HomeMy WebLinkAbout1982-11-15 Septic System Design ReportFOR "OPKINS CONSTRUCTION, INC.
1PLR- JL 11
E�>rv, 98,5 1
loco t000
GAL Gni. P"''o
SE�TrC Sit>iv S-1 EL.-
1MV. EL.994.0 ZuV, Et.
983.E 1►J v . Et, . X183,3
1D\el C t4o—% %C) SC At"
Vo QC£. .
�!A -SIT E k EEV3GE Y12�F�t t�Et� ` SYS T ENS
Loi 4 t "3 LE; , I Co ll �� T �>— Y Si 0 C
�'
-
Ck�ECI. Vj11-/E , IF 1lJS i A�C.t.t, S (�J.�I_A
�3C W 1TN;�J t kiL
"MoutJr,'�
LU �R_E.vc_�, � F2EC.L'.r_>G G:-
"FpCtGc- 1-i��•I►J
�U;:frJ
L--\ C
Yl^ 1 to
✓
�1,)
'Pu I P IUG STA—, NA[La L AT C.CAST
"Pum;- :�TI•.tz�T,. �� ,� r U r1i'
---ro.p„
✓
:i.�
_ � Sc srf'��l_ E CAP Lt ; �' A r3 o v ri
pd G qtr ►.�
l . r -t 2 ►1 lc;�
o S
✓
\�G
x:.11 A (� U C,-, J i C� V_ 1 T U r,� i`_ T A ILS S
5 P&-C_t �IChrco
W v L 'V N C. " O
u0
S
Q.X-1R[?--r-:-0JTrc);fcP
Ttit=_ OP_oC) SATF-
% WR'i Nt.��� --,-t L'�StC��
tllAL"
�!A -SIT E k EEV3GE Y12�F�t t�Et� ` SYS T ENS
Loi 4 t "3 LE; , I Co ll �� T �>— Y Si 0 C
177.6 x _ _ ... 251♦. 30 S B`�Sl ��' r ... _ _ .. M.o
EXH,3-
TO: Jeanne A. Mabusth, Zoning Administrator
FROM: Michael 11. Gaffron, Septic System Inspector
DATE: November 6, 1981
SUBJECT: #654 Dicon, Willow Drive South - Subdivision
I have reviewed the submitted r(,r,rt for the above referenced
proposed subdivision, and _ make the following comments:
The report by Borg indicates high -water -table soils throughout
the 6 lots tested.
Lot 1 - Slopes of 8%, 10i. Percolation rates at a depth of
25" - 31" averaged 10 mpi in the primary site and 23 mpi
for the alternate site. Both sites are acceptab' for
standard mound systems.
Lot 2 - Slopes of 4-6s in areas tested. Percolat,,jn rates
averaged 25 mpi in the primary site and 13 mpi in the alternate
site. Bot'1 sites are acceptable for standard mound systems.
Lot 3 - Slopes of 5% - 6% in areas tested. Average percolation
rates averaged 27 mpi for the primary site, and 34 mpi in the
alternate site. Both sites are acceptable for standard mound systems.
Lot 4 - Slopes of 3-4% in areas tested. Percolation rates
averaged 41 mpi in primary site and 20 mpi in the alternate
site. Both site: are acceptable for standard mound systems.
Lot 11 - Slopes of 8-10% in areas tested percolation rates
averaged 40 mpi in the primary site and 31 mpi at the alternate
site. NOTE: CARE MUST BE TAKEN TO PLACE TETE MOUND ON A
SLr,PE OF 6% OR LESS ON THIS LOT.
Lot 10 - Slopes average 6%. P( --solation rates averaged 48 mpi
on the primary site and 87 mpi on the alternate site.
General Comments: Percolation testing was done at a range of
depths from 13" to 31". No real correlation appears to exist
between depth of testing and percolation rates. The soil
borings reflect a seasonably saturated zone beginning at a
a range of depths from 1.2 ft to 2.5 ft. Actual current
perched water tables were found on some sites at a depth
of 3.5 ft. or greater.
Based on the above data, the site evaluations recommendation
for all mound systems is appropriate. I confirmed the soil
boring report wit]-, a boring of my own.
Two additional comments are necessary:
1 - Enough sand should be placed above the surface soil
to maintain a 3' separation between the shallowest mottled
zone and the bottom of the rock bed in the mound. On some
sites this will mean 2' of sand should be placed.
2 - In all cases, mound placement should be at the most
level spot available in the natural topography in the
area tested.
I recommend approval of the subdivision, with the further
stipulation that during road construction the drainfield
sites remain totally undisturbed.
TO: Jeanne A. Mabusth, Zoning Administrator
FROM: Michael P. Gaffron, Septic System Inspector
DATE: June 14, 1982
SUBJECT: 0654 Dicon, 151, Willow Drive South - Additional On -Site
Testing
I have reviewed the submitted soil and site evaluation for the
two lots on the north side of the road in Phase 1. Testing
indicates average perc rates varying from 1 to 48 mpi, with
high water tables (saturated zones) in all but the most northeasterly
site. Mound systems are applicable for all these sites, although
the northern site for Lot 1, Block 1, could support a shallow
trenzh system.
I note that Lots 2, 3 and 4 in Block 2, have been realigned.
By superimposing the previous testing over the new lot lines, it
is apparent that 2 of the 6 perc tests originally done on Lot 4
are now on Lot 3. Technically, additional testing should be done
within the boundaries of the revised Lot 4. However, since the
soils appear to be fairly consistent throughout the division, and
since mounds will be used on all the lots, this minor additional
testing is not critical and may be waived until a house is proposed
for the site.
I will reiterate that mounds should be placed on the most level
sites within the tested areas; and that prior to road construction,
all drainfield sites should be staked off to eliminate traffic
or disturbance.
SEPTIC SYSTEM INFORMATION
STREET ADDRESS
iI
LOT BLOCK C'_ SUBDIVISION (fot-w?job
MONTH AND YEAR TESTING DONE_ LtJ y9p-/
ITEMS ALREADY COMPLETED _ �, if e -c 72F573 _� Rn�eiivG S
✓�n�_s / l�,�/tiG Arrra.3L
NEED TO COMPLETE BEFORE ISSUING BUILDING PERMIT:
••�
7; v
Iiii P-1
'ter'
0 SYSTEM DESIGN
0 SITE PLAN__
O OTHER
oowv*&,'A ",^ N
ate
�, t - L
SUADIVISION FILE NO. -
DATE THIS SHEET FILED "��"�'�c' iiY •7 ��
June 11,
Box' jb9
Wayz:*,
Mr. Richard Conry
21350 Exclesior Boulevard
Excelsior, Minnesota 55331
Dear Mr. Conry:
1981
MN 55391
lie have completed a site evaluation for on-site sewage treatment facilities
on 6 lots located west of Willow Road in Orono, Minnesota. A location map has
been enclosed showing the location of the percolation tests, percolation data,
location of soil borings and relative elevations of the surface at the location
of the percolation tests. (For detailed contours please see topography prepared
by Gary Gabriel). A loo of the soil borings is also enclosed.
The soil borings reflect a uniformly high water table throughout the area
tested. This condition prohibits the installation of conventional soil absorption
systems and shallow trench systems. The percolation rates encountered and the
gentle slopes on this site would indicate that mound systems should be satisfactory
on each of these lots. We recommend that the future homes be provided with mound
systems of soil absorption.
Please call if you have any questions.
Thank you.
OF ORONO
Yours very truly,,
l
Carl li. Borg, P.E.
1
4
VNe jL
440
'd I/
Je.
Ll
VNe jL
440
'd I/
I \ l
r �, �AC.r SND• `�1;�'. `Z7��SOIL 1
off_; 8R .'.'.k _'�t-.�� nk: hwi� .
4`4 LIV(- At SAsilt1% LCR`(
-
M;; ar r tti
Vt
r y mac SP.►1�� taNn^
A �� tyt•• 8e. SAy �. C:.a. '
` • S.1 :T eta, �a.,:;• ;1,4� :,r'wia�
"
C,*. VJ1►Tak �'b
cosi $ILT�' jNu:y. U.AY
iRA" TAu41' 0.41' eve
Mi4iS' " 1N'
w
_ tiA •1-� Ct-i.•a� � -
%of- Was MvY s.,
Ok 1iR Sw..>rN CAAYw
r
S&46 SA+II. L.A •Mss
coa►, (TuIasri'L)r.
1.4' -2.i !r•t�� -M: ; ion,. -
"LAY
Z•, .ri L iL K llb • iA N ri
y.5 rS �N.T.sM tL,T. p lwt SAfop.';
5•S' •�S L; R2 �I�Tt G -AY - R,•M
Rt S :- w►Y
W % ga►tr Mtt> �No.rD
blrr« Ic
o K t%
sof♦ H it�l
�C?r -.4,6' i
V • 1 b
13LWLI-z SA'1hr LW+t1
i 16- : s'
tk �" x y+a,), Ct c
Z - 3.o
L; BR SAO., :Lti . F164
3.0 - 45
t�,•r:: '.plus ti•K� c,U�a
r
.Alit,
tyrt4aixc '',a�N., �_�r,N, mor
4.S` -8a'
5...�,.,.•• �Y .�� � ►", mac.
Mhl."i {.1� LiA �•. 113L:
OvVC- 18 . SAu.-r ^,.AY %71RA
1`�iM�'. •'�;)':Ls� Ld,,,S.` moi:
LT rad aM,�.
M�Av: ;A'j.-
UVJ '.�.tA�sL 1h3��
0 l'
'R� G.� • y n..»
13E �:. " is :A �- '►o'-ss��
a 9i; - Myr••.. i=i
'15
TTz
_ tiA •1-� Ct-i.•a� � -
%of- Was MvY s.,
Ok 1iR Sw..>rN CAAYw
r
S&46 SA+II. L.A •Mss
coa►, (TuIasri'L)r.
1.4' -2.i !r•t�� -M: ; ion,. -
"LAY
Z•, .ri L iL K llb • iA N ri
y.5 rS �N.T.sM tL,T. p lwt SAfop.';
5•S' •�S L; R2 �I�Tt G -AY - R,•M
Rt S :- w►Y
W % ga►tr Mtt> �No.rD
blrr« Ic
o K t%
sof♦ H it�l
�C?r -.4,6' i