Loading...
HomeMy WebLinkAbout1990-03-19 Septic System Approval02oNC ;^nPY CITY OF ORONO Permit # SEPTIC SYSTEN APPROVAL Fee $ Entered Ey The General Contractor will be given a copy of this re-•-3rt and is responsible for its distribution to all sub -contractors. Septic system design is not considered as approved unless this sheet is attached. LOCATION: ��$ C C • -y��W-A-r L. cEeMERAL PFyAA-&j & �6 ^o%p S bV c-- -r-l"^ wAh L 9 YZ - 70 t 3 SEPTIC CONTRACTOR: PHONE: Oma: APPROVED CONDIITIONALLY APPROVED: N, --)-.e Changes Below C0l43MTS:(Stn TtIT fjcs VS/NG co.t4— 3 -5-90 n.1 . J N&: / )o r boSF T : Saw- -rAoJKz /Dori /ooa - i 2sa w/�+� s AuAm&- Q�t►.� �ryi/�=iE•r �QyLg p'ec.� sr� . 3Yv9Z S&jfl ALL to 7 NOTICE TO INSTALLERS: Any chances to the approved plan and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. ,�,.NOTICZ TO GENERAL CONTRACTORS: Drainfield sites must be protected prior to .\ and after system installation to avoid rorDaction of the natural soil. Drainfield areas must be fenced off to eliminate all traffic over them. �-l9-go n .�.�,• Dace Approved By