Loading...
HomeMy WebLinkAboutRPS23-000166 Final Permit Report + COFrom:gnelson@oronomn.gov Sent:02/13/2025 - 08:04 AM To:gnelson@oronomn.gov,kfitzsimmons@oronomn.gov,npost@oronomn.gov,jmejia@oronomn.gov CC: Subject:Inspection Report Individual CITY OF ORONO 2750 KELLEY PARKWAY ORONO, MN 55356 PH: (952) 249-4600 FAX: (952) 249-4616 Inspection Report 3548 Ivy PL Permit Number:RPS23-000166 Site Address:3548 Ivy PL, Orono, MN 55391 Property Owner:Deborah Dibias Trust Description:Construct New Home Inspection Date: 12/04/2024 Inspection Type: Building Final Inspection Results: Permit Finaled Sincerely, Gary Nelson 952-242-4442 To schedule your inspections please call: (952) 249-4600 CODE REQUIREMENTS ARE FOR YOUR PERSONAL HEALTH AND SAFETY! FILE SUMMARY REPORT March 13, 2025 FILE INFORMATION File #:23-001495 Address:3548 Ivy PL Status: Open Parcel #:2011723420017 Open Date:10/18/2023 Description:Construct New Home Close Date:Owner Name:Deborah Dibias Trust Type:Permitting Owner Address:16821 ENCLAVE CIR EDEN PRAIRIE MN 55347 CONTACTS CONTACT ASSOCIATION CONTACTTYPE ADDRESS PHONE Align Building and Remodeling Tim OConnor Citizen Entry Contractor Company Address: 684 Excelsior Blvd Suite 220 Excelsior MN 55331 Mobile: (612) 325-8859 Dean & Debi Dibas Citizen Entry PERMITS PERMIT #TYPE DATES APPLICANT DESCRIPTION RPS23- 000166 Residential Principal Structure Building Permit New Construction Status: Issued Application Date: 10/18 /2023 Issue Date: 11/29/2023 Expiration Date: 06/04 /2025 Close Date: 02/19/2025 Align Building and Remodeling Construct New Home INSPECTIONS PERMIT #TYPE INSPECTION DATE INSPECTOR STATUS RPS23-000166 Footing 12/05/2023 Gary Nelson Inspection Passed: Proceed RPS23-000166 Poured Wall 12/08/2023 Gary Nelson Inspection Passed: Proceed RPS23-000166 Waterproofing/Drain Tile 12/28/2023 Gary Nelson Inspection Passed: Proceed RPS23-000166 Under-slab 02/22/2024 Gary Nelson Inspection Passed: Proceed RPS23-000166 Framing 03/21/2024 Nicole Post Inspection Failed: Reinspect RPS23-000166 Insulation 03/29/2024 Gary Nelson Partial Pass RPS23-000166 Insulation 05/09/2024 Gary Nelson Inspection Passed: Proceed RPS23-000166 Shower Pan 05/16/2024 Gary Nelson Inspection Passed: Proceed RPS23-000166 Building Final 08/26/2024 Gary Nelson Partial Pass RPS23-000166 Public Works As-Built Inspection 12/02/2024 Kellie Intlekofer Inspection Failed: Reinspect RPS23-000166 Building Final 12/04/2024 Gary Nelson Permit Finaled RPS23-000166 Public Works As-Built Inspection 01/08/2025 Kellie Intlekofer Inspection Passed: Proceed REVIEWS PERMIT #TYPE REVIEW DATE REVIEWER STATUS RPS23-000166 Completeness Check 10/24/2023 Katie Fitzsimmons Review Approved RPS23-000166 Grading Review 10/24/2023 Adam Edwards Approved with Conditions RPS23-000166 SAC Determination 10/24/2023 Anne Hentges Review Approved RPS23-000166 Zoning Review 10/30/2023 Melanie Curtis Review Approved RPS23-000166 Building Code Review 11/07/2023 Nicole Post Review Denied RPS23-000166 Building Code Review 11/16/2023 Nicole Post Review Denied RPS23-000166 Building Code Review 11/28/2023 Nicole Post Review Approved RPS23-000166 Final Review 11/29/2023 Melanie Curtis Review Approved RPS23-000166 Foundation As-built Survey Review 12/21/2023 Melanie Curtis Review Approved RPS23-000166 Grading As-built Survey Review 10/16/2024 Adam Edwards Review Denied RPS23-000166 Zoning As-built Review 10/21/2024 Melanie Curtis Review Denied RPS23-000166 Grading As-built Survey Review 10/30/2024 Adam Edwards Approved with Conditions RPS23-000166 Zoning As-built Review 12/02/2024 Melanie Curtis Review Approved RPS23-000166 Public Works Inspection 01/08/2025 Kellie Intlekofer Review Approved RPS23-000166 As-Built Site Visit 02/13/2025 Gary Nelson Review Approved RPS23-000166 Building As-Built Review 02/18/2025 Nicole Post Review Approved ACTIVITIES PERMIT #TYPE ACTIVITY DATE ASSIGNED TO STATUS RPS23-000166 Escrow Refund Issued Anne Hentges Under Review RPS23-000166 Online Permit Application 10/18/2023 Katie Fitzsimmons Complete RPS23-000166 Online Payment Received 10/18/2023 Joe Ruthenberg Complete RPS23-000166 Online Document Upload 10/24/2023 Katie Fitzsimmons Complete RPS23-000166 Online Document Upload 11/09/2023 Melanie Curtis Complete RPS23-000166 Online Document Upload 11/17/2023 Melanie Curtis Complete RPS23-000166 Online Document Upload 11/27/2023 Melanie Curtis Complete RPS23-000166 Required Inspections 11/28/2023 Nicole Post Review Approved RPS23-000166 Online Payment Received 11/29/2023 Joe Ruthenberg Complete RPS23-000166 Review Complete 11/29/2023 Joe Ruthenberg Review Approved RPS23-000166 Online Document Upload 12/21/2023 Melanie Curtis Complete RPS23-000166 Online Document Upload 03/26/2024 Melanie Curtis Complete RPS23-000166 Online Document Upload 10/15/2024 Melanie Curtis Complete RPS23-000166 Online Document Upload 10/29/2024 Melanie Curtis Complete Activity Completed 02/19/2025 System User Activity Completed 02/19/2025 System User RPS23-000166 Issue CO 02/19/2025 Tano Mejia Complete RPS23-000166 Escrow Refund Requested 03/11/2025 Anne Hentges Complete DOCUMENTS SOURCE DOCUMENT NAME DATE CREATED BY Construction documents (Footing/ foundation, floor, elevation, wall PERMIT SET.pdf 10/18 System bracing, etc.)/2023 User New Construction Minnesota State Energy Code Calculations CLICK HERE 3548 Ivy Place Energy Certificate (1). xlsx 10/18 /2023 System User New Construction Ventilation, Make up and Combustion Air Calculations Submittal Form CLICK HERE 3546 Ivy Place Ventilation Report (2). pdf 10/18 /2023 System User Certified Site Plan: CLICK HEREbsp Survey.pdf 10/18 /2023 System User Minnehaha Creek Watershed District (MCWD) Permit; OR Documentation from MCWD stating no permit is required 23-356 Permit (2).pdf 10/18 /2023 System User Erosion Control Plan 3548 Ivy Place Erosion Plan.pdf 10/18 /2023 System User Hardcover Calculations Survey.pdf 10/18 /2023 System User Hardscape Plan Survey.pdf 10/18 /2023 System User Applicant Signature signature.png 10/18 /2023 System User System Email Your permit application has been received.htm 10/18 /2023 System User System Email Online Payment Received.htm 10/18 /2023 System User System Email Your citizenserve payment has been received.htm 10/18 /2023 System User Email Single Reviewer Plan Review.htm 10/23 /2023 Katie Fitzsimmons Online Document Upload 3548 Ivy Place Hardcover.pdf 10/23 /2023 System User Resolution Resolution 7408.pdf 10/30 /2023 Melanie Curtis Plan Review Checklist plan review checklist.pdf 10/30 /2023 Melanie Curtis Email Single Reviewer Plan Review.htm 11/07 /2023 Nicole Egan Online Document Upload Structural Plans.pdf 11/07 /2023 System User Email Single Reviewer Plan Review.htm 11/16 /2023 Nicole Egan Online Document Upload Letter from Engineer.pdf 11/17 /2023 System User Online Document Upload Revised Structural.pdf 11/21 /2023 System User Approved for Permit 3548 Ivy Pl - Structural plans combined.pdf 11/28 /2023 Nicole Egan Approved for Permit Survey with markups.pdf 11/29 /2023 Melanie Curtis System Email Your citizenserve application status has changed.htm 11/29 /2023 System User System Email Online Payment Received.htm 11/29 /2023 System User System Email Your citizenserve payment has been 11/29 System received.htm /2023 User System Email Your citizenserve application status has changed.htm 11/29 /2023 System User Merge document Permit Approved.htm 11/29 /2023 Joe Ruthenberg Merge document Inspection Card.htm 11/29 /2023 Joe Ruthenberg Email Inspection Report Individual.htm 12/05 /2023 Gary Nelson Email Inspection Report Individual.htm 12/08 /2023 Gary Nelson Foundation As-built Survey Foundation As Built.pdf 12/21 /2023 System User Email Foundation As-Built Survey Email. htm 12/21 /2023 Melanie Curtis Email Inspection Report Individual.htm 02/22 /2024 Gary Nelson Email Inspection Report Individual.htm 03/22 /2024 Nicole Post Additional Information Master Truss Spec.png 03/25 /2024 System User Email Inspection Report Individual.htm 03/29 /2024 Gary Nelson Email Inspection Report Individual.htm 05/09 /2024 Gary Nelson Email Inspection Report Individual.htm 05/16 /2024 Gary Nelson Email Inspection Report Individual.htm 08/27 /2024 Gary Nelson As-built Survey Final Grade rev241010.pdf 10/14 /2024 System User Email Department Plan Review.htm 10/21 /2024 Melanie Curtis As-built Survey Final Grade rev241029.pdf 10/29 /2024 System User Hardcover Calculations Hardcover Caculation Worksheet Final Grade.pdf 10/29 /2024 System User Document Markup Final Grade rev241029 with markups.pdf 11/21 /2024 Melanie Curtis Email Final As-Built Denial.htm 11/21 /2024 Melanie Curtis As-built Survey - APPROVED Final Grade rev241029 with markups.pdf 12/02 /2024 Melanie Curtis Document 3548 Ivy Place-PW inspection.pdf 12/02 /2024 Kellie Hoen Document 3548 Ivy Place-Curbstop.jpg 12/02 /2024 Kellie Hoen Email Inspection Report Individual.htm 12/02 /2024 Kellie Hoen Email Inspection Report Individual.htm 12/04 Gary Nelson /2024 Email Inspection Report Individual.htm 02/13 /2025 Gary Nelson Merge document Residential Certificate of Occupancy - New Property Owner.htm 02/19 /2025 Tano Mejia Email City of Orono Email - Permit.htm 03/10 /2025 Tano Mejia Email Escrow Refund Requested.htm 03/11 /2025 Anne Hentges City of Orono CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of 1300.0220 of the 2020 Minnesota Building Code verifying that at the time of issuance this structure was in compliance with the various ordinances of the local jurisdiction regulating building construction or use. For the following: Building Address:3548 Ivy PL Orono, MN 55391 PIN:2011723420017 Lot/Block:174/ Zoning District: Permit Number:RPS23-000166 Construction Type:VB Residential or Commercial Un-Protected Occupancy Group: IRC 2 Fire Sprinkler: No Owner Name: Owner Address: FOR YOUR INFORMATION For any police, fire or medical emergency - Call: 911 Posting of your assigned street number is required Please Note: The property owner is responsible for all Legal/Engineering charges resulting from this project. Due to varying billing cycles, bills may be mailed up to 90 days after the issuance of this Certificate of Occupancy. February 19, 2025 JEREMY BARNHART ZONING ADMINISTRATOR February 19, 2025 NICOLE EGAN BUILDING OFFICIAL