HomeMy WebLinkAbout1990-05-18 Septic System Approvalcc*>f^o coPy
dTT OF OROHO
SEPTIC SYSTEM EFFROyEL
PeZBit
Pee $___
Entered By
The General Contractor will be given a copy of this report and is
responsible for its distribntioa to all snb-contractors. Septic system
design is not considered as approved unless this sheet is attached.
xocMicffl: ’TjgP/*-
CTwg»«Ti cQiiraACiOR; ^Oi»ttr'S ^'y?~ZSO^
SEPnC CORIllACTORs___________________________________ PHOKEs____________
OfWgB; lA>Jt:>lȴC.M\LU.
^MsAPPROVZD , , ^
□ CONDITIONMiy ASraOVED^j^Note^ IJ
COMMEHTS sJ'^^A'O^ )S(00 - f'Z^O ^
5choi=> ^ |gOC4iiL>\ .
<’P 4’g^ST7/^<j>
Both pZ)MAP>'f
C/ge-- ^/res._____________
notice to IKSTALLERS: Any changes to the approved plan zmd specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
CB TO GlgNKiKAi» CONTRACTORS: Drainfield sites must be protected prior to
.na after system installation to avoid compaction of the natural soil,
rainfield areas must be fenced off to eliminate all traffic over them.
-90
Date Approved