HomeMy WebLinkAbout1984-09-26 Insp Notice, FINALW
4
2
Q
W
J
z
0
Cn
cc
LAJ
CL
QC
0
cc
0
W
cc
Q
Z
W
Z
W
cc
J
d
w
11 Ilk C.11-- go. WSW AdEVan. i4OW
---Q���sE c a � �_I�l'�r►_�L- i4 SSS
W J WORK SATISFACTORY PROCEED I I PHOTO TAKEN
) J CORRECT WORK & PROCEED
CORRECT WORK CALL FOR REINSPECTION BEF-ORE COVERING
0 CORRECT UNSAFE CONDITION WITI4IN HOURS INSPECTOR WILL RETURN.
(7 STOP ORDER POSTED CALL INSPECTOR
ANSPECTION REOUIRED CALL TO ARRANGE ACCESS
call for the next inspection 24 hours in advance.
Owner/Contr. on site
Inspector AmA a&_
While Copy'Inspecluf s File
- --- — 47,d*Y 51
Gold CopviSltP Nonce
I)ATE TIME
CITY OF ORONO
CALLED IN
INSPECTION NOTICE
SCHEDULED
��
, V—U� '4"L
PERMIT NO. _
COMPLETED
r 3�
ADDRESS
---
OWNER --
-
- --_
CONTR. --- -----
TELEPHONE NO. _
-._—
! I FOOTING
PL UMBING III
J
SITE INSPECTION
11 FRAMING
MECHANICAL
❑
EXCAV./GHADING/FILLING
11 INSULATION
J
WATER HOOKUP
❑
LAKESHOf4E/WETLANDS
U WALL ,D
❑
METER SET/TURN ON
0
LICENSING
X FINAL
n
SEWER HOOKUP
O
COMPLAINT
I PROGRESS
O
SEPTIC INSTALL
O
FOLLOW UP
' DEMOL
U
SEPTI:; MAIN
D
SEPTIC FINAL
_. F -IRE PREY
[;
WELL TEST PUMP
O
FIREPLACE/WOOD BURNER
COMMENTS:
11 Ilk C.11-- go. WSW AdEVan. i4OW
---Q���sE c a � �_I�l'�r►_�L- i4 SSS
W J WORK SATISFACTORY PROCEED I I PHOTO TAKEN
) J CORRECT WORK & PROCEED
CORRECT WORK CALL FOR REINSPECTION BEF-ORE COVERING
0 CORRECT UNSAFE CONDITION WITI4IN HOURS INSPECTOR WILL RETURN.
(7 STOP ORDER POSTED CALL INSPECTOR
ANSPECTION REOUIRED CALL TO ARRANGE ACCESS
call for the next inspection 24 hours in advance.
Owner/Contr. on site
Inspector AmA a&_
While Copy'Inspecluf s File
- --- — 47,d*Y 51
Gold CopviSltP Nonce