimum but must allow for the placement of our safety box (3’ x 5’) or the size the scope of work dictates and to comply with OSHA safety standards. Payment is to be made as follows: ON COMPLETION of work performed by check or by online payment link (preferred) from bank account sent with invoice. If work is completed prior to closing payment must be made within 30 days or at Closing (if within 30 days). If work is completed after closing title company contact information as well as buyer information must be provided before work will be scheduled (names, emails and phone numbers). A PAID Invoice Receipt/Lien Waiver will be sent after payment in full is received. REMARKS: Acceptance by you shall constitute a contract and Respectfully submitted, Acknowledgment of Contractor Lien Rights notification. The foregoing is satisfactory and is hereby accepted Kyle D. Swanson This day of , 2025 ___________________________________________ Updated 6/10/25 (Owner or Authorized Representative) State of MN Master Plumber’s License #066760PM State of MN Plumbing Contractor License #PC642678 LIEN CLAIMANT NOTICE TO OWNER BY GENERAL CONTRACTOR You have entered into a contract with the undersigned for work as described above at address: same as above . We are authorized to provide you with this notice. You are therefore notified that: (a) Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. (b) Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our contract price, or withhold the amounts due them from us until 120 days after completion of the improvement unless we give you a lien waiver signed by persons who supplied any labor or material for the improvement and who gave you timely notice. Following are listed all contractors, sub-contractors or suppliers this applies to: Highview Plumbing, Inc. Mark willier (Jun 10, 2025 11:38 CDT) 2314 Olive Ave 06/10/25 Final Audit Report 2025-06-10 Created:2025-06-10 By:Susan Swanson (office@highviewplumbing.com) Status:Signed Transaction ID:CBJCHBCAABAAyNYd9apDT9Z-ZAmcla90Fi_0LGdwpjaE "2314 Olive Ave 06/10/25" History Document created by Susan Swanson (office@highviewplumbing.com) 2025-06-10 - 3:10:59 PM GMT Document emailed to mark@firstchoiceexteriorsmn.com for signature 2025-06-10 - 3:11:04 PM GMT Email viewed by mark@firstchoiceexteriorsmn.com 2025-06-10 - 4:38:02 PM GMT Signer mark@firstchoiceexteriorsmn.com entered name at signing as Mark willier 2025-06-10 - 4:38:24 PM GMT Document e-signed by Mark willier (mark@firstchoiceexteriorsmn.com) Signature Date: 2025-06-10 - 4:38:26 PM GMT - Time Source: server Agreement completed. 2025-06-10 - 4:38:26 PM GMT