Loading...
HomeMy WebLinkAbout1990-10-24 Septic System Approval//V�o CITY OF ORONO permit # SEPTIC SYSTEM APPROVAL Fee $ metered By The General Contractor will be given a copy of this report and is responsible for its distribution to all sub —contractors. Septic system design x not considered as approvv4ed unless this sheet is attached....& R,4v- GF.N�AL CONTRACTOR:�J� (�Ns7 �u C,770" a� f , � ^9, - 5 9 / 9 SEPTIC CONTRACTOR: PHONE: OWNER: M /^'1 C -I r LA �{ 2- - q8 / ❑ APPROVED CONDITIONALLY APPROVEED: Note Changes Below CcinrF, : IS,F- J-�V.-A IGS zOoO Qt?t� - %F,SdM I PQw Pa �4 L2 ztil /Lsa /: l.(..ywS th�L �LECsi�d�r2 F� !eC'r U!• r4l�AC,T�7 d � G%O� a �.-r C7uNfl _ay� /oak 1 r� Z Pe-R-F, KATr1eA-L_1, y Perms } Ct`�T 2 Lol►� D sr `�STE • Gem ,4T Zy HvrA-t (WA fjZL S/7-6 eonoGinovs $eTo FINoaL/ziiuG PUt-AP �X` Gt PS Lb PE 9UtxFF ,4> V 6CS ions / s / n•c P� �,e�-! vE Tee c /��r NOTICE TO INSTALLErRS: Any chances to the approved plan and specs must have Prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. NOTICE TO GENERAL CONTRACTORS: Drainfield sites musz be protected nrior to and after system installation to avoid compaction of the natural soil. Drainfield areas must be fenced off to eliminate all traffic over them. /o - 2 y-qo Date Approved By prlt_#�d