Loading...
HomeMy WebLinkAbout1992-04-03 Septic System ApprovalCITY OF ORONO SEPTIC SYSTEM APPROVAL Permit Fee $ Entered By The General Contractor will be given a copy of this report and is responsible for its dis-cribution to all sub -contractors. SEPTIC SYSTEM DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. LOCATION: GENERAL CONTRACTOR: SEPTIC CONTRACTOR: OWNER: ❑ APPROVED CONDITIONALLY APPROVED: COMMENTS: V)(V (Note Changes Below) C �r PHONE: PHONE: PHONE: NOTICE T" INSTALLERS: Anv chances to the aporoved plans and specs Rust have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected and after system installation to avoid compaction of the natural soi ALL DRAINFIELD AREAS MUST BE FENCED OFF Drier to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified that primary and alternate sites are adequately protected. NO VEHICULAR TRAFFIC OF AB7 KIND (cars, trucks, earth moving equipment, etc.) is within 20' of tested drainfield sites either before or after system construction. Ti:is applies to the lot you are working on and all adjacent lots. You could be held liable for damaging sites on neighboring lots. VEHICULAR TRAFFIC CAR CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UXUSABLE. Evidence of traffic on drainfield sites may be cause for revocation of building permits. Damaged alternate sites must be replaced before a Certificate of occupancy will be issued. Date Appro ed By(,City of Orono