HomeMy WebLinkAbout1990-10-24 Septic System Approval//V�o
CITY OF ORONO permit #
SEPTIC SYSTEM APPROVAL Fee $
metered By
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub —contractors. Septic system
design x not considered as approvv4ed unless this sheet is attached....& R,4v-
GF.N�AL CONTRACTOR:�J� (�Ns7 �u C,770" a� f , � ^9, - 5 9 / 9
SEPTIC CONTRACTOR: PHONE:
OWNER: M /^'1 C -I r LA �{ 2- - q8 /
❑ APPROVED
CONDITIONALLY APPROVEED: Note Changes Below
CcinrF, : IS,F- J-�V.-A
IGS zOoO Qt?t� - %F,SdM I PQw Pa �4 L2 ztil
/Lsa /: l.(..ywS th�L �LECsi�d�r2 F� !eC'r U!• r4l�AC,T�7 d � G%O� a �.-r
C7uNfl _ay� /oak
1 r�
Z Pe-R-F, KATr1eA-L_1, y Perms } Ct`�T 2 Lol►� D sr `�STE
• Gem ,4T Zy HvrA-t (WA fjZL S/7-6 eonoGinovs
$eTo FINoaL/ziiuG PUt-AP
�X` Gt PS Lb PE 9UtxFF ,4> V 6CS ions / s / n•c P� �,e�-! vE
Tee c /��r
NOTICE TO INSTALLErRS: Any chances to the approved plan and specs must have
Prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
NOTICE TO
GENERAL CONTRACTORS:
Drainfield sites musz
be
protected nrior to
and after
system installation
to avoid compaction
of
the natural soil.
Drainfield
areas must be fenced
off to eliminate all
traffic over them.
/o - 2 y-qo
Date Approved
By
prlt_#�d