Loading...
HomeMy WebLinkAbout1993-12-19 Septic System Design ReportS -P TESTZNGP INC. Dickey site Lot 6, Block 1 Orono, Henn. Co., MN I Steven B. Schirmers — MPWA (R. No. 627 951 Katydid lane NE • St. Michael, MN 55376 • (612) 497-3566 December 19, 1993 This On -Site Sewage Treatment System is Designed for a Type 1, five bedroom home in accordance with the Minnesota Pollution Control Agency Chapter 70PO and local ordinances. The soils on this site are SCS soils mapped - LrB - Lester loam. A seasonally high water table was located at 12" to 36", (mottled soil). Due to the seasonally high water table, a Pressurized Mound System will nee' to be installed. The bottom of the rock bed must be located at least 3' above the seasonally high water table. The soils at a depth of 12" have a percolation rate averaging !� min/ inch. ,pumping chamber will need to be installed to lift the effluent to the treatment area. The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located out,:i.'e the manhole and pumping chamber in a weather proof enclosure. A w A ng device must be installed with a light and sound device, this is in case of a pump failure. Mercury floats are a good method. All neighboring wells are located greater than 100' away from the proposed treatment area. CONT'D Dickey site lot 6, Block 1 Orono (2) l Keep all heavy equipment off of the proposed treatment area before and after construction. The treatment area should be marked off before construction. This Design is not valid & the System will need to be relocated if failure to protect the areas proposed for On -Site Sewage Treatment occurs. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than gray water, (laundry, showers, etc.) human waste & toilet tissue should be disposea of into the septic tanks. Garbage disposals are not recommended. Smaller amounts of laundry soaps, dish soaps, cleaning agents, etc. are better for the system. Antibacterial soaps & chlorine agents may kill the bacteria needed to treat septic effluent properly. Additives are not recommended, they may cause harmful damage to your system. Recommend to pump & clean your tanks by a certified pumper every year if you have 1 tank & every 2 years if you have 2 tanks to insure proper maintenance. Steven B. Schirmer��� SBS/ds n C7 n m IOr C) x iZ h z� r O � �- TO w - s _ u+ i � J f? I I n C7 n m IOr C) x iZ h z� r O �- TO • io i fm N ice`s ; 0 x z n C7 n m IOr C) x iZ h � r •- Q1 f? I I r• p I r r• N -u O A o z f) (n l_ A � ' c 'o I rap o ? 0 0 0 ` �iN��333 Ioo r C 3 OI� p -u O A o z f) (n l_ A -AR A � ' c 'o I rap o ? 0 0 0 ` �iN��333 Ioo n.* -3 —4. 7 A (p 3 OI� p n. A Q O N n o pQ pp z w N° OZ uA 0 1 �i m (1 f �� r- rrrr- r '� '� IN�� n � Oar Ell 1 g a J �6or � N 0 C9 vv �s $V- 0 3 2 g g v 7 � o p �j R Y (si o0 z n o ry O A 3 o v p ? _Inc, eC co b� -- A -AR A � ' c 'o I rap IfJ �J IN ? 0 0 0 �iN��333 Ioo n.* -3 n. A Q O N r o N N ;ri v w N° OZ uA o 1 �i m (1 f �� r- rrrr- r '� '� IN�� n � Oar A � J �6or � N 0 vv �s u� v n v 7 � o p z n co b� o A -AR LO 3 ' c a 0 v ^. A I rap IfJ �J IN ? 0 0 0 �iN��333 Ioo n.* -3 n. A Q O N O O O 3 3 3 3 N N ;ri v A N N — 0 3 N OZ uA r 8 n � 1 A � J � N 0 vv �s v n v 7 � o p z n LO MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW Estimated 0-<0 gpd (seepages D-7 or 1-3,4,S) or measured - gpd x 1.5 = -- B. SEPTIC TANK LIQUID VOLUlt4ES /-);L<-)" I ,_ gallons (seepages C-3 or C-5) C. SOILS (refer to site evaluation) 1. Depth to restricting layer = 1 ,�t =cc ' inches``�f 2. Depth of percolation tests = 1 inches 3. Percolatio .ate -5�� mpi 4. Land slope 6 % Estimalod Sewage Flows iw Gallufts par Jay (gpd) . wnbor Ra to of Abaspsiott width p Rock (ay0 wom Ratan Ibaft 0. t 0 Coro So" Of Type i Type 11 Type III T�pe ncst�t Rine Saftd'• 0.60 LM v 2 300 225 Igo t nat7t 3 450 300 211 WS 4 600 375 256 'at" 5 750 450 247 a'n 6 900 525 332 Tir 1. 7 1050 600 370 mw 1 1200 673 409 errs Soyl'c Tani C.P-Ai% In a•IL..• 1. Ikdrwm• Cum,.y yv�.:y ...10J.Po.1sa a t>ap: ,w..l 2 a kw 750 1125 fr4 1010 15x0 4 s 6 IfuD 2250 7.1 in 9 xW 7000 D. ROCK LAYER DIMENSIONS 1. Multiply flow rate by 0.83 to obtain required area of rock layer: Daily Flow x 0.83 = r),<0 gpd ,. ' - --sq. ft. /gpd = a a sq. f t.-1 I r. 2. Select width of rocj;,wyer (10 feet or less) _ / ft. 3. Length of rock layer = Area + Width = t,VL4 sq. ft. + 1_ ft.= re/ ft. E. ROCK VOLUME 1. Multiply rock area by rock depth to get cubic feet of rock; Gam. sq. ft. xo{ ft. = 2ts� cu. ft. 2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards; 21j� cu. ft. + 27 = _3,? cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; -0 cu. yd. x 1.4 ton/cu. yd. _ 3je. tons. F. ADSORPTION WIDTH /--L-A,-4 I -o xk rl 1. Percolation rate in top 12 inches of soil is !�- q mpi 2. Select allowable soil loading rate m table on page E-; . ti ft= 3. Calculate adsorption width ratio by dividing rock layer loading rate of 1.20 gpd/ft2 by allowable soil loading rate; 1.20 gpd/ft2+ '4S gpd/ft2= _ rad . Check this value on page E-16. 4. Multiply adsorption width ratio by rock layer width to get required adsorption width; X p ft ft �--- L.et7gth Abnrpthm Width SiatMll Table lOwcobdonitaft ift Mil -es_ Ittd (1V1►1J SoU Te twe Galbfta par dry par fgllaea f001 Ra to of Abaspsiott width p Rock (ay0 wom Ratan Ibaft 0. t 0 Coro So" 0.1465 Sand 1.J0 IAO 0.1 aft S as Rine Saftd'• 0.60 LM 6 * 13 Sardy Man 0.79 132 16 a 30 t nat7t 060 200 31 b 45 Sib l.oatft 0.50 2.40 161060 Clay a aftto 0.43 2.67 60 to 120 Clay 0.24 S.UU slower daft pay 12tH• G. DOWNSLOPE DIKE W1D•1 r► 1. If landslope is 3% or more, subtract rock layer width from adsorption width to obtain minimum downslope dike toe for absorption: .1L. ft- Y_ft= feet 2. Calculate minimum mound size based on geometery: a. Determine depth of clean sand fill at upslope edge of rock layer: Separation 1 • o feet b. Multiply rock layer width by landslope to determine drop in elevation; Slope Difference x % + 100 feet c. Add depth of clean sand depth of clean sand for tj' �• L-•- 26•• a--•• separation at upslope edge (2a) to depth of rock layer to rock depth and the depth of cover to find the total mound W.66 height at upslope edge of rock layer; 1.0 ft + 1 ft + 1 ft = -. y feet d. Enter table on page bottom with landslope and upslope dike ratio. Select dike multiplier of e. Multiply dike multiplier by upslope mound height to get upslope dike width: 3 • o x ; = lo feet f. Add the depth of slope difference (2b) to the upslope height to get the downslope height 3.p +. (o_= 3 . (. feet g. Enter table on page bottom with landslope and downslope dike ratio. Select dike multiplier of t. h. Multiply dike multiplier by downslope mound height to get downslope dike width: 3. V x S.zu = )'It feet L Compare the values of step G.1 and Step G.2.h. Select the greater of the two values as the downslope dike width; /9 feet j. Total mound width is the sum of upslope dike HOC i%Q'd '_j�`WW width plus rock layer width plus c'.r. wnslope dike width; s: _ _ `ip:wavft+1Qft+ ft=M.op+=.� k. Total mound length is the sum of upslope dike width lus rock layer length plus P Y S upslope dike width; - _ Jo ft + ��_ ft + feet L )'.7a:l..a•!.___ Zl 11 4:1 rwns op.:ps 5:1 L1 7:1 3:1 ll oN 5:1 kl 7:1 8:1 16 Nope 0 30 40 5.0 60 70 30 4.0 SO 60 7.0 {.0 1 30 4.17 526 h35 733 291 3.65 475 $.66 656 741 2 319 1.35 556 5; 614 2 s) 3. 0 4.4 5.36 614 6 v0 1 ).30 '4 5.191 7I) �.6 357 4); s04 ;-9 64i 4 44: 623 2b 34t 4:7 414 C4« 6:'.• 353 ea wl 7 4?. 07 24 2:3" 3h; 441 4:3 $41 7 ) {[I ^S.fs 764 10.;. 13 73 '?.4{ 712 3.M 4 73 4 70 S13 39S S.Y {33 1156 15.91 2.12 IM 357 4 05 449 4&9 9 4.11 X25 9.09 13 04 16.92 236 2,94 3.43 3.9U 630 4 65 10 4-19 6.67 10.0 1500 2737 211 2.116 333 175 412 11 444 7.14 :1.11 lit 1`t) 226 279 323 361 3v5 426 :2 1.69 7.49 1230 2' 4 t .. ::1 2 70 3 12 3 44 1 ±0 4 OR A. Determine pump capacity: Gravity Distribution 1. Minimum suggested is 600 gallons per hour (10 gpm) to stay ahead of water use rate. 2. Maximum suggested for delivery to a drop box of a home system is 2,700 gallons per hour (45 gpm) to prevent build-up of pressure in drop box. Pressure Distribution 3. a. Select number of perforated laterals b. Select perforation spacing = ft. c. Subtract 2 ft. from the rock layer length. -2ft._ _ ft. d. Determine the number of spaces between perforations. Length pert. spacing r ft. + ft. = spaces e. = spaces + 1 = perforations/lateral f. Multiply perforations per lateral by number of laterals to gM total number of perforations. G=6 x ;j= L perforations. g. ' x j;7.': -w - gpm. SELECTED PUMP CAPACITY gpm D. Determine head requirements: 1. Elevation difference between pump and point of discharge. '� feet 2. If pumping to a pressure distribution system, add five feet for pressure required at manifold feet 3. Friction loss a. Enter friction loss table with gpm and pipe diameter. Read friction loss in feet per 100 feet from table. F.L = ;) .(-. ft./100 ft of pipe b. Determine total pipe length from pump to discharge point. Add 25 percent to pipe length for fitting loss, or use a fitting loss chart. Equivalent pipe length -1.25 times pipe length = C. x 1.25 = _'W I -feet c. Calculate total friction loss by multiplying friction loss in ft/100 ft by equivalent pipe length. Total friction loss= x `! 1 +100 = feet 4. Total head re luired is the sum of elevation difference, special head requirements, and total friction loss. 1. + ♦ 1 (1) (2) (36 TOTAL HEAD r ;- feet C. Pump selection 1. A pump must be selected to deliver at least = gpm (Step A) with at Icast �-7.- feet of total head (Step B). END PERFORATION OF A PERFORATED LATERAL TNra 10 • � ! SW lMr •: ' � d aWs14mM FiMk for %W, d N�e� r..1 y. IMrIw bMM wNnn��ur LNa rw %a •i: n u LMM u• a taN M� •1 raa L&M • - f+u/"Wft Lamw H ' CMM sow Lerw 1104wM M L4WV =,1.,''w"M' TABLE OF PERFORATION DISCHARGES IN GPM Head Perforation diameter 0nchm) 10 r/rr y. ] be 0.56 024 1s OA9 M90 2 -Ob 0A0 1.01 2s ON 1.17 3A 0.96 128 4.0 1.13 1.47 SA 126 145 aUw 1.0 toot of head he residential sytlems. bUm 2.0 feet of Mead for other asubHshtnsb Pipe Length Point of Discharge 1'1 Eleation Dif%rttLcePump o) '7 . F -18b 1.5 irv-h 2.0 inch 3.0 inch 81xn Fiiaiea Ler Pw tae R of pirm 10 0.69 0.20 12 0.96 0.28 14 1.28 0.38 16 1.63 0.49 18 2.03 0.60 20 2.47 0.73 0.11 25 3.73 1.11 0.16 30 5.23 1.55 0.23 35 7.90 2.06 0.30 40 11.07 2.64 0.39 45 14.73 3.28 0.48 50 3.99 0.58 55 4.76 0.70 60 5.60 0.82 L-13 CERTlV1 1 Gut,t, 1 Soil Isurir._.is Location or Project Dickey site. Lot 6, Block 1, Orono Borings made by ;;-p vesting, Inc. Steve Schirmers Date 11-17-93 Classifiction System: AASHO USDA -SCS X Unified Other Auger used icheck two): Hand X or Power Flight , or Bucket X Depth, Boring number _ 1 Depth, Boring number 2 in in feet Surface elevation 979.2 feet Surface elevation 981.0 J- ----- - - - - 0 Topsoil brown loam 0 - 1' Dark brown loam 2 - 3 _ 1' - 3' -MOTTLED 3' Rusty dark gray loam 4 - 3' - 412" Rusty olive gray clay loam 5 - 4'2" - 5' 6 - 7 - 8 - End of boring at 5' feet. Standing eater table: present at 1' feet of depth, 17 hours after boring. Not present in hole Mottled soil: Observed at 3' feet of depth. Not present in hole Comments: Topsoil brown loam _ 0 - 1'2" 1 Dark brown loam 1'2" - 1'8" Dark brown clay loam 2 - 108" - 212" Brown clay loam 2'2- - 2' 8" -R)nTM 3 Rusty gray brown sandy loam 4 - 2'8" - 4-1/2' Rusty olive brown loam 5 _ 4-1/2' - 5' C3 7 - End of boring at 5' f0et. Standing water table: present at 4' feet of depth, 17 hours after boring. Not prevent in ;tole Mottled soil: Observed at 2'8" feet of depth. Not present in hole Comments: CI:P'i'::'1 _"..;'IOf: '! UU62 / 1.�;+.: o�_ Location or Project Dickey sita_Lot 6. Block 1, Orono _ Borings made by :;-p ;PstinQ, Inc. Steve Schirmers Date 11-17-93 Classifiction Sy3tem: AASHU__; USDA -SCS X Unified Other Auger used (check two): Hand X , or power Flight or Bucket Depth, Boring number 3 depth, Boring number 4 in in feet Surface elevation 978.8 feet Surface elevation 981.3 J- -- - 0 - - Topsoil dark brown clay loam Topsoil very dark 1 - 0 - 1' 1 - gray loam Dark brown loam 2 - 2 _ 0 - 2' -MOTTLED 2' Rusty very dark gray loam l' - 2'8" -MOTTLED 2'8 2' 2-1/2' Rusty olive gray clay Rusty dark gray clay loam 3 - 218" - 314" loam 3 - 2-1/2 - 312" Rusty olive gray 4 _ Rusty olive gray 4 - clay loam loam 5 _ 314" 5' 5 - 3120 5' 6 - 7 - 8 - End of boring at 5' feet. Standing water table: present at 2'5" feet of depth, 17 hours after boring. .ot present in hole Mottled so':1: Observed at 2'8" feet of depth. Not present in hole Comments: 6 - 7 - 8 - End of boring at 5' feet. Standing water table: present at 107" feet of depth, 17 hours after boring. Not present in hole Mottled soil: Observed at 29 feet of depth. Not present in hole Comments: ta,t_; or `;oil Lur i nYs Location or project Dickey Site, Lot 6, Block 1, Orono Borings made by --p sestina, Inc. Steve Schirmers Date 11-17-93, Classifiction System: AASHO USDA -SCS X Unified Other Auger used (check two): (land X or power Flight or Bucket X Depth, Boring number 5 Depth, Boring number 6 in in feet Surface elevation 982.9 feet Surface elevation 980.8 0 Topsoil dark brown loam Topsoil dark brown clay 0 - 10" 0 - 1' -MOTTLED 1' loam 1 - Brown clay loam 1 - Rusty olive brown clay loam l' - 1-1/2' 10" - 1'8" -MOTTLED 1'8 Rusty olive brown 2 - 2 - sandy loam Rusty olive gray 1-1/2' - 2'8" clay loam 3 - 3 - 4 - 5 - 6 - 7 - 8 - 1'8" - 3'10" Rusty olive gray loam End of boring at 5' feet. Standing water tacle: present at 2'7" feet of depth, 17 hours after boring. Not present in hole Mottled soil: Observed at 11811 °,et of depth. Not present in hole _ Comments: 4 - 5 - 6 - 7 - 8 - Rusty olive gray loam 2'8"- 5' End of boring at 5' feet. Standing water table: present at 3-1/2' feet of death, 17 hours after boring. Not present in hole Mottled soil: Observed at 1feet of depth. Not present in hole Comments: CERT.#00627 PERCOLATION TEST DATA SHEET Percolation teat readings made b% S—P Testing, Inc. „ t, 11-18-93 in� ,t 8:41 p I„ Test hole location LOt6 , B1 k . 1 ,Dickey site }tole number 2 Date hole �kas prepared 11-17-93 Depth of hole bottom 12 inches. Diameter of hole 6 inches Soil data from test hole: Depth. inches Soil tcuure 0 — 12" Topsoil brown loam Method of scratching sidewall Kni f a Depth of gravel in bottom of hole 2 inches 11-17-93 3.3�m 12 Date and hour of initial water filling . Depth o It, Nater (filling inches above hole bottom Method used to maintain at least I: inches of water depth in hole for at least 4 hours Automatic siphon 6 Maximum mater depth above hole 1' atom durinc test inches ime Time interval. minutes Measurement. inches Drop in water level. inches Percolation rate. minutes per inch Remarks 8:25 pref ill 6 8:41 8:56 3-5/16 4.5 15 min 9:32 9:47 3-3/16 4.7 " 10:02 10:17 3-1/8 4.8 I " I i Percolation rate = 4.7 minutes per inch. CERT.##00627 PERCOLATION TEST DATA SHEET S -P Testing, Inc. 11-18-93 8:43 ' Percolation to<t readings made by _un _starting aI p Ill. Lot6,B1k.1,Dickey site 4 "'�'' 11-17-93 Test hole location , }Hole number Date hole was prepared Depth of hole boaorn 12 inches. Diameter of hole 6 inches Soil data from test hole: Depth. inches Soil texture 0 — 12" Topsoil very dark gray loam Method of scratching sidewall Knife Depth of gra%cl in bottom of hole 2 inches 11-17-93 3:30pm 12 Date and hour of initial water filling . Depth of initial water filling inches above hole bottom Method uses, ,o maintain at least 12 inches of water depth in hole for at least 4 hours Automat ie s iphon 6 Maximum water depth above hole bottom during tesL—inches ime Time interval. minutes Measurement. inches Drop in water level. inches Percolation rate. minutes per inch Remarks 8.25 prefill 6 8:43 9:13 3-3/4 4.0 30 min 9:30 10:00 3-5/8 4.1 " 10:04 10:34 3-5/8 4.1 i I { l Percolation rate = 4 . 1 minutes per inch. CERT.#00627 PERCOLATION TEST DATA SHEET a.m Pcrofl.iuontcstrcadtn_­ntadehI, S—P Testing, Inc. 011 —11-18-93 ,ianim_.,t 8:42 (_a. m, Test hole location Lot6,Blk.1,Dickey site Holenumher 3 W Date hole %%.I,prepared 11-17-93 Depth of hole bottom 12 inches. Diameter of hole 6 inches Soil data from test hole: Depth. inches Method of scrat,hing sidewa Soil texture .. ... - - 11111MIM Depth of gravel in bottom of hole-----2—inches 11-17-93 3: 12 12 Date aW hour of initial "iter filling . Dept o tmnal "ater fil line inches above hole bottom Method used to maintain at least 12 inches of water depth in hole ft -rat least 4 hours Automatic siphon 6 Maximum �%ater depth above hole bottom during test inches imc Time interval. minutes Measurement. inches Drop in water level. inches Percolation rate. minutes per inch Remarks N 4-7 IS Min 9//:31 9.46 N N 10:03 ilowlsI N i N N t i l 1 Percolation rate = 4.8 nunute• per inch CERT.#00627 PERCOLATION TEST DATA SHEET ' • " S -P " " ' i ng, Inc. 11-18-93 8:44 ` a.m. Percolauun test ;eading� made h%__ on slartin_ at p.m. Lot6,Blk.1,-. to 5 11-17-93 Test hole Il1eJIIQn . Hole nun.her .Date hole aas prepared Depth of hub: hottonn inches. Diameter of hole inches Soil data from test hole: Depth. inches 0 — 10" 10" — 12" Slsthod of scratching sidewall_—Y, Soil texture Topsoil dark brown loam Brown clay loam Depth of gravel in bottom of hole 2 inches 11-17-93 3:30pm 12 Date and hour of initial water filling . Depth or initial \% iter filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 Maximum a iter depth above hole bottom during test inches ime 1 Time interval. minutes Measurement. I inches Drop in water I escl.inches Percc,lation rate. minutes per inch Remarks 8:25 prefill 6 8:44 8:59 3-1 8 1 4.89: 29 9.44 IN 10.05 10: 20 I I Percolation rate = 4.8 minutes per inch. CERT.R006z7 PERCOLATION TEST DATA SHEET Percolation test readines made b%- S—P Testing, Inc. Lot6,B1k.1,Dickey site Test hole location Hole number— Depth of hole bottom 12 inches. Diameter of hole 6 Soil data from test hole: Depth. inches • .4 11-18-93 8:45a.m. stanin_ ar `p.rn— 6' 11-17-93 _.. Date hole %%as prepared inches Soil texture 0 — 12" Topsoil dark brown clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 11-17-93 3:30pm 12 Date and hour of initial water filling . Depth of ir••'.al water filling _inches above hole bottom Method ust:1 to maintain at least 12 inches of water depth ir, f • for at least 4 hours Automatic siphon N14 .. gum water depth above hole bottom during test 6 inches .'ime Time interval. minutes Measurement, inches Drop in water level. inches Percolation rate. minutes per it h Remarks 8:25 prefill 6 8:45 9:15 4-1/16 7.4 30 min 9.28 9.58 n" 10.06 10:36 " Percolation rate -- 7.4 minutes per inch.