HomeMy WebLinkAbout2213 Shadywood Road - Sewer Televising Report - Sewer Repair Quotef
TO: Patrick Maloney
2213 Shadywood Road
Orono, MN
Email: mpmaloney93@gmail.com
Phone: 714-926-3743
HIGHVIEW PLUMBING, INC.
7460 Oxford Street
St. Louis Park, MN 55426
highviewplumbing.com email: office@highviewplumbing.com
Phone: (952) 933-8600 Fax: 952-943-0932
We proposed to furnish and install for the home situated on
(Home, Building, Store, etc)
Same as above MN the following material:
(Street) (City) (State)
- Excavate approx. 48’-55’to repair improper pipe size with Sch 40 PVC pipe & fittings
- Clean & CIPP line sewer from excavation towards City Main to bring sewer into compliance
- Excavation, backfilling, labor and material to complete work
- Permit
We agree to furnish and install the material specified above for the sum of $13,680.00 provided that acceptance is received
by us within 15 days from the date hereof.
We guarantee to install the above material in a workmanlike manner, subject to you or your agent's inspection at any and all
times during installation and in compliance with local and state ordinances governing such work.
Materials used have passed ASTM requirements for admission to the Universal Plumbing Code and must meet 50-year life
expectancy testing. We extend a three-year correction period from date of completion against installation, operational and mechanical
defects. Materials used in this installation are covered under the manufacturers’ individual product warranties. We agree to furnish the
necessary permits as a part of this proposal and obtain required inspections as mandated by municipality.
This constitutes the entire agreement. If extra work or material is necessary, it is hereby understood that an extra charge will be
made. It is expressly stipulated and agreed that the undersigned shall not be held liable for damage to unmarked private underground
lines (including but not limited to sprinkler lines, electric pet fences & electrical lines to outdoor lights) & any contingencies occasioned
by strikes, fire, weather, or acts of other contractors or any other cause beyond his control. An extra charge for unusual soil condition or
high water table/dewatering, may apply. For sewer & water, dirt/soil is replaced in order of removal, and existing sod/grass is replaced,
if able, to the best of our ability and as weather conditions allow; homeowner(s) responsible for further restoration of toppings as
necessary. Size of the excavation site is kept to a minimum but must allow for the placement of our safety box (3’ x 5’) or the size the
scope of work dictates and to comply with OSHA safety standards.
Payment is to be made as follows: ON COMPLETION of work performed by check preferred or by online payment link from
bank account sent with invoice - we invoice and allow 30 days for payment. Credit Card Payment accepted, if requested (Please note a
3.50% Processing Fee is added to invoice amount). PAID Invoice Receipt/Lien Waiver will be sent after payment in full is received.
REMARKS:
Acceptance by you shall constitute a contract and Respectfully submitted,
Acknowledgment of Contractor Lien Rights notification.
The foregoing is satisfactory and is hereby accepted
Kyle D. Swanson
This day of , 2025
___________________________________________ Dated 5/20/25
(Owner or Authorized Representative) State of MN Master Plumber’s License #066760PM
State of MN Plumbing Contractor License #PC642678
LIEN CLAIMANT NOTICE TO OWNER BY GENERAL CONTRACTOR
You have entered into a contract with the undersigned for work as described above at address: same
as above . We are authorized to provide you with this notice. You are therefore notified that:
(a) Any person or company supplying labor or materials for this improvement to your property may file a lien
against your property if that person or company is not paid for the contributions.
(b) Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improvement
directly and deduct this amount from our contract price, or withhold the amounts due them from us until 120 days after
completion of the improvement unless we give you a lien waiver signed by persons who supplied any labor or material for
the improvement and who gave you timely notice. Following are listed all contractors, sub-contractors or suppliers this
applies to: Highview Plumbing, Inc.
Mark Maloney (May 27, 2025 10:21 CDT)
Mark Maloney
27th May