Loading...
HomeMy WebLinkAboutW15-28_Joint Application 6_8_15  Project Name and/or Number:  1150 Homestead Trail  PART ONE: Applicant Information  If applicant is an entity (company, government entity, partnership, etc.), an authorized contact person must be identified.  If the  applicant is using an agent (consultant, lawyer, or other third party) and has authorized them to act on their behalf, the agent’s  contact information must also be provided.  Applicant/Landowner Name: Tim Skelly  Mailing Address: 13910 60th Avenue North, Plymouth MN 55446 Phone: 612‐889‐4435  E‐mail Address: tim.skelly@claconnect.com    Contact (do not complete if same as above): Ben Carlson, Kjolhaug Environmental Services  Mailing Address: 26105 Wild Rose Lane Sherwood, MN 55331 Phone: 952‐401‐8757  E‐mail Address: ben@kjolhaugenv.com    Agent Name:   Mailing Address:   Phone:   E‐mail Address:     PART TWO: Site Location Information  County: Hennepin City/Township:Orono Parcel ID and/or Address: 2811823320001  Legal Description (Section, Township, Range): Section 28, Township 118N, Range 23W Lat/Long (decimal degrees):   Attach a map showing the location of the site in relation to local streets, roads, highways. Approximate size of site (acres) or if a linear project, length (feet):3.9 acres   If you know that your proposal will require an individual Permit from the U.S. Army Corps of Engineers, you must provide the  names and addresses of all property owners adjacent to the project site.  This information may be provided by attaching a list to  your application or by using block 25 of the Application for Department of the Army permit which can be obtained at:   http://www.mvp.usace.army.mil/Portals/57/docs/regulatory/RegulatoryDocs/engform_4345_2012oct.pdf  PART THREE: General Project/Site Information  If this application is related to a delineation approval, exemption determination, jurisdictional determination, or other  correspondence submitted prior to this application then describe that here and provide the Corps of Engineers project number.  Describe the project that is being proposed, the project purpose and need, and schedule for implementation and completion. The  project description must fully describe the nature and scope of the proposed activity including a description of all project elements  that effect aquatic resources (wetland, lake, tributary, etc.) and must also include plans and cross section or profile drawings  showing the location, character, and dimensions of all proposed activities and aquatic resource impacts.              Project Name and/or Number:  1150 Homestead Trail  Attachment A  Request for Delineation Review, Wetland Type Determination, or  Jurisdictional Determination  By submission of the enclosed wetland delineation report, I am requesting that the U.S. Army Corps of Engineers, St. Paul District  (Corps) and/or the Wetland Conservation Act Local Government Unit (LGU) provide me with the following (check all that apply):    Wetland Type Confirmation    Delineation Concurrence.  Concurrence with a delineation is a written notification from the Corps and a decision from the LGU  concurring, not concurring, or commenting on the boundaries of the aquatic resources delineated on the property. Delineation  concurrences are generally valid for five years unless site conditions change. Under this request alone, the Corps will not address  the jurisdictional status of the aquatic resources on the property, only the boundaries of the resources within the review area  (including wetlands, tributaries, lakes, etc.).   Preliminary Jurisdictional Determination. A preliminary jurisdictional determination (PJD) is a non‐binding written indication  from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of  computation of impacts and compensatory mitigation requirements, a permit decision made on the basis of a PJD will treat all  waters and wetlands in the review area as if they are jurisdictional waters of the U.S.  PJDs are advisory in nature and may not be  appealed.   Approved Jurisdictional Determination. An approved jurisdictional determination (AJD) is an official Corps determination that  jurisdictional waters of the United States are either present or absent on the property. AJDs can generally be relied upon by the  affected party for five years. An AJD may be appealed through the Corps administrative appeal process.   In order for the Corps and LGU to process your request, the wetland delineation must be prepared in accordance with the 1987  Corps of Engineers Wetland Delineation Manual, any approved Regional Supplements to the 1987 Manual, and the Guidelines for  Submitting Wetland Delineations in Minnesota (2013).  http://www.mvp.usace.army.mil/Missions/Regulatory/DelineationJDGuidance.aspx