HomeMy WebLinkAbout1993-05-13 On Site Sewage Treatment Inspection ReportCITY OF ORONO
Municipal Offices
Post Office Box 66
Crystal Bay, HN 55323-0066 ON>SITE SEWAGE TREATNENT
INSPECTION REPORT
Permit ^t Contractors i j!lii/Qiir^
Owner:
City ordinance niMber 100 requires that each on-site sewage treatment system in Orono be inspected on a regular basis.
The on-site sewage treatment system at the above address has been inspected and appears to fall into the category
checked below.
(This is ^ an existing system [ ] new construction)
§lYSTEH COMFOBMITY (1-3);I
••CODE SYSTEM''-A system which meets all the location, design, and construction standards of the current City
Codes, and which is operating satisfactorily by tre-'ting and disposing of the entire current sewage input
without discharging any pollutants into ground or surface waters.
"CONFORMING SYSTEM"-A system which does not meet all the location, design, and construction standards of the
current City Codes, but was installed according to the code in effect at the time of installation, and which
is operating satisfactorily by treating and disposing of the entire current sewage input without discharging
any pollutants into ground or surface waters. . .
"NON-CONFORMING SYSTEM"-A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, and construction standards of the current City
Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand
between the distribution device and the limiting soil characteristics.
(The limiting soil characteristic 1(6. has or t ] has not been identified at this time. If the limiting soil
characteristic has not been identified, this classification may be subject to revision.)
TANK CONDITION (5-10); ^
¥inspection indicates:
Punpout not needed at this time.SolTds accunulation in tanks indicates they should be pumped out this year to help prevent future problems.
Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible.
the surface. Tanks must be punped out within 48 hours to eliminate surface discharge,
-tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each
It. If tanks have not Been pumped out within the last three years, they should be punped
Inspection pTpe is located directly over tank baffle (does not give accurate measurement of solids accumulation).
If tanks have not been pungiea out within the last three years, they should be pimped out now.
System is discharging to
Inspection risers missing
tank at next pimpout
out now.
ORAINFIELD CONDITION Ml-mrjs:
Orainfield inspection indicates:
iL Orainfield is dry, no surfacing evident.
Some evidence of surfacing, not critical yet.
Orainfield is saturated and visibly discharging untreated effluent to the surface.
immediately. Repairs must be completed within 90 days.
Orainfield extent and condition unknown.
Contact the City Inspector
LIMITING SITE FACTORS fslooe.setbacks.etc.): I/uTT_ _ _ _ _ _ _ _
POTENTIAL FOR SYSTEM FAILURE (depends on soils.water table.etc.):
(X)MMENTs: ^ />/ 'hp fy? s
Date of Inspection ^ptAC System Inspector
Mote: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of
property, be advised that this report does not guarantee or certify that an existing system will continue to function
properly, but is merely an opinion of the adequacy of the system under current conditions based on the available
information.
This report must be kept on the premises with the system location and pumping records.
WHITE COPY < Inspectors File YELLOW COPY Homeowner