Loading...
HomeMy WebLinkAbout1973-04-19 Percolation TestMILLS ENGINEERING CO. Lonct '.uke, Minn. 55356 473-9883 April 19, 1973 PERCChAT ION TEST - Ir. Gary Mondale LOT 2, BUCK 3 Long Lake Country Club Addition Grono, 1�innesota Percolation tests were made for the above lot in accordance with the procedure described in "Smal Sewage works" prepared and distributed by the blinnesota Department of Health. Two test holes were used, and the test was run over a 24 hour period. The perco- lation rate was calculated on the basis of the results obtained in the last hour of testing. Test Hole Fall - last Percolation hour of test Rate 1 4 inches 15 min./inch 3 z 17 Average Rate 1.6 Based on this rate an absorption area of 0,82 sq. ft./ GPD. i:; required. Assuming use by 4 persons with an al erage daily water use of 60 gallons per day (UPD.), a drainfield at least ( 4 x 1)G x 0.e?. = 137 ) 20:� sq. ft. in size should be used. _ Country Club Road j '5' to I t holes rfy #2 ��- 201 r' 22' prof,., -,!d horse+ Po its - -�-- r