HomeMy WebLinkAbout1991-11-26 Septic System ApprovalCITY OF ORONO
Permit J
SEPTIC SYSTEM APPROVAL
Fee $
Entered By
The General Contractor will be given a copy of this report and is
responsible for its
OtAS APPROVED UNLESSuTHIS SHEETtISsATTACHEDC SYSTEM
DESIGN IS NOT CONSIDERED
LOCATION: a -7
PHONE ::/L
GENERAL CONTRACTOR:
PHONE:
SEPTIC CONTRACTOR:
PHONE:
ONNER:
Q APPROVED
_CONDITIONALLY APPROVED:
COMMENTS: 1 IO��Il _g
(Note Changes Below)
M
gg a l
NOTICE TO of INSTALLERS: Inspector (y73 angel Call for inspe tions 24 hours'in advance have prior
PPthe
NOTICE TO GE1fERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected
prior to and after system installation to avoid compaction of the natural soil.
ALL DR)IIAFIZ�LD AREAS Mass building Opp prior to building site excavation and fencing must
remain in place until final site grading. Approval to pour footings will not he granted
until the Inspections Department has verified that primary and alternate sites are
adequately protected.
th
owed
NO VEHICULAR TT tested drainfield drainfie dZaiteaa either cbeforeror aft rg system econstruction.
This
within 2t of
applies to the lot you are working on and all adjacent lots. You could be held liable for
damaging sites on neighboring lots.
I{PACTZOH, RENDERING DRAZ1iPIELD SITES UNUSABLE'
VEHICULAR TRAFFIC CAN CAUSE SOIL CO
Evidence of traffic on drainfield sites may be cause for revocation of buildingpermits.
Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued.
���1/ By City o rono
Date Approved