Loading...
HomeMy WebLinkAbout1993-12-20 Septic System InformationSEP!IC SYSTEM INFORMATION STREET ADDRESS LOT 4 BLOCK 2 SUBDIVISION Tandem Prnpertiec Dickey site MONTH AND YEAR TESTING DONE 12-20-93 ITEMS ALREADY COMPLETED Borings, perc. tests, system design, and site plan NEED TO COMPLETE BEFOR: ISSUING BUILDING PERMIT: ❑ BORINGS ❑ PER.0 TESTS ti SYSTEM DESIGN X❑ SITE PLAN A new site plan may be required if the house location or elevations are significantly different. ❑ OTHER ❑ COMMENTS DATE THIS SHEET FILED January 13, 1994 BY Stephen Weckman SUBDIVISION FILE NO. 1901