HomeMy WebLinkAbout1995-07-25 Septic System Design ReportS -P TESTING, INC. Steven F-. Schirmers — ';APCA Cert No. 627
951 Katydid Lane NE • St. Michael, MN 55376 • (612) 49'r 3&66
July 25, 1995
Mike Hilbelink
Lot 2, Block 1
Rosch Addition
Orono, Henn. Co., MN
This On -Site Sewage Treatment System is Designed for a Type 1, five
bedroom home Designed in accordance with the Minnesota Pollution
Control Agency Chapter 7080 and local ordinances.
The soils on this site are a clay loam. A Seasonally high water
table was located at. 14" to 22", (mottled scil). Due to the
seasonally high water table, a Pressurized Mound System will need
to be installed. The bottom of the rock bei must be located at
least 3' above the seasonally high water ta:)le.
The soils at a depth of 12" have a percolat.Lon rate avera,3ing
9.8 min/inch.
A pumping chamber will need to be installed to lift the effluent
the treatment area.
The manifold and supply line pipe must have back drainage to the
pumping chamber. The distribution pipes shall have their ends
capped. Be sure the rock and sand fill material are clean. The
sod layer below the entire mounded area must be turned over, just
break up the sod, be sure not to over work.
The power supply and switches must be located outside the manhole
and pumping chamber in a weather proof enclosure. A warning device
must be installed with a light and sound device, this is in case of
a pump failure.
All neighboring wells are located greater than 100' away from the
proposed treatment area.
CONT'D
Lot 2, Block 1
Rosch Add.
Orono
(2)
Keep all heavy equipment off of the proposed treatment area before
and after construction. The treatment area should be marked off
before construction. This Design is not valid & the system will
need to be relocated if failure to protect the areas proposed
for On -Site Sewage Treatment occurs.
with proper installation and maintenance, this system should
have no problem in treating septic effluent effectively.
Nothing other than gray water (laundry, showers, etc.) human waste
& toilet tissue should be disposed into the septic tanks. Garbage
disposals are not recommended. Excessive amounts of soaps, cleaning
agents & chlorine agents may kill the bacteria needed to treat
septic effluent. Additives are not recommended. Recommend to pump
& clean your tank through the manhole by a certified pumper eve:ry
year if you have 1 tank and every 2 years if you have two tanks.
i
C/-
Steven B. Schirmers
SBS/ds
91A
N
c z A IJ (A
o m 4
n 3
� n
• � _ (p LS
O
I
I• —
is
n !1 `� B •s o "u
i
oAN p d C n � cr.
n v r= _ .n n 3
c�
nN C � JI o N r o m'
Ci II hry
u s +, n •u I' 3 J 1
C
0.o
cr:
0
w o
�_ c
ci p
" W �M
a CL.. a p $
N
•o a �• 3 v�
o ra `'� ? D r• �
�r Ir I �• Y � o
S ro o x
I
Q II
A
n n x
^. 0 rd + r
U +
Fj
to
A
L. (� i
N
A g 7 IU
W
y
�
f1
m
i
A
n
0
G
zf
z xxx�
2 rr"„=r
rn mmrnm
zo
prrI.
r
i r f r r
Q
`
O
V
L �
U
y
ooi`�h�r
Vi•C
in
t a�
N
I
u
L^
_
O
i 4l
J
W
y
�
f1
7
i
n
G
Til
e 19
IO
- C, N
w I� I� IO ►�
J�33
—v£ v a
ry o 7v
Vi•C
in
ro ��
N
a..
L^
_
O
� �
I
gz
fo
�
y.
L
n
Er N
F�
o
J� •� rS
.o
0
U_ $
ca a
O o
•+
X
r -
D
U
n N xN
A " wig?
oKN
m Qb
M R
V -04
O yN
G A' w
N fb Zi
O v
P�•Q u
to par N
opo
a
A
,- 1�
4k
i t jw
2,111. t7
2
7) m
' 3 .rD1(;d
(A
m
� I
ci
9
�
Q
�X
Q
o
A Z
/
o
� I -
,- 1�
4k
i t jw
2,111. t7
2
7) m
' 3 .rD1(;d
(A
m
� I
r
0a
Jos
ci
9
�
Q
�X
Q
o
tin
/
r
0a
Jos
MOUND DESIGN WORKSHEET
(For Flows up to 1200 gpd)
A. FLUV
Filim.ud SeNp M& m c.ttM rQ Day (Spo
Nunbv
c
�� w.
�....
, r'
Estimated „ gpd
or measured x 1.3 = gpd.
t]&*
gyp`
7 tr
Trs� III
n'
B. SEPTIC TANK LIQUID VOLUMES
2
4
300
6 o
275
375
]so
256
.o.
;- 1 r r gallons
6
9011
525
332
.�_.
w
Loam
7
1410
600
370
•~
��
2.40
46 to 60
120D
673
�0{
61 t0120
C. SOILS (refer to site evaluation)
024
3A0
Slower than 120
CL
1. Depth to restricting layer = inches
rr+.
t
w
.�
w"'
2. Depth of percolation tests = inches
�
`100
2344
750
1.125
3. Percolation rate ''• mpi
4. Land slope �l0
1�
]�
7 w g
2.=
law
OWN
S"aLCi
(c 1.5)
D. ROCK LAYER DIMENSIONS
1. Multiply flow rate by 0.83 to obtain required area of rock
layer: A x 0.83 =
_3cgpd x 0.83 sq. ft./gpd = (,ate sq. ft. tio =L4r4"
2. Select width of rock layer (10 feet or less)
3. Length of rock layer = area width = Rock Bed
1 LJ sq. ft. + i h. q_ ft.
iff
dth 510 ft
F- ROCK VOLUME Lang
1. Multiply rock area by rock depth to get cubic feet of rock;
!�w sq. ft. x r, ft. _ -
21 K cu. ft.
2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards;
n i �c cu. ft. + 27 = a 1) cu. yd.
3. Multiply cubic yards by 1.4 to get weight of rock in tons;
cu. yd. x 1.4 ton/cu. yd. = `? v tons.
F. ADSORPTION WIDTH LLA 4( 1..01? w1
I. Percolation rate in top 12 inches of soil is w, mpi
2. Select allowable soil loading rate from table;
gpd/ft2
3. Calculate adsorption width ratio by dividing rock layer
loading rate of 1.20 gpd/ft2 by allowable soil loading rate;
1.20 gpd/ft2+ -; gpd/ft2 = , v
4. Multiply adsorption width ratio by rock layer width to get
required adsorption width;
x i ", ft= ft
.J
P.•d.�mR.r
tws■,r. .c•
Soil Texture
c
�� w.
�....
, r'
Faster than 0.1
Couse Sand
120
1
0.1 to 3
Sand
120
100
0.1 to 3
Fine Sand-
0.60
2.00
6 to 15
5WWy Loam
0.79
1.52
16 to 30
Loam
0.60
2.00
31 to 45
Silt Loam
030
2.40
46 to 60
Cla Loam
0.45
2.67
61 t0120
Clsy
024
3A0
Slower than 120
CL
--
-SW tic""s Rme" of fim O•!yr-E
.J
G. DOWNSLOPE DIKE WIDTH
11
I. If landslope is 3% or more, subtract rock layer width from
L)OWRIJOPI
11
adsorption width to obtain minimum downslope dike toe
71
ft- ft=_feet
41
2. Calculate Minimum mound size based on geometery:
41
a. Deteradne depth of clean sand fill at upslope edge of rock
W
layer: Separation - feet
b. Multiply rock layer width by landslope I lost cover
to determine drop in elevation; ' Itet 1e/
•'
SlapeDijfererrce Si.tlr.11e. +•� f.te
X- ''o y 100 = feet SI•.• Olff•r..e1
•'- t
_ U11216041 N+/ln
c. Add depth of clean sand for separation (2a) L reel
Rocr old w+etn
at upslope edge, depth of rock layer 0 foot) to depth of - teel Down110De
Width
cover (1 foot) to find the mound height at the upslope edge "?
+"t
of rock layer;
70
ft + lft + lft = feet
40
d. Enter table with landslope and upslope dike ratio.
LO
Select dike multiplier of 3 .:�'t
ID
e. Multiply dike multiplier by upslope mound height
]A4.17
to find upslope dike width: ? ." x v. n _ I Z feet
531
f. Add depth of clean sand for slope difference (2b) at
I'm
downslope edge, to the mound height at the upslope edge
Jim
of rock layer (20 to find the downslope height;
Sl.
1.0 ft + , y ft = q •1 feet
741
g. Enter table with landslope and downslope dike ratio.
7.3e
Select dike multiplier of
SSL
h. Multiply dike multiplier by downslope mound height
III
to get downslope dike width: 4.3 x = 'a 2, feet
170
i. Compare the values of step G.1 and Step G.2h Select the
5.11
greater of the two values as the downslope dike width; via,
4+901
_
13D
Z feet
111♦ {Yla.
Total mound width is the of
l' sum
SN
:f
�,.upslope dike (G.2e) width plus rock
lilt
layer width (D.2) plus �.,,:;:,;,„ �� `••'
;;;
downslope dike width(G.2i)
SN
i h + ft + ft feet
GAl
k. Total mound Iength is the sum of £ ti� °'"""'•"'+•'•>
x'.�y"�n 'i''
upslope dike width (G.2e) plus rock laver
A
length (D.3) plus upslope dike width (G.2e);
t
ft + ft + ft = feet
146
- - _-I Ili 74
4.11
Total 1e.1111
11
U
L)OWRIJOPI
11
663
71
1.1
41
5.1
41
7.1
W
0
]D
LO
$A
LO
70
1.0
40
SA
LO
70
ID
1
]A4.17
531
1631
I'm
21L
Jim
476
Sl.
LSI
741
I
7.3e
416
SSL
LQ
III
2AI
170
LSl
5.11
L1{
4+901
13D
4.11
SN
713
lilt
275
19
us
SN
S.7e
GAl
741
llt
L3
7A
0.11
21i
146
4.17
4.11
S ILLO/
S
733
Sm
LO
LV
Ion
241
&W
442
3 it
571
L
I/L
Si
7.11
f31
1107
2.b1
Jn
)AS
441
1113
$41
7
1N
SSi
71.
1031
1711
1Y
113
320
421
4.70
$13
1
).SS
Sjo
111
I1S1
Isit
14.2
lm
S7 7
4.01
{M
/Jr
/
1111
L21
9O1
1101
1 Lel
LU
1%
3 d
1a
L M
.4i
10
/a
Le
I"
1500
23.13
231
2i
711
L75
4.12
441
11
1497.11
11.11
17AS
1013
2U
2.71
3a
1111
1.0
ca
12
1M70
1134
21.0
417S
2.21
170
312
141111
7N
Am
A. Determine pump capacity.
Gravity Distribution
1. Minimum suggested is 600 gallons per hour (10 gpm) to stay ahead of
water use rate.
2. Maximum suggested for delivery to a drop box of a home system is 2,700
gallons per hour (45 gpm) to prevent build-up of pressure in drop box.
Pressure Distibution
3. a. Select number of perforated laterals
b. Select perforation spacing = -Z feet.
C. Subtract 2 ft. from the rock layer length.
�- 2 ft.= - feet
d. Determine the number of spaces between perforations.
Length perf. spacing = r'. ft. + _� ft. _ Z spaces
e. ''J? spaces + I = o -7 perforations/lateral
f. Multiply perforations per lateral by number of laterals to 1)
g. Ztotal number of perforations.... x , perforations.
x �� gpm.. =pm.
SELECTED PUMP CAPACITY 71�p- gpm
B. Determine head requirements:
1. Elevation difference between pump and point of discharge.
�'� feet
2. If pumping to a pressure distribution system, five feet for pressure
required at manifold if gravity system, zero.
feet
3. Friction loss
a. Enter friction loss table with gpm and pipe diameter.
Read friction loss in feet per 100 feet from table.
RL - -, -'- ft/100 ft of pipe
b. Determine total pipe length from pump to discharge
point. Add 25 percent to pipe length for fitting
loss, or use a fitting loss chart. Equivalent pipe
length -1.25 times pipe length =
: r x 1.25 = -t feet
c. Cakulate total friction loss by multiplying
friction loss in ft/ 100 h by equivalent pipe length.
Total friction loss a • 'u x ? - L- +100 - q feet
4. Total head required is the sum of elevation difference,
special head requirements, and total friction loss.
+ C +C7
(1) (2) (30
TOTAL HEAD `/ feet
G Pump selection
1. A pump must be selected to deliver at least
.ec7_ gpm (Step A) with at least ? v feet of total head (Step B).
F-17
0o POWD TWN Or • rveroPI.Trp LATrra,L
r-
.. � Lffift 1`00 L/M • ' Y� IAS �1 � � w wY
two tr.. w
M rL.W
/Vorwr LMEM1r o1
Yrphone I -d 1. M�1
ttaquUW Perfaaaon Diqehaeta
ui plknu pw aws to (apmJ'
Had
0.20
no rr
((feet
0.%
0.21
1.0a
0.56
0.74
2.Ob 1
0.80
1.04
a. Use for single family homes
b. Use for all other applications
Pipe L=gth
AZY
1]evadm Dit[ererdw
P /ao 0
F -11b
1.5inch 2.0 inch 3.0 inch
fpm tiHwr.r.Iaont„.
10
0.69
0.20
12
0.%
0.21
14
1.21
0.38
16
1.63
0.48
11
2.03
0.60
20
2.47
0.73
0.11
25
3.73
1.11
0.16
30
5.23
1-55
0.23
35
7.90
2.06
0.30
40
11.07
2.64
0.39
45
14.73
3.21
0.41
50
3.99
0.52
55
4.76
0.70
60
5.60
0.82
L-13
CERTIFICATION 4 00627 1,ogs of Soil Borings
Location or Project Lot 2, Block 1, Rosch Add., Orono
Borings made by S -p Testing, Inc. Steve Schirmers Date 7-21-95
Classifiction System: AASHO USDA -SCS X Unified Other
Auger used (check Lwo): hand X or Power Flight or Bucket_ X
Depth,
Boring number 21
Depth,
Boring number 22
in
feet
Surface elevation 1026.8
in
feet
Surface elevation 1020.5
J-
0 -
---
Topsoil dark brown
0 - 6" _
Brown clay loam
0 - 10" loam
1 clay
"
1 -
6" - 1'2" -MOTTLED 1'2'
YMM 10" - 1'4" -MOTTLED 1'
Rusty olive brown
2 _
clay loam
114" - 214"
2 -
Rusty olive brown
clay loam
Rusty olive gray silty clay
3 -
214" - 3' loam
3 -
1'2" - 314"
Rusty olive gray silty loam
3' - 3'8"
Rusty olive gray
loam
4 -
4 -
Rusty olive brown
loam
5 -
318" 5'
5 -
3'4" - 51
6 -
6 -
7 -
7 -
8 -
8 -
End of boring at 51 feet.
Standing water table:
present at feet of death,
hours after boring.
Not present in hole X
Mottled soil:
Observed at 1'4" feet of depth.
Not present in hole
Comments:
End of boring at 5' feet.
Standing water table:
present at feet of depth,
hours after boring.
Not present in hole X
Mottled soil:
Observed at 1'2" feet of depth.
Not present in yule
Comments:
CERTI FICATIOt: 012b27 [.ogS of _ Soil 13orinc
Location or Project Lot 2, Block 1, Rosch Add., Orono
Borings made by S -P ?esting, Inc. Steve Schirmers [gate
Classifiction System: AASHO ; USDA -SCS X ; Unified
L-13
7-21-95
; Other
Auger used (check two): Hand X , or Power , Flight , or Bucket X
Depth,
Boring number 19 _
Depth,
Boring number 20
in
feet
Surface elevation Io25.8
in
feet
Surface elevation 1027.9
J -
0
Topsoil dark brown loam -
Topsoil dark brown
loam
0 - 8"
Prown clay loam
"- ■
8 - 1'4" -MOTTLED 14
1 _
0 - 1'
1 _
Brown 1, - 1,4„ clay loam
gjgdy 1'4" - 1'10" -MOTTLED 1
f$vn
10"
2 _
2 -
Rusty olive brown
clay loam
Rusty gray brown
sandy clay loam
-
1'4" - 3'
1'10" - 314"
Rusty olive brown
loam
Rusty olive gray clay loam
4 -
314" - 412"
4 -
Rusty olive gray
3' - 4-1/2'
Rusty olive gray silty
loam
5 -
412" - 5'
5 -
4-1/2' - 5' loam
6 -
6 -
7 -
7 -
8 -
8 -
End of boring at 5' feet.
Standing water table:
present at feet of depth,
hours after boring.
Not present in hole X
Mottled soil:
Observed at 1'10"
feet of depth.
Not present in hole
Comments:
End of boring at 5' feet.
Standing water table:
present at feet of depth,
hours after boring.
Not present in hole X
Mottled soil:
Observed at 11411
feet of depth.
Not present in hole
Comments:
L -LJ
CERTIFICATIOIJ a U06z7 Log., of Soil f3orinc3s
Location or Project Lot 2, Block 1- Roerr, Add., Orono
Borings made by ___�-P 7estinq Inc. Steve Schirmers Date 7-21-95
Classifiction System: AASHO USDA -SCS X Unified Other
Auaer used (check two): Hand X or Power Flight or Bucket X
Depth,
Boring number 23
Depth,
Boring number 24
in
feet
Surface elevation 1022.1
in
feet
Surface elevation 1019.9
J -
—
0 -
--
Topsoil dark brown
Topsoil dark brown
loam
loam
1
0 - 112"
1
0 - 114" -MOTTLED 184"
Brown clay luam
Rusty gray brown clay loam
1'2" - 1'10" -MOTTLED 1'1
2 -
1'4" - 21
2 -
Rusty olive brown
Rusty olive gray
clay loam
clay loam
3 -
1110" - 3'2"
3 ..
2' - 3'8"
Rusty olive b_rcwn
loan
4 -4
-
Rusty gray silty
312" - 414"
loam
Rusty olive gray sandy loam
414" - 5'
5 -
3'8" - 5'
5 -
6 -
6 -
7 -
7 -
8 _
8 -
End of boring at 5' feet.
Standing water table:
present at feet of depth,
hours after boring.
Not present in hole `
Mottled soil:
Observed at 1'10" feet of depth.
Not•present in hole
Comments:
End of boring at 5' feet.
Standing water table:
present at feet of depth,
hours after boring.
Not present in hole X
Mottled soil:
Observed at 1,4" feet of depth.
toot present in hole
Comments:
CERT.400627
PERCOLATION TEST DATA SHEET
Percolation tcstreadinesmade bv S—P Testing, Inc. 3•m•
on 7-7 --95 starting at 1 2 - 57
'J."'I
MD
Tcst hole location Lo -t 2 ,131 k . 1, Rosch Add,, Hole number 19 Date hole was prepared 7— 21-9 5
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Soil texture
0 — 12" Topsoil dark brown loam
Method of srratching sidewall Knife
Depth of gravel in bottom of hole_ � inches
7-21-95 3:OOpm 12
Date and hour of initial water filling , Depth of initial water filling inches above hole bottom
Method usea to ma -main at least 12 in "es of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during test inches
: ime
Time
interval,
minutes
Measurement,
inches
Drop in water
level, inches
Percolation
rate, Remarks
minutes per
inch
-
9.8 30 min
11
II
N II N
2 : 0
1
Percolation rite = 9 _11 --minutes per inch.
CERT.;00627
PERCOLATION TEST DATA SHEET
Percolation test readines ntadeby S—P Testing, Inc. on 7-22-95—staninoal 12
3.
Test hole location Lot2,B1k.1,Rosch Add. 20 7-21-95
.Hole number ,Date hole was prepared
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Soil texture
0 — 8" Topsoil dark brown loam
8" — 12" Brown clay loam
Method of scratching sidewall Kni fe
Depth of gravel in bottom of hole 2 inches
Date and hour of initial water filling — 21— 15
' ; gg 12
ti of initial water filling- inches above hole bottom
Method uses to maintain at least 12 inches of water depth in hole for at !east 4 hours Automatic siphon
, Maximum water depth above hole bottom during tesr 6 inches
ime
Time
interval,
minutes
,'Measurement,
inches
Drop in water
level, inches
Percolation
rate. Remarks
minutes per
inch
12:40
Prefill
6
12:53
1:23
3-3/8
8.9 30 min
1:28
1:58
3-1/4
9.2
2:01
2:31
3-1/4
9.2
Percolation rate = 9 • 1 minutes per inch.
CERT. 7#00627
PERCOLATION TEST DATA SHEET
S—P Testing, Inc. 7-22-95 12:54 3.m.
Percolation test readings made by g on starting at
d+Nl
Test hole location Lot 2 , B1 k . 1, Rosch Add. Hole number 21 , Date hole %vas prepare] 7-21-95
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 10" Topsoil dark brown loam
10" — 12" Brown clay loam
hiethod of scratching sidewall Knife
Depth of gravel in bottom of hole inches
7-21-95 3:OOpm 12
Date and hourof initial water filling 11 Depth of initial water filling inches above hole bottom
Method urea to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
:Maximum water depth above hole bottom during test inches
ime
Time
interval,
minutes
Measurement.
inches
Drop in water
level, inches
Percolation
rate,
minutes per
inch
Remarks
Water rem
ining in test
hole
12:54
1:24
6
1-1/2
20.0
30 min
1:27
1:57
11
2:02
2:32
Percolation rate = 20-0 minutes per inch.
CERT.n00627
PERCOLATION TEST DATA SHEET
S—P Testing, Inc. 7-22-95 0 12:55 3. m.
Percolation test readines made by on stanin_ a
Test hole location Lot 2 , B 1 k . 1, Rosch Add. Hole number 22 Date hole was prepared 7-21-95
Depth of hole bottom 12 _inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 6" Topsoil dark brown loam
6" — 12" Brown clay loam
Method of scratching sidewall Kn i f e
2
Depth of gravel in bottom of hole inches o
Date and hour of initial water filling 7-21-9 5 , Deptfi bfinitial water filling 12 inches above hole bottom
Method uses to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during test inches
imeinterval,
Time
minutes
Measurement,
inches
Drop in water
level, inches
Percolation
rate.
minutes per
inch
Remarks
Water rem
ining in test
hole
12:55
1:25
6
2-1/8
14.1
30 min
1:26
1:56
2:03
2:33
Percolation rate = 14.1 minutes per inch.
CERT.;00627
PERCOLATION TEST DATA SHEET
2.m.
Percolation tcst readines made b%, S—P Testing, Inc. on 7-22-95 startinga 2:56 rn
Test hole location Lott,Blk.l,Rosch Add. .Hole number 23 Date hole��asprepared 7-21-95
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Soil texture
0 — 12" Topsoil dark brown loam
Methodof scratching sidewall Knife
2
Depth of gravel in bottom of hole inches
Date and hour of initial water filling 7-21-95. l3iA dYtnitial water filling_ 12 inches above hole bottom
Method usea to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during test inches
ime
Time
interval,
minutes
Measurement,
inches
Drop in water
level, inches
Percolation
rate,
minutes per
inch
Remarks
12:40
prefill
6
12:56
1:11
of
5
3.0
15 min
1:31
1:46
to
4-7/8
3.1
"
1:51
2:06
4-3/4
3.2
"
Percolation rate = 3 • 1 minutes per inch.
CERT -#00627
PERCOLATION TEST DATA SHEET
a.m.
Percolation tcstreadinesmade by S—P Testing, Inc. on 7-2 —9S staning7.57
Test hole location Lott , Blk .1, Rosch Add. Hole number 24 Date hole was prepared 7-21-95
Depth of hole bottom 12 -inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
7-21-95 3:00pm 12
Date and hour of initial water filling 1, Depth of initial water filling inches above hole bottom
Method usea to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during tesr inches
ime
Time
interval,
minutes
Measurement,
inches
Drop in water
level, inches
Percolation
rate,
minutes per
inch
Remarks
2:57
1:12
If5-1/2
2.7
15 min
1.30
1:45
1.50
2.05
Percolation rate = 2.7 minutes per inch.
r•r
SANDY LOAM SOIL----)
LAYER OF GEOTEXTILE "
FABRIC OR **K* Es–OF ;
PIPE FROM PUMP - —� `: • •j ' �� ���/ '
CAN2'W
LEOCK
'i
6' TOPSOILor
• �•, � �
ITS _" 3
6ROkEER
N Y
eA R11 I
LAYER
LAYOUT OF PERFORATED PIPE LATERALS FOR
PRESSURE DISTRIBUTION IN MOUND
PERFORATED PLASTIC PIPE
PERFORATIONS SPACED 36-
END ON CENTER. VOW- 1N
VIEW on /4"Av BE Ia:��l;_ 1
PERFORATIONS ON BOTTOM OF
PLASTIC PIPE
ACWd
A/ION
�z'MP7� D
I
IN."PEA iROMaAPU M"1
END CAP \�0.00A
IED EAIERA v .
rc
POPE FROM
' `6o6rN
LOAMY SAND CAP
Lm'ER OF GEOTEXTILE
FABRIC PERFORATED LATERAL
GRASS COVER 6 INCHES
TOPSOIL
:LEAN SAND FILL
MAXIMUM SLOPE
TO I
-WAN E 2N RONCHEi a'
TOPSOIL PLOWEO OR T� p
DISKED SURFACE
uBSO1L
CROSS SECTION A - A
�- PIPE FROM
r PUMP=NG CHAMBER
- PERFORATED
LATERALS
-
BED AREA
to
i o
INCHE�'. INCHES-
DIKE—�OMAEX T---I---DIKE—:
TOTAL WIDTH -�
END PERFORATION OF A PERFORATED LATERAL
wr► Ca.w
• Lew go" Lftw • I�Itiof ioNnN4 FmMk hrlw•
P«Ir Ir. Cledr Nrw«wwr
w» Mw �N
„_ q• Y LNN W N ldp
N RMA LNM
Fellw Ove. LAIN N
Clow fMA Lmyw Mlles M LoIMM
pIpIIN feu nyrl{ lsa/1.N
PERFORATED
LATERALS
DIVERSION FOR
J
SURFACE wA7ER
6ROkEER
N Y
eA R11 I
LAYER
LAYOUT OF PERFORATED PIPE LATERALS FOR
PRESSURE DISTRIBUTION IN MOUND
PERFORATED PLASTIC PIPE
PERFORATIONS SPACED 36-
END ON CENTER. VOW- 1N
VIEW on /4"Av BE Ia:��l;_ 1
PERFORATIONS ON BOTTOM OF
PLASTIC PIPE
ACWd
A/ION
�z'MP7� D
I
IN."PEA iROMaAPU M"1
END CAP \�0.00A
IED EAIERA v .
rc
POPE FROM
' `6o6rN
LOAMY SAND CAP
Lm'ER OF GEOTEXTILE
FABRIC PERFORATED LATERAL
GRASS COVER 6 INCHES
TOPSOIL
:LEAN SAND FILL
MAXIMUM SLOPE
TO I
-WAN E 2N RONCHEi a'
TOPSOIL PLOWEO OR T� p
DISKED SURFACE
uBSO1L
CROSS SECTION A - A
�- PIPE FROM
r PUMP=NG CHAMBER
- PERFORATED
LATERALS
-
BED AREA
to
i o
INCHE�'. INCHES-
DIKE—�OMAEX T---I---DIKE—:
TOTAL WIDTH -�
END PERFORATION OF A PERFORATED LATERAL
wr► Ca.w
• Lew go" Lftw • I�Itiof ioNnN4 FmMk hrlw•
P«Ir Ir. Cledr Nrw«wwr
w» Mw �N
„_ q• Y LNN W N ldp
N RMA LNM
Fellw Ove. LAIN N
Clow fMA Lmyw Mlles M LoIMM
pIpIIN feu nyrl{ lsa/1.N
REDWOOD. CEOR
WATER 7IGIIT 9 LOCKABLE ELECTRIC BOX—� TREATED
� POSTDAR 4 „4 min)
PLUGS OR ELECTRIC CONNECTIONS - l-1 51DEL EBOXRIC CONNECTIONS MADE
2' PVC CONDUIT SCHEDULE 90 6•SPACE OFPOWER CORD FOR
MANHOLE COVER CHAINED 8 LOCKEDT SETTLEMENT
SEALED MANHOLE RINGS -� �, [LOOP
FINAI r.RAnr ,
SEALED TANK COVER -
PLASTIC ROPE OR CHAIN
WITH ANCHOR--�
ALARM FLOAT ON SEPARATE
ELECTRICAL CIRCUIT —�
START- S.E_VEL9 _ �r
3'� a
SHUT: OFF-.LEYEI.-Q
PUMP CONTROL FLOAT
r" AT LEAST 12'
BELOW GRADE
_ WIRE FROM POWER SUPPLY
'.91
pM PI STATID ON A ION UP TO UNIFORM
SOIL TREATMENT EA
F PROPER ORAINBACK
IF PIPE AT TANK MUST BE LOWER TITAN
UNION. TO GET ELEVATION FOR DRAINBACK.
A I/4 INCH WEEP HOLE MUST DE USED
— WEEP HOLE
NOTES: ELECTRICAL WIRE FROM POWER SUPPLY
MUST NOT RUN OVER ANY TANKS BU1
MUST BE LAID BESIDE OTIIER TANKS
AND MUST BE PLACED IN CONDUIT
ALONG POST
ELECTRICAL �^nOS FROM PUMP AND
FLOATS M RUN THROUGH
CONDUIT CANNOT HAVE GROUND
CONiAC
1igurc F -R
METAL
COVER
.Ya v
-- I
CONCRETE
MANHOLE
RING
METHODS OF SECURING MANHOLE COVER TO PREVENT
UNAUTHORIZED ENTRY
Figurr C-14
' •1
. F.x
REDWOOD. CEOR
WATER 7IGIIT 9 LOCKABLE ELECTRIC BOX—� TREATED
� POSTDAR 4 „4 min)
PLUGS OR ELECTRIC CONNECTIONS - l-1 51DEL EBOXRIC CONNECTIONS MADE
2' PVC CONDUIT SCHEDULE 90 6•SPACE OFPOWER CORD FOR
MANHOLE COVER CHAINED 8 LOCKEDT SETTLEMENT
SEALED MANHOLE RINGS -� �, [LOOP
FINAI r.RAnr ,
SEALED TANK COVER -
PLASTIC ROPE OR CHAIN
WITH ANCHOR--�
ALARM FLOAT ON SEPARATE
ELECTRICAL CIRCUIT —�
START- S.E_VEL9 _ �r
3'� a
SHUT: OFF-.LEYEI.-Q
PUMP CONTROL FLOAT
r" AT LEAST 12'
BELOW GRADE
_ WIRE FROM POWER SUPPLY
'.91
pM PI STATID ON A ION UP TO UNIFORM
SOIL TREATMENT EA
F PROPER ORAINBACK
IF PIPE AT TANK MUST BE LOWER TITAN
UNION. TO GET ELEVATION FOR DRAINBACK.
A I/4 INCH WEEP HOLE MUST DE USED
— WEEP HOLE
NOTES: ELECTRICAL WIRE FROM POWER SUPPLY
MUST NOT RUN OVER ANY TANKS BU1
MUST BE LAID BESIDE OTIIER TANKS
AND MUST BE PLACED IN CONDUIT
ALONG POST
ELECTRICAL �^nOS FROM PUMP AND
FLOATS M RUN THROUGH
CONDUIT CANNOT HAVE GROUND
CONiAC
1igurc F -R
METAL
COVER
.Ya v
-- I
CONCRETE
MANHOLE
RING
METHODS OF SECURING MANHOLE COVER TO PREVENT
UNAUTHORIZED ENTRY
Figurr C-14
VERTICAL SIDEWALL SEPTIC TANK
/-FINISHED GRADE
_09-77—AT AST 6'. T12SO
LEO ' IL AT LEAST
4' DIA. COVER 4" DIA.
1"
MIN AT LEAST I" AT LEAST I"
{_ A DIMENSIONS FOR TANKS WITH VF_nTICAL SIDES A
WROTH, W 24• MINIMUM -_-
T LENGTH, L 2 TO 3 TIMES THE WIDTH
B OIAM_ETER GO• MINIMUM _
DEPTHi_ T9_MAXIMUM _ C
AT LEAST —n 02 ..
B 6" MINIMUM,—0.2 D MAXIMUM I = 6• _
3" c 104 D CI
— - -AT LEAST 4 FEET
No1FS: ;
1 SNMINIV I ELS At if Atl FYll.11Eswv,Auflfn t llwo"t COVERS y MAI fE tOFJllto11Af11w 17 wuia
f, 1,EfF..S$wLUE4YEonIR71Fuo/AIOIES awtFAtt f1:E MAMILRE Mw1110NMMNOOSOF 11[ luIYACE
11ANI llimms)JOCA1 FIl wINMlilt(IE/ All 1Mw lIE Q7VLIII.UEI fE M[W EO ronElRllt AO:.till
W All N 6 : r 1•AfMI W MIAWA K iMEEN FNl a 0tE f PPF AND
7. AM OIy'LCIIDNI'/Y OF A/ LEAST. wII(IfI+AAE I[II NEAfEFT IVNI WoArric MWl memos [f111w0 wEf
1U
ORAVANIME SIW.1 I* lOCAIEF(Njn9DII1 Nt ON Ef On NpAoltkll 1111t"o*l
NnOuIU:luLV[IS 1NECUIIt)IIwCCf 11 f. FI:a�IClFjt/ i fOnll01F2NNIALCY1,14MG11IWMSONKtirAMA1S0150
MIs MOAT IsEII(AAW Al IIK"NllnlwEry INE AAM 0114 N1110N C IS 0 ISO.
IIAl f LE aSNMOS dl tA/01 N if LEES A 11 WY)WS6I C I[FF
17[ [Obi K lOCA1 W Y! IYR(N IIIF tAl1 ANl t11N1 f l
oM f l" _
MET SCUM ice'+`
tv;�',pUTLET LEVEL.
_SCUM CLEAR SPACE
J
SLUDGE
Aal
OUTLET
CLEAN OUT TAME WHEN:
7 K IS 3A OR LESS OR
1'>f B 'B' IS 12' OR LESS
^1
l'
BLACK COLOR
DISTINGUISHES SLUDGE
LAYIW FROM LIQUID
M
MEASURE SCUM AND SLUDGE ACCUMULATIONS
IN THE SEPTIC TANK
\9kESH04� i
LOCATION: 2685 Copperview Dr.
OWNER: Mike Hilbelink
CITY OF ORONO
SEPTIC SYSTEM APPROVAL
CIT'% of ORONO
..04P11 OWN
1 '0' Jffke Box 66
Crystal Bap, M mesma SS323-0066
GENERAL CONTRACTOR: Mike H i t be l i n kSEPTIC CONTRACTOR:
SITE EVALUATOR: S -P Testing
REPORT DATE: July 25, 1995
The City of Orono has Approved your on-site system design as of
(approved -disapproved)
with the following comments:
August 16, 1996
(date)
THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must
be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is
enclosed.
NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the
Inspector (473-7357). Call for inspections 24 hours in advance.
ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain
in place until final site grading. Approval to pour footings will not be granted until the Inspections Department
has verified that primary and alternate sites are adequately protected.
NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20'
of tested drainfield sites either before or after system construction. Compaction of these areas could render them
unusable prohibiting the timely completion and or limiting the long term use of the property.
A site copy will be available at the City Offices for the septic contractor.
CITY OF O O
By .1 ,�-�—
Stephen a kman, On-site Systems Manager
TELE14 [ONE - 473-7357 a FAX - 473-0010
(7)
I.
(SILVER OUT
VIEW
(1,0)
.... ......... 3r. ........._....• 45z. s2 5ee*9'4WE Z 346. 16 N69'10'OT1
:84.4 LLJ
in
OL A _J
16)
[DIDW
(iv g 6)
362.2 44. 14)
15 4
in
-7,-6 �1y) Q
441. : a?
OUTLOT A Z 1) , 211.87 (5)
leo A4 Y
:9
3 (2)
2
OL A
SECOND ADOW
�C'!
L2
LLJ ib
W (4)
4 n I al
_j
m m
Jti 271. is 73
474.9 t"3211 ... .... ...... .
............... wftml.� Fur-
A ......... $Is EAST ......... ... 250
295 W09,2rc 220 366.52 175
33 m ew
(9)
......... 2655-98 RES
A..4
15 e5 5 0-4-
4W
: t :3 3 - // T. ` 3