Loading...
HomeMy WebLinkAbout3359 Crystal Bay Rd new house documentsplan. An inspector should conduct a site visit and confirm the following: 1. The as-built survey accurately depicts conditions on the ground. 2. The site is stabilized to the point any remaining erosion control can be removed. 3. The drainage patterns and downspouts do not direct surface water onto the neighboring properties. 4. The right-of-way has been restored to include drainage, sidewalk (no cracks), curb (no cracks) and stormwater features. 5. The water curb stop is functional. 6. Confirm no grade alterations occurred within the HCRRA ROW.