HomeMy WebLinkAbout1990-03-19 Septic System Approval02oNC ;^nPY
CITY OF ORONO Permit #
SEPTIC SYSTEN APPROVAL Fee $
Entered Ey
The General Contractor will be given a copy of this re-•-3rt and is
responsible for its distribution to all sub -contractors. Septic system
design is not considered as approved unless this sheet is attached.
LOCATION: ��$ C C • -y��W-A-r L.
cEeMERAL PFyAA-&j & �6 ^o%p S bV c-- -r-l"^ wAh L 9 YZ - 70 t 3
SEPTIC CONTRACTOR: PHONE:
Oma:
APPROVED
CONDIITIONALLY APPROVED: N, --)-.e Changes Below
C0l43MTS:(Stn TtIT fjcs VS/NG co.t4—
3 -5-90
n.1 . J N&: / )o r boSF T : Saw-
-rAoJKz /Dori /ooa - i 2sa w/�+� s AuAm&-
Q�t►.� �ryi/�=iE•r �QyLg p'ec.� sr� . 3Yv9Z S&jfl ALL
to 7
NOTICE TO INSTALLERS: Any chances to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
,�,.NOTICZ TO GENERAL CONTRACTORS: Drainfield sites must be protected prior to
.\ and after system installation to avoid rorDaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
�-l9-go n .�.�,•
Dace Approved By