Loading...
HomeMy WebLinkAbout03-17-2025 - Agenda Packet Planning Commission - PC PacketAgenda Planning Commission Monday, March 17, 2025, 6:00 PM 2780 Kelley Parkway, Orono, MN 55356 952-249-4600 /oronomn.gov 1. Call to Order 2. Pledge of Allegiance 3. Approval of Agenda 4. Approval of Minutes 4.1. Planning Commission Worksession and Regular Minutes of February 18, 2025 5. Public Hearings 5.1. LA25-000007, Matt Jasper, 4745 North Shore Drive, After-the-Fact Conditional Use Permit Amendment (Staff: Melanie Curtis) 5.2. LA25-000009, Midco, 3245 Wayzata Boulevard West, Interim Use Permit (Matthew Karney) 5.3. LA25-000002, City of Orono Text Amendment: City Code Section 78-1279(6) - Average Lakeshore Setback (Laura Oakden) 6. Old Business 6.1. LA24-000054, Rob Page, 430 Old Crystal Bay Road North, Conditional Use Permit, Preliminary Plat, and Site Plan Review (Laura Oakden) 7. Other Items 7.1. Appoint a Vice Chair 8. Adjournment Audience Members: Information regarding each of the agenda items is available on the city website under meetings and in the public packet located in the lobby near the entrance. Applicants will be asked to move to the lectern to answer questions after staff presents the application. The Planning Commission is an advisory body to the City Council. If action is taken on any items on this agenda, they will be scheduled for an upcoming City Council meeting. A quorum of the City Council may be in attendance of a Planning Commission meeting to hear comments made, though no action or deliberation of the Council will occur. Sign up for email notifications at https://www.oronomn.gov/ 1 Date: March 17, 2025 Item: 4.1 Presenter: Laura Oakden, Community Development Director Section: Approval of Minutes Title: Planning Commission Worksession and Regular Minutes of February 18, 2025 1.Purpose: Approve the Planning Commission Minutes 2.Planning Commission Action Requested: Approve the Planning Commission Worksession and Regular Minutes February 18, 2025 AGENDA ITEM Exhibits 02.18.2025 Planning Commission 02.18.2025 Planning Commission Worksession 2 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 1 of 8 Chair Bollis called the meeting to order at 6:00 p.m., followed by the Pledge of Allegiance. 1.ROLL CALL Orono Planning Commission members present:Chair Chris Bollis, Commissioners Mark McCutcheon, Jon Ressler, Scott Kirchner, Kelly Prchal, Andrew Jarnot,and Thomas Brandabur. Commissioners Bob Erickson, Ted Schultze and Gary Kraemer were absent. Staff present: Community Development Director Laura Oakden,City Planner Melanie Curtis, and City Planner Matthew Karney. 2.PLEDGE OF ALLEGIANCE 3.NEW BUSINESS 3.1 Oath of Office Community Development Director Oakden administered the Oath of Office to new Planning Commissioners Kelly Prchal, Andrew Jarnot,and Thomas Brandabur. 4.APPROVAL OF AGENDA Kirchner moved, McCutcheon seconded, to approve the Agenda. VOTE: Ayes 7, Nays 0. 5.APPROVAL OF PLANNING COMMISSION MEETING MINUTES OF NOVEMBER 18, 2024 Ressler moved, Kirchner seconded, to approve the minutes of the Orono Planning Commission meeting of November 18, 2024. VOTE: Ayes 7, Nays 0. 6.PUBLIC HEARINGS 6.1. LA24-000054, ROB PAGE, 430 OLD CRYSTAL BAY ROAD NORTH, CONDITIONAL USE PERMIT. The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve the application for an 85-unit individually-owned garage condos project. The Planning Commission discussed the item and asked questions of staff and the applicants, Rob Page and Dave Ramsey. Chair Bollis opened the public hearing at 6:38 p.m. There were no public comments. Chair Bollis closed the public hearing at 6:38 p.m. Commissioners discussed the merits of the project. The possibility that an individual owner could violate the Conditional Use Permit, jeopardizing the CUP for everyone, the need for a trash plan, parking, 3 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 2 of 8 turnaround for the fire department and the timeline for developing the project in its multiple stages. They indicated they were generally in favor of the application but felt more information is needed. Kirchner moved, Prchal seconded, to deny LA24-000054, 430 Old Crystal Bay Road North, Conditional Use Permit.VOTE: Ayes: 3, Nays 4 (Ressler, Brandabur, Bollis and Jarnot). MOTION FAILED. Ressler moved, Bollis seconded, to table LA24-000054, 430 Old Crystal Bay Road North, Conditional Use Permit.VOTE: Ayes: 6, Nays 1 (McCutcheon). 6.2 LA24-000059, BLUE PENCIL COLLECTIVE O/B/O BRADLEY PASS, 215 NORTH ARM LANE, PRELIMINARY PLAT: "IDYLLVALE SHORES", PUBLIC HEARING, REVIEW #2 The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and take action on the proposed revised preliminary plat consisting of five conforming lots rather than the original six. The Planning Commission discussed the item and asked questions of staff and the applicant, Kasey Johnson of Blue Pencil Collective. Chair Bollis opened the public hearing at 7:27 p.m. Mary Larson, 366 North Arm Lane, asked if the existing road serving the area would be wide enough as two cars are not able to pass there. Mike Demeuse, 350 North Arm Lane, said he wanted to push back on the idea that exceptions should be made to allow this development on a sensitive parcel with negative impacts on the neighboring residents. Mandy Little, 4620 North Arm Drive, said their property would be the one that would have a cul-de-sac all along it which they do not support. She quoted from the 2040 comprehensive plan regarding the impact of new developments on existing rural residents. Randall Nord, 100 Bayside Trail, said he had a number of questions but added he has concerns about lot 4 in the plat in terms of elevations and run-off into the wetland. He said it seemed like a lot of pavement to get to the lot. Melissa Demeuse, 350 North Arm Lane, asked if the commissioners had been out and looked at the property as she wanted them to understand how much is wetland and how much has the capacity to be developed. Chair Bollis closed the public hearing at 7:39 p.m. Bollis explained the wetlands are controlled by the watershed district and approval would be contingent upon their approval. 4 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 3 of 8 Commissioners said they were concerned about the turning radius, length of the new road,and the density of the plat, given the wetlands so close to the lake, although the lots are conforming. They said they could anticipate future owners of the lots coming back for variances. It was noted property owners have the right to develop their property. McCutcheon moved, Prchal seconded, to deny LA24--000059, 215 North Arm Lane, Preliminary Plat: "Idyllvale Shores", as applied. VOTE: Ayes: 5, Nays 2 (Ressler and Kirchner). Chair Bollis recessed the meeting at 8:30 p.m. The meeting was reconvened at 8:35 p.m. 6.3 LA24-000065, HARTMAN COMPANIES, 980 HERITAGE LANE, CONDITIONAL USE PERMIT The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve a request for a conditional use permit for a retaining wall about 28 feet from the lake.The applicant provided an updated landscape plan that would screen the proposed walls from the lake. The Planning Commission discussed the item and asked questions of staff. The applicant,Seth Eggert, Hartman Companies, was present. Chair Bollis opened the public hearing at 8:41 p.m. There were no public comments. Chair Bollis closed the public hearing at 8:41 p.m. Commissioners said the request met the requirements for the conditional use permit. Kirchner moved, Ressler seconded, to approve LA24-000065 as applied with the proposed screening of the walls,980 Heritage Lane, Conditional Use Permit. VOTE: Ayes: 7, Nays 0. 6.4 LA24-000066, DEAN &SUSAN THOMSON, 430 EAST LONG LAKE ROAD, CONDITIONAL USE PERMIT & VARIANCES The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and deny the request for a conditional use permit to keep up to 30 pigeons on the property.The property is next to Wood-Rill SNA, an undeveloped natural area,but is deficient in lot size and set back from lot lines for farm animals.Staff noted pigeons are not specifically called out in the ordinances,but the applicant’s proposed use is consistent with farm animals. The Planning Commission discussed the item and asked questions of staff and the applicant,Dean and Susan Thomson, 685 Old Long Lake Road,the owners of 430 East Long Lake Road which,is a rental property.They said the pigeons are not named as farm animals and would be intended to be pets and a hobby and not for consumption. Chair Bollis opened the public hearing at 8:57 p.m. 5 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 4 of 8 Kim Simensen of Minnetonka said she knows the applicants and keeps chickens on her property and in the four years she has had them,they have not attracted predators.She said keeping pigeons is popular in Europe and is an emerging sport here. Chair Bollis closed the public hearing at 9:02 p.m. Commissioners discussed possibly limiting the number of birds if the City considers 25 an animal unit; whether pigeons are farm animals;the possibility that raising, trading and selling them create a business, and whether the coop met the requirements for an auxiliary structure.It was suggested the City needs to amend the code around the issue of birds as farm animals. Ressler moved, Prchal seconded, to approve LA24-000066, 430 East Long Lake Road, Conditional Use Permit & Variances, as applied limiting to a maximum of 25 pigeons and that the staff consider a text amendment for farm animals. VOTE: Ayes: 7, Nays 0. 6.5 LA24-000067, NORTHSTAR RENOVATIONS LLC, 2691 ETHEL AVENUE, VARIANCES The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve the request for a new average lakeshore setback variance for a new deck and steps that differ from a deck and steps approved by a different variance in 2023. The Planning Commission discussed the item and asked questions of staff and the applicant, Eric Brandt, Northstar Renovations LLC. Chair Bollis opened the public hearing at 9:21 p.m. There were no public comments. Chair Bollis closed the public hearing at 9:21 p.m. Commissioners said they agreed with staff that the adjustments between variance requests were minor. Kirchner moved, Ressler seconded, to approve LA24-000067, Northstar Renovations Llc, 2691 Ethel Avenue, Variances. VOTE: Ayes: 7, Nays 0. 6.6 LA24-000070, TOM RYAN, 2195 WATERTOWN ROAD, EASEMENT VACATION The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve an easement vacation for an unnecessary portion of easement with the understanding that the property owner would give a small piece of additional needed easement to accommodate the project as built. The Planning Commission discussed the item and asked questions of staff.The applicant had been present but was unable to stay. 6 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 5 of 8 Chair Bollis opened the public hearing at 9:27 p.m. There were no public comments. Chair Bollis closed the public hearing at 9:27 p.m. Commissioners discussed whether the easement could be needed in the future versus encumbering land that isn’t needed. Ressler moved, Brandabur seconded, to approve LA24-000070, 2195 Watertown Road, Easement Vacation as applied.VOTE: Ayes: 7, Nays 0. 6.7 LA25-000001, TOM BRAY O/B/O EDWARD H. HAMM JR., TRUSTEE, 485 ORONO ORCHARD ROAD SOUTH,PRELIMINARY PLAT:SKY BLUE WATERS AND TERMINATION OF COVENANT. The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve a new preliminary plat creating one additional conforming lot and terminating a covenant. The Planning Commission discussed the item and asked questions of staff and the applicant, Tom Bray, Edina, an attorney for Edward Hamm. Chair Bollis opened the public hearing at 9:48 p.m. Jamin Marks, 1570 Fox,asked about intent related to the northern portion of the property and said materials for the meeting should come out sooner. Chair Bollis closed the public hearing at 9:51 p.m. Commissioners said the request makes sense since Fox Street runs through the property and it would never be buildable as one lot. There are two lots, a northern and a southern. Bollis was opposed to eliminating the covenant. McCutchen moved, Kirchner seconded, to approve LA25-000001,Orono Orchard Road South,Preliminary Plat:Sky Blue Waters And Termination of Covenant.VOTE: Ayes: 6, Nays 1 (Bollis). 6.8 LA25-000003, STONEWOOD LLC, 155 WEAR LANE NORTH, VARIANCES The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve a request for a new covered stoop to control water getting into the house. The Planning Commission discussed the item and asked questions of staff and the applicants, John Daly Stonewood, Wayzata and Ross Johnson, 155 Wear Lane, the homeowner. Chair Bollis opened the public hearing at 10:09 p.m. 7 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 6 of 8 There were no public comments. Chair Bollis closed the public hearing at 10:09 p.m. Commissioners said it is a good solution to a water problem for a small encroachment in the setback and would not be able to be viewed by neighbors.Several were concerned the portico and stoop would not be enough to solve the water problem, and that a practical difficulty was not sufficiently established. McCutcheon moved, Jarnot seconded, to approve LA25-000003, 155 Wear Lane North, Variances, as applied.VOTE: Ayes: 5, Nays 2 (Ressler and Kirchner). 6.9 LA25-000004, NORTON HOMES O/B/O MARK FERRY & ELIZABETH FLYNN FERRY, 3545 IVY PLACE, AVERAGE LAKESHORE SETBACK VARIANCE The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve the request for a variance for small changes to the footprint of a plan approved last year. The applicant is working with a new builder. Staff said there are significant impacts to the buildable area. The Planning Commission discussed the item and asked questions of staff and the applicant, Pat Hiller of Norton Homes, Inver Grove Heights, representing the homeowners. Chair Bollis opened the public hearing at 10:21 p.m. There were no public comments. Chair Bollis closed the public hearing at 10:21 p.m. Commissioners said they agreed with staff that the changes were minor and they had already reviewed the plan last year. Ressler moved, McCutcheon seconded, to approve LA24-000004,3545 Ivy Place, Average Lakeshore Setback Variance. VOTE: Ayes: 7, Nays 0. 6.10 LA25-000005, SCHWARZ BUILDERS INC, 1480 BOHNS POINT ROAD, VARIANCES The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and consider the request for an average lakeshore setback variance that would add 3.5 feet of defined height to an accessory structure on the property to match the existing house but reduce the size of the footprint and hardcover. The Planning Commission discussed the item and asked questions of staff and the applicants, Jack Schwarz and Kurt Schwarz,Schwarz Builders Inc. Chair Bollis opened the public hearing at 10:42 p.m. There were no public comments. 8 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 7 of 8 Chair Bollis closed the public hearing at 10:42 p.m. Commissioners noted that the plan was to build an accessory building to match the main building and reduce the footprint but they could not see a practical difficulty since the applicants could rebuild the structure in its current dimensions without a variance. Ressler moved, McCutcheon seconded, to deny LA25-000005, 1480 Bohns Point Road, Variances. VOTE: Ayes: 6, Nays 1 (Brandabur). 6.11 LA24-000063, CITY OF ORONO, COMPREHENSIVE PLAN AMENDMENT The Planning Commission is requested to review the Staff report, receive a presentation,and discuss and approve the Comprehensive Plan Amendment that would extend sewer along Leaf and Fox Street to serve several lakeshore lots off Fox Street by creating a land use classification for large lakeshore lots. The Comprehensive Plan supports replacing septic systems along the lakeshore. The Planning Commission discussed the item and asked questions of staff. Chair Bollis opened the public hearing at 11:02 p.m. There were no public comments. Chair Bollis closed the public hearing at 11:02 p.m. Commissioners said the proposal was confusing,but the explanation clarified it and the amendment makes sense. McCutcheon moved, Prchal seconded, to approve LA24-000063, Comprehensive Plan Amendment. VOTE: Ayes: 6, Nays 1 (Ressler). 7.OTHER ITEMS Community Development Director Oakden reported all applications seen by the Planning Commission in November were approved by the City Council as recommended. Three new Planning Commission members were seated that evening and they will be interviewing for more. 8.ADJOURNMENT McCutcheon moved, Jarnot seconded, to adjourn the Planning Commission Meeting at 11:09 p.m. to March 17, 2025.VOTE: Ayes 7, Nays 0. ATTEST: _________________________________________ Christopher Bollis, Chair 9 Minutes Planning Commission Regular Meeting Tuesday,February 18, 2025, 6:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Page 8 of 8 10 Minutes Planning Commission Worksession Meeting Tuesday, February 18, 2025, 5:00 PM City Council Chambers 2780 Kelley Parkway, Orono, MN 55356 Chair Bollis called the meeting to order at 5:00 p.m. 1.ROLL CALL Orono Planning Commission members present:Chair Chris Bollis, Commissioners, Kelly Prchal, Andrew Jarnot,and Thomas Brandabur. Staff present: Community Development Director Laura Oakden,City Planner Melanie Curtis, and City Planner Matthew Karney. 2.WORKSESSION ITEM-Planning Commission Overview/Trailing City staff presented the background and orientation to the 3 newly appointed commissioners. Staff and commission discussed the scope of the planning commission and the regulations associate with land use applications. 3.ADORNMENT The meeting closed at 5:50pm. ATTEST: _________________________________________ Christopher Bollis, Chair 11 Date: March 17, 2025 Item: 5.1 Presenter: Melanie Curtis, Planner Section: Public Hearings Title: LA25-000007, Matt Jasper, 4745 North Shore Drive, After-the-Fact Conditional Use Permit Amendment (Staff: Melanie Curtis) 1.Purpose: The purpose of this application is to consider new retaining walls within the bluff and lake setback installed without City approval. An after-the-fact amendment to the CUP is required. 2.MN§15.99 Application Deadline: The application was received on January 30 and considered to be complete on February 14; therefore the 60-day review timeline will expire on April 15, 2025. 3.Background: The applicant received approvals in 2024 to improve the long-neglected bluff and shoreline with a new, set-in-grade stone stair with two retaining wall-supported landings and a single retaining wall located immediately upslope from the new rip-rap (and rip-rap permitted by the MCWD). Upon completion, the City’s inspector visited the site and observed additional walls which were not included in the scope of the approved plan, walls within bluffs and lake setback area can only be authorized by the City Council through a conditional use permit process. Planning Commission June 2024: PACKET / VIDEO City Council July 2024: PACKET When notified by the City, the applicant applied for consideration of an after-the-fact amendment to the CUP issued under Resolution No. 7486 (Exhibit B). For a detailed analysis of the project please refer to the planning report attached as Exhibit A. 4.Public Comment: No public comments were received regarding this application. 5.Staff Recommendation: Staff recommends approval of the after-the-fact amendment to the 2024 CUP conditioned upon the applicant providing a revised landscape plan to screen all of the walls from the lake year-round. 6.Planning Commission Action Requested: Planning Commission should discuss the plan changes. determine if the additional walls constructed meet the CUP criteria for approval, and if so, make a MOTION for approval conditioned upon submittal of a revised landscape plan. AGENDA ITEM Exhibits Exhibit A - LA25-000007 Staff Report Exhibit B - Application 12 Exhibit C - Asbuilt Survey annotated Exhibit D - Resol 7486 Exhibit E - 2024 Approved Plans Exhibit F - Hardcover Calculations Exhibit G - Updated Engineer Comments Exhibit H - Annotated Pics 092624 (from lake) Exhibit I - Site Comparison Photos Exhibit J - Map & Labels 13 Date Application Received: 01/30/2025 Date Application Considered as Complete: 02/14/2025 60-Day Review Period Extension Expires: 04/15/2025 To: Chair Bollis and Planning Commission Members Adam Edwards, City Administrator From: Melanie Curtis, Planner mcc Date: 17 March 2025 Subject: #LA25-000007, Matt Jasper, 4745 North Shore Drive After-the-Fact CUP Amendment: for retaining walls within the 75-foot setback and bluff Public Hearing BACKGROUND: The applicant purchased the property in 2024 and began to pursue permits to improve the long- neglected bluff and shoreline. After reviewing and declining several iterations of the applicant’s plan, the City granted a CUP for a new, set-in-grade stone stair with two retaining wall-supported landings and a single retaining wall located immediately upslope from the new rip-rap on the eastern portion of the shoreline designed by the applicant’s engineer (Vickery Engineering). The approved plans are detailed in the approved plan set (Exhibit E) and Resolution 7486 (Exhibit D), and are depicted below in yellow on Insets A and B. Inset A Inset B Application Summary: The applicant requests an after-the-fact amendment to the conditional use permit authorizing newly constructed boulder retaining walls, including the boulder walls bordering the lake access stairs, within the bluff and the lake setback which exceed approvals granted in 2024. Staff Recommendation: Staff recommends approval conditioned upon receipt of an acceptable (updated) landscape plan prior to City Council review. 14 FILE # LA24-000007 17 March 2025 Page 2 of 6 In bluff and steep slope settings, the City code allows stairways, lifts, and landings, either constructed above the ground on posts or pilings or placed into the ground, provided they are designed and built in a manner that ensures stability and control of soil erosion. Staff can administratively approve minimal retaining walls supporting a lake access stair within a bluff and/or within the 75-foot lake setback to provide stability in steep slope settings. New walls, and walls that do not meet the administrative approval threshold, can only be authorized by the City Council through a conditional use permit process. Inset C: As-built When the project was completed, the City’s inspector observed additional walls which were not included in the scope of the approved plan, shown in blue on Inset C on the right. When questioned by staff, the applicant explained why they chose to deviate from the approved plan. Although the city-approved plan was designed by his engineer for the site conditions, the applicant communicated to staff that he believed the approved plan would not work and chose to construct the additional walls (shown on the as-built survey) instead of following the approved plan. The applicant provided an updated analysis from his engineer regarding the additional walls, Exhibit G. Conditional Use Permit Analysis: The applicant provided an as-built survey depicting the finished walls and stairway (Exhibit C) and revised documentation about the slope stability from a professional engineer based on assumptions about the soil information provided by the applicant (Exhibit G). Applicable Regulations: Conditional Use Permit (Sections 78-1279 and 78-916) Section 78-1279(3)(c) states: “a wall in the shore setback zone, within a defined bluff and bluff setback; and/or a replacement wall 4 feet in height or greater; and/or any new walls shall require a conditional use permit. New walls and replacement walls greater than 4 feet in height must meet the following conditions. The wall must be…”: 1. Designed to correct an established erosion problem; The applicant’s engineer provided an analysis of the slope stability documenting the existing erosion on the slope and an engineered design to enhance the stability and correct existing slope erosion for the 2024 approval. The applicant constructed additional, unpermitted walls within the bluff (see photo Exhibits H & I). When questioned, the applicant asserted to staff that he believed the approved plan would not sufficiently address the bluff stability and that the additional walls along the base of the slope and the entire length of the stairway were necessary. The applicant further contends that the construction of the additional walls eliminated the need to grade further inland on the slope to create stability. However, in reviewing the resulting site conditions, 15 FILE # LA24-000007 17 March 2025 Page 3 of 6 it appears that unpermitted grading did occur, resulting in a leveled pathway along the shore above the rip-rap. The additional walls were installed to facilitate this flat path area (see Exhibits H & I). The existing bluff was not well-vegetated before the project began, the disturbances resulting from the materials transport and construction activity have further impacted the vegetation on the slope. The applicant has not demonstrated that non-mechanical solutions such as deep-rooted plants and shrubs are not sufficient to provide the necessary stability. The applicant should consider a more robust vegetation plan to provide additional, long-term erosion control for the slope in addition to the walls. A landscape plan must be submitted to address the erosion within the bluff. This criterion has not been met; and 2. Suitable given the demonstrated need; A global stability analysis by Ronald W. Vickery, PE was provided for the 2024 approval. Mr. Vickery’s original opinion (and design) was based on assumptions furnished by the applicant. The engineer’s updated analysis (Exhibit G) states the additional retaining walls improve the stability of the bluff based on information provided to the engineer by the applicant. This criterion has been met; and 3. Designed by a registered engineer or landscape architect, depending on the project scope; the applicant provided a revised retaining wall design from Mr. Vickery, a registered engineer, to match the wall plan as constructed. This criterion has been met; and 4. Designed to be the minimum size necessary to control the erosion problem. The engineer’s original analysis indicated that the applicant’s original plan was necessary to stabilize the bluff. The engineer provided a revised slope analysis/opinion indicating the additional walls were necessary. This criterion has been met. In addition to the conditions listed in Section 78-1279, Section 78-916 provides a list of conditions supporting Conditional Use Permit (CUP) issuance. The Planning Commission may recommend and the Council may grant a CUP as the use permit was applied for or in modified form. Based on the application and the evidence submitted, the city must find that the proposed use at the proposed location is or will be: 1) Consistent with the community management plan; Protection and preservation of the natural lake shoreline is a priority outlined within the Comprehensive Plan. Mechanical measures, such as the installation of retaining walls, particularly walls integrated into a vertical continuation of the rip-rap (without an opportunity for screening), should not be the first option for slope stability. Further, the applicant violated the conditional use permit and the administrative building permit by adding unpermitted walls without the opportunity for the City Council consideration of placement, necessity, and screening. This criterion is not met. 2) Compliant with the zoning code, including any conditions imposed on specific uses as required by article V, division 3 of the City Code; Retaining walls within the lakeyard were considered under the previous application and were permitted where they were deemed necessary by the applicant’s engineer to protect the integrity of the slope. During construction, the applicant constructed additional (unpermitted) walls to correct, what was perceived as a failing slope, not verified by his engineer. Mr. Vickery provided after-the-fact opinion which appears to correct or supersede his previous analysis. This criterion is not met. 3) Adequately served by police, fire, roads, and stormwater management; The property meets this standard. This criterion has been met. 16 FILE # LA24-000007 17 March 2025 Page 4 of 6 4) Provided with an adequate water supply and sewage disposal system; The property meets this standard. This criterion has been met. 5) Not expected to generate excessive demand for public services at public cost; As a result of the applicant’s unpermitted work, additional staff time and inspections were required beyond that of a standard project. The proposed project for retaining walls will not impact utility or public infrastructure and will not result in an excessive demand on public services at public cost. This criterion has been met. 6) Compatible with the surrounding area as the area is used both presently and as it is planned to be used in the future; The installation of the additional walls supporting the stone staircase and lakeshore pathway have changed the character of the property. The unpermitted walls supporting the stone staircase and pathway construction do not provide an opportunity for vegetative screening from the lake. This criterion is not met. 7) Consistent with the character of the surrounding area, unless a change of character is called for in the community management plan; The installation of stone retaining walls without vegetative screening has changed the character of the property, impacting the surrounding area. This criterion is not met. 8) Compatible with the character of buildings and site improvements in the surrounding area, unless a change of character is called for in the community management plan; The unpermitted retaining walls constructed the entire width of the property are not screened from view from the lake. The historically natural appearance of the property, although unmaintained for years, has been irrevocably altered by the additional walls installed along the entirety of the stone stair and at the base of the slope. This criterion is not met. 9) Not expected to substantially impair the use and enjoyment of the property in the area or have a materially adverse impact on the property values in the area when compared to the impairment or impact of generally permitted uses; The lakeshore bluff improvements should not impair property values or the enjoyment of the neighboring property owners. This criterion has been met. 10) Provided with screening and buffering adequate to mitigate undesirable views and activities likely to disturb surrounding uses; The applicant has not provided a landscape plan to address the additional unpermitted walls constructed on site. Wherever possible, all retaining walls should be screened by year-round vegetation to provide natural screening and buffering of the stone stairway and retaining wall improvements when viewed from the lake. This criterion is not met. 11) Not create a nuisance which generates smoke, noise, glare, vibration, odors, fumes, dust, electrical interference, general unsightliness, or other means; The proposed walls should not create a nuisance situation. This criterion has been met. 12) Not cause excessive non-residential traffic on residential streets, parking needs that cause a demonstrable inconvenience to adjoining properties, traffic congestion, or unsafe access; 17 FILE # LA24-000007 17 March 2025 Page 5 of 6 The property is situated on a severe curve along a busy County roadway. The amount of traffic, proximity, and location of the driveway, and the topography pose challenges for access and construction. This is an after-the-fact review of constructed improvements, impacts to traffic and residential streets are not anticipated. This criterion has been met. 13) Designed to take into account the natural, scenic, and historic features of the area and to minimize environmental impact; The applicant installed boulder walls to be consistent with the aesthetic of the stone slab stairway and installed rip-rap. The applicant has not provided a revised landscape plan to screen the additional, unpermitted walls. Compatibility with the character of the surrounding area has not been verified. This criterion is not met. 14) All exterior lighting shall be so directed so as not to cast glare toward or onto the public right-of-way or neighboring residential uses or districts; The lake yard improvements should not result in any lighting or glare being cast off the property toward the public street, the neighbors, or the lake; this criterion has been met. 15) Not detrimental to the public health, public safety, or general welfare. This is true of the project. This criterion has been met. A CUP may be granted subject to such conditions as the Council may prescribe. Additionally, a CUP shall remain in effect as long as the conditions imposed by the City Council are observed, but nothing in this section shall prevent the city from enacting or amending official controls to change the status of conditional uses. Section 78-1680 and 78-1700 – Hardcover Calculations: Stormwater Overlay District Tier Total Area in Zone Allowed Hardcover Existing Hardcover Proposed Hardcover Tier 1 25,288 s.f. 6,322 s.f. (25 %) 3,291.8 s.f. (13%) 3,579 s.f. (14.1%) Public Comments To date, no public comments have been received. Issues for Consideration 1. The construction of the additional, unpermitted walls was a violation of the terms of the CUP authorized by Resolution 7486, and the administrative building permit. Should the owner be required to remove the additional walls and restore the site following Resolution 7486? 2. Does the Commission find it necessary to impose conditions to mitigate the impacts created by the granting of the requested CUP? 3. Are there any other issues or concerns with this application? Planning Commission Consideration Options for Motion: 1. Deny the application as applied. The applicant should be directed to correct the site following the approved plan, which was designed by the applicant’s engineer; or 2. Move to table the application and direct the applicant to provide additional information as determined by the Planning Commission review on the April agenda; or 18 FILE # LA24-000007 17 March 2025 Page 6 of 6 3. Move to approve the project as constructed and amend the CUP after-the-fact. A revised landscape plan to screen the additional boulder walls should be provided before the City Council reviews the application. Planning Staff Recommendation Planning Commission should discuss the plan changes. determine if the additional walls constructed meet the CUP criteria for approval, and make a recommendation. If the Commission finds the criteria have been satisfied, a recommendation for approval may be appropriate. Staff recommends the Commission direct the applicant to provide an updated landscape plan to screen the walls from the lake. 19 Land Use Application Summary Application Date:01/30/2025 Address:4745 Northshore Drive Mound, MN 55364 Parcel Number: Land Use Number:LA25-000007 Application Submitted By:Property Owner Owner:Name: Address: Jasper Properties - Matthew Jasper Applicant:Name: Matthew Jasper Company: Jasper Properties Address: 1929 Fagerness Point Road Orono, MN 55391 matthew.jasper1@hotmail.com Contact Information:Associated Contact: Associated Contact: Associated Contact: Associated Contact: Project Description:After the Fact CUP Land Use Application Type:Amendmend Application Appeal of Admin Decision Concept Application Conditional Use Permit Site Plan Application Subdivision Application Subdivision Exception Vacation Application Variance Application Applicant Signature: 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 June 17, 2024 Project VEC 24-055 Mr. Matt Jasper 4745 North Shore Drive Orono, MN 55364 Dear Mr. Jasper: Re: Global Stability Analysis, 4745 North Shore Drive, Orono, MN (Revision 3 Letter) As you requested, Vickery Engineering & Consulting, LLC (VEC) has prepared the Boulder Retaining Wall Plans for the referenced project. The Boulder Wall Plans and Boulder Wall Calculations were submitted under separate cover. As part of the design process, a global stability analysis of the proposed slope was performed. Attached to this letter is the results of the global stability analysis. The analysis was performed using GSlope global stability software. The soil properties for the global stability analysis were assumed, based on information provided by you. As you can see from the attached global stability analysis, the results of the analysis indicate an overall global stability factor of safety of 1.378, which is in excess of the industry standard factor of safety of 1.3. Please note, without the retaining walls, this factor of safety would be less than 1.3. Therefore, the retaining walls and the stair system are required to stabilize the slope. Engineering services provided by VEC engineers for this project have been conducted with that level of care and skill ordinarily exercised by members of profession currently practicing in Minnesota under similar time restraints and conditions. No warranty, expressed or implied, is made. Thank you for using the services provided by VEC. If you have any questions regarding this letter, please call Ron Vickery at 952-465-8272. I hereby certify that this plan, specification, or report was prepared under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Ronald W. Vickery, PE President/Principal Engineer Registration Number: 24065 June 17, 2024 Attachments: Global Stability Analysis 49 9309309409409509509609604/15/2024 8:12:06 AM F = 1.378Gamma CPhiPiezo Ru pcf psfdegSurf.Boulders 145 200 50 1 0Clayey Sand 120 100 30 1 0VEC 24-0554745 North Shore Drive, Orono, MN April 15, 2024-50050100150F = 1.37850 51 52 53 54 55 56 57 58 Last Updated: January 2020 Note: This is an information sheet only, every effort has been made to insure the accuracy of the information contained herein; however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. Page 8 of 9 City of Orono Hardcover Calculation Worksheet Property Address: Prepared by: Date: Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to site plan or survey (must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75’ setback line and calculate hardcover square footage separately for each portion. Key to Survey Hardcover Item (Describe) Length x Width Total (Square Feet) (Example) (Garage) (24’ x 30’) (720 S.F.) A S.F. B S.F. C S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. (1) Total Existing Hardcover S.F. Excludable Hardcover (See City Code Sec 78-1684): S.F. S.F. S.F. S.F. S.F. (2) Total Excludable Hardcover S.F. (3) Net Existing Hardcover [Subtract line (2) from line (1)]S.F. (4) Total Lot Area S.F. Proposed Hardcover Percentage [ (3) ÷ (4) ] % (Proposed Hardcover next page) Garage 34.6' X 21.8' House (23' X 30') (17.2' X 33.8') Deck (15' X 10') (4' X 25') Cantilever 4' X 33.8' Driveway 34' X 18'Retaining wall not within 75'140' X 1' Stairway to Lake & Other (80' X 4') (10' X 4')Pump/Boat House 14.9' X 12.5' 754.28 1,271.36 250 135.2 612 140 360 186.25 Retaining wall not within 75'140' X 1'140 First 100 SF Pervious of Deck 100 240 3,718.09 3,478.09 25,288 13.753 4745 North Shore Drive Matt Jasper 6/11/2024 Air Conditioner 3' X 3'9 59 Last Updated: January 2020 Note: This is an information sheet only, every effort has been made to insure the accuracy of the information contained herein; however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. Page 9 of 9 City of Orono Hardcover Calculation Worksheet Property Address: Prepared by: Date: Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to site plan or survey (must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75’ setback line and calculate hardcover square footage separately for each portion. Key to Survey Hardcover Item (Describe) Length x Width Total (Square Feet) (Example) (Garage) (24’ x 30’) (720 S.F.) A Garage S.F. B S.F. C Deck S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. (1) Total Proposed Hardcover S.F. Excludable Hardcover (See City Code Sec 78-1684): S.F. S.F. S.F. S.F. S.F. (2) Total Excludable Hardcover S.F. (3) Net Proposed Hardcover [Subtract line (2) from line (1)]S.F. (4) Total Lot Area S.F. Proposed Hardcover Percentage [ (3) ÷ (4) ] % 34.6' X 21.8' Driveway House Retaining Wall Not Within 75' of Lake l 135.2 754.28 612 25,288 First 100 SF Pervious of Deck 4745 North Shore Drive Matt Jasper 6/11/2024 4' X 33.8' 34' X 18' Cantilever (15' X 10') (4' X 25') 250 (23' X 30') (17.2' X 33.8')1,271.36 4,014.12 14.92 3,744.12 240 100 140 Retaining Wall Not Within 75' of Lake Stairway to Lake & four landingsPump/Boat House Air Conditioner (85' X 4') (5.5 X 5.5 X 4) Retaining Wall Within 75' of Lake near Rip Rap 90' X 1' 14.9' X 12.5' 3' X 3' 140' X 1'140 461 186.25 9 90 140' X 1' Retaining Wall Within 75' of Lake along stairway 55' X 1'55Retaining Wall Within 75' of Lake at slope bottom 50' X 1'50 60 From:Ronald W. Vickery, P.E. To:Jasper, Matthew M CSM USARMY NG MNARNG (USA) Subject:VEC 24-055 - 4745 North Shore Drive, Orono, MN Date:Tuesday, December 3, 2024 12:15:20 PM Attachments:Asbuilt Survey 23170 dated 11-12-24.pdf Matt - as requested, I reviewed the attached as-built survey for your project. As we previously discussed, the step pieces needed protection from erosion by placing additional boulders along the staircase to keep the stairs protected. Also as we discussed, at the bottom of the hillside where the shed was previously located, there was a retaining wall that had been washed over. The contractor rebuilt that wall and extended it to the stairway because of how steep the hillside was. There was a concern that the hill could potentially slide and jeopardize the stairs. Therefore, the additional wall was required for overall stability. Please let me know if you have questions or need anything else. Thanks, Ron We’ve moved! See our new address below! Ronald W. Vickery, PE Vickery Engineering & Consulting, LLC Post Office Box 86 Grandy, MN 55029 Phone: 952-465-8272 www.vickeryeng.com ~Engineering Solutions for an Unstable World~ 61 62 63 64 65 66 36 12-117-24 41 0001 JOSEPH GARRITANO JILL TOKARCZYK 4801 MINNEAPOLIS AVE MOUND MN 55364 36 12-117-24 41 0013 STEPHEN J KAMINSKI KAY G KAMINSKI 4821 MINNEAPOLIS AVE MINNETRISTA MN 55364 38 07-117-23 23 0027 DWIGHT A AFFELDT PATRICIA E AFFELDT 4765 TONKAVIEW LA MOUND MN 55364 38 07-117-23 23 0035 NICHOLAS SCHMITT 4740 TONKAVIEW LA MOUND MN 55364 38 07-117-23 23 0036 STEVEN F & JOAN VALEK 4720 TONKAVIEW LA MOUND MN 55364 38 07-117-23 23 0037 STEVEN F & JOAN VALEK 4720 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0003 TERRY CHRISTIANSON 4641 TONKA VIEW LANE MOUND MN 55364 38 07-117-23 32 0004 ALLEN BREDESON 4735 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0009 VIKTORYIA BANCHUK 6627 TESSMAN LN BROOKLYN PARK MN 55445 38 07-117-23 32 0010 RYAN P TURNER 4745 TONKAVIEW CT MOUND MN 55364 38 07-117-23 32 0011 JAMES & MARTHA HARTFIEL 4749 TONKAVIEW CT MOUND MN 55364 38 07-117-23 32 0012 S A SCHAUER & F E KOUBSKY 4751 TONKAVIEW CT MOUND MN 55364 38 07-117-23 32 0013 CORY GERBER JANICE GERBER 4753 TONKAVIEW CT MOUND MN 55364 38 07-117-23 32 0014 L GREENHAGEN & V GREENHAGEN 4739 TONKAVIEW CT MOUND MN 55364 38 07-117-23 32 0019 MATTHEW MICHAEL JASPER 4745 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0020 THOMAS J CORNELISSEN KAREN PRESTON 4753 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0021 NAM PHAM THU PHAN 8812 138TH ST W SAVAGE MN 55378 38 07-117-23 32 0022 BEN A WASSCHER TRUST KATRINA WASSCHER TRUST 4775 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0023 CITY OF ORONO P O BOX 66 CRYSTAL BAY MN 55323 38 07-117-23 32 0025 ERICH K BLAUFUSS ELIZABETH BLAUFUSS 4625 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0026 JAMES R & DAWN ABRAHAMSON 4629 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0050 AARON COHODES GOLDSTEEN 4680 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0053 GEORGE THOMAS AHERN CANDACE F AHERN 1345 REST POINT LA MOUND MN 55364 38 07-117-23 32 0054 GEORGE T AHERN CANDACE F AHERN 1345 REST POINT LA MOUND MN 55364 38 07-117-23 32 0056 KELLI GILLSPIE-COEN STEVEN C COEN 4685 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0057 KIM G & HONI L MARONDE 4755 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0058 ANDREW H & TRACY K RASCHER 4705 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0059 MOLLY G PORTER CAMERON J PORTER 4695 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0064 ROAL REVOCABLE INTERVIVOS TR 4655 TONKAVIEW LA MOUND MN 55364 38 07-117-23 32 0065 DAVID DARROW JENNIFER ZICK 4685 TONKAVIEW LA MOUND MN 55364 67 38 07-117-23 32 0066 BRADLEY K ARENDS TEMPEST A ARENDS 4725 NORTH SHORE DR MOUND MN 55364 38 07-117-23 32 0067 JUSTIN B HOUSTON ALLISON J HOUSTON 4731 NORTH SHORE DR MOUND MN 55364 68 Hennepin County Locate & Notify Map 4745 North Shore Dr 0 100 20050 Feet Date: 1/31/2025 Buffer Size:500 Map Comments: This data (i) is furnished 'AS IS' with no representation as to completeness or accuracy; (ii) is furnished with no warranty of any kind; and (iii) is notsuitable for legal, engineering or surveying purposes. Hennepin County shall not be liable for any damage, injury or loss resulting from this data. For more information, contact Hennepin County GIS Office 300 6th Street South, Minneapolis, MN 55487 / gis.info@hennepin.us 69 Date: March 17, 2025 Item: 5.2 Presenter: Matt Karney, Planner Section: Public Hearings Title: LA25-000009, Midco, 3245 Wayzata Boulevard West, Interim Use Permit (Matthew Karney) 1.Purpose: The applicant requests an Interim Use Permit (IUP) for equipment storage and staging associated with a utility project in public rights-of-way. 2.MN§15.99 Application Deadline: The application was made on February 18, 2025 and deemed complete on February 28, 2025. Following the 60-day review period this application expires on April 29, 2025. 3.Background: The applicant requests an Interim Use Permit to utilize an approximately 5-acre portion of a 25.8-acre parcel at 3245 Wayzata Boulevard West for staging and storage to support a utility fiber project in public rights-of-way in the City of Orono. The applicant requests the duration of the IUP to run through the end of December 2026. 4.Public Comment: No public comments have been received. 5.Staff Recommendation: Staff recommends approval of the Interim Use Permit for equipment storage and staging associated with a utility project in public rights-of-way, subject to the following conditions: 1. The interim use permit will be active until the end of December 2026, as requested by the applicant. 2. The applicant shall ensure all other permits for other governmental agencies are obtained prior to commencing work on the site, this includes Hennepin County and Minnehaha Creek Watershed District 6.Planning Commission Action Requested: If the commission agrees with staff's analysis; a MOTION should be made for approval of the proposed application with the identified conditions. AGENDA ITEM Exhibits Exhibit A - Staff Report Exhibit B - Application Summary Exhibit C - Cover Letter Exhibit D - Site Plan Exhibit E - Aerial Images 70 Exhibit F - Survey Exhibit G - Mailing Map and List 71 Date Application Received: 02/18/2025 Date Application Considered as Complete: 02/28/2025 60-Day Review Period Extension Expires: 04/29/2025 To: Chair Bollis and Planning Commission Members Adam Edwards, City Administrator From: Matthew Karney, Planner Date: 17 March 2025 Subject: LA25-000009, Midco, 3245 Wayzata Boulevard West (PID: 3211823140002) Interim Use Permit – Public Hearing Background The applicant requests an Interim Use Permit (IUP) to utilize an approximately five (5) acre portion of a 25.8-acre parcel at 3245 Wayzata Boulevard West for staging and storage to support a utility fiber project. The applicant requests the duration of this IUP to run through the end of December 2026. The materials to be stored on the property will be reels of conduit and fiber, storage containers for smaller equipment, and trash containers. The use of the property will be during the hours of 7AM and 7PM, with the applicant and its contractor accessing the site with a rock construction entrance to pick up and deliver materials as needed. The applicant intends to begin staging the site following approval of the IUP and will install erosion control measures to address the open working areas on the site. The applicant has indicated the area subject to the IUP will be adequately maintained and will be reverted to its present conditions with vegetation at the end of the IUP’s timeline. Interim Use Permit Analysis The property is zoned RR-1B, which requires an IUP for temporary facilities for construction staging, materials, and equipment storage when such facilities are associated with public rights-of-way. This proposed an IUP supports the proposed fiber installation project within the public rights-of-way within the City. Per Section 78-421 of the City Code: Temporary facilities for construction staging, materials and equipment storage, and materials recycling, when such facilities are associated with adjacent public road construction or reconstruction projects in the City of Orono. a) Time limit—The facility must be completely removed and the site returned to its original state or better within six months of project completion. Based on the timing provided by the applicant, the site would need to be returned to its original state by the end of June 2027. b) Applicant shall submit plans indicating the site layout, scheduling and timing of the use, and the routes for trucks hauling materials to and from the site. The applicant submitted a site plan showing the general layout of the staging and storage operations on the site, as well as operating hours for site access. Hauling routes were not provided with the application. Application Summary: The applicant requests an interim use permit for equipment storage and staging associated with a utility project in public rights-of-way. Staff Recommendation: Planning Staff recommends approval. 72 FILE # LA25-000009 17 March 2025 Page 2 of 5 c) Applicant shall adhere to all city and other agency requirements for site and adjacent road maintenance, and traffic control measures. The applicant has coordinated with Orono Public Works prior to applying and will be in touch with Hennepin County regarding the site access with Wayzata Boulevard West. Interim Use Permit (Sections 78-916 and 78-1747) On the basis of the application and the evidence submitted, the city must find that the proposed use at the proposed location is or will be (78-916): 1) Consistent with the community management plan: The project supports the growth of telecommunication access in the City, an aspect that is consistent with the Plan. This criterion is met. 2) Compliant with the zoning code, including any conditions imposed on specific uses as required by article V, division III of the City Code: Staff finds the proposed interim use is compliant with the zoning code and is not subject to conditions by Article V, Division III of the City Code. 3) Adequately served by police, fire, roads, and stormwater management: The property meets this standard. This criterion is met. 4) Provided with an adequate water supply and sewage disposal system: As existing vacant land, the property does not have a water supply or sewage disposal, but the interim use of equipment storage and staging does not require water or sanitation access. This criterion is met. 5) Not expected to generate excessive demand for public services at public cost: This proposal is not anticipated to impact public services. This criterion is met. 6) Compatible with the surrounding area as the area is used both presently and as it is planned to be used in the future: Much of the area that was not impacted by the development of roads, is vacant land. The property in the past has provided staging and storage for the construction of US Highway 12. Upon culmination of the interim use, the property can be contemplated for future development coincidental to the Plan. This criterion is met. 7) Consistent with the character of the surrounding area, unless a change of character is called for in the community management plan: The proposed use is not necessarily consistent with the character of the surrounding area, but is temporary in nature, and should not affect the long-term character of this area. This criterion is met. 8) Compatible with the character of buildings and site improvements in the surrounding area, unless a change of character is called for in the community management plan: The area is comprised of vacant land or wetlands, with limited site improvements. The proposed temporary staging and storage is adequately screened should not impact the character of other improvements in the area. This criterion is met. 73 FILE # LA25-000009 17 March 2025 Page 3 of 5 9) Not expected to substantially impair the use and enjoyment of the property in the area or have a materially adverse impact on the property values in the area when compared to the impairment or impact of generally permitted uses: The interim use is not anticipated to impact the use or enjoyment of property in the area. This criterion is met. 10) Provided with screening and buffering adequate to mitigate undesirable views and activities likely to disturb surrounding uses: The area of the subject property where the interim use will occur has tree cover and/or large grades to screen all sides of the property from undesirable views and activities. This criterion is met. 11) Not create a nuisance which generates smoke, noise, glare, vibration, odors, fumes, dust, electrical interference, general unsightliness, or other means: The proposal is not anticipated to create a nuisance, given the existing conditions of the property with its location between two major thoroughfares and with adequate vegetative screening on-site. This criterion is met. 12) Not cause excessive non-residential traffic on residential streets, parking needs that cause a demonstrable inconvenience to adjoining properties, traffic congestion, or unsafe access: The proposal is not anticipated to create excessive traffic burdens on the nearby road network. Wayzata Boulevard West is a minor arterial county road that has the capacity to serve this use. This criterion is met. 13) Designed to take into account the natural, scenic, and historic features of the area and to minimize environmental impact: The property has wetland areas in various areas. The applicant has proposed the interim use to occur in an environmentally sensitive location, outside of the wetland areas of the property. This criterion is met. 14) All exterior lighting shall be so directed so as not to cast glare toward or onto the public right-of- way or neighboring residential uses or districts: The proposal does not include the installation of any exterior lighting. This criterion is met. 15) Not detrimental to the public health, public safety, or general welfare: Staff finds the proposal does not come at a detriment to the public health, safety, or welfare of residents and landowners of the City of Orono. No interim use permit may be granted unless the city council determines that the use will comply with the following (78-1747): 1) The use is allowed as an interim use in the applicable zoning district: The staging and storage of materials for a utility project within public rights-of-way in the City of Orono is allowed as an interim use in RR-1B zoning district. This criterion is met. 2) The use will not delay anticipated development or redevelopment of the site: The portion of the site to be used will not delay the current or future development of the vacant site. This criterion is met. 3) The use will not be in conflict with any provisions of the City Code on an ongoing basis: 74 FILE # LA25-000009 17 March 2025 Page 4 of 5 Staff finds the proposed use does not create a conflict with the City Code. This criterion is met. 4) The use will not adversely affect the adjacent property, the surrounding neighborhood, or other uses on the property where the use will be located: The proposed use is not anticipated to adversely affect the adjacent area. Only five (5) acres of the 25.8-acre property will be utilized, and existing conditions indicate this area will be adequately buffered from other properties and uses by distance and vegetation. The applicant proposes limited working hours for the site consistent with the construction hour limitations identified in the City Code. The site has considerable tree cover and is located directly between US Highway 12 and Wayzata Boulevard West. This criterion is met. 5) The use will not impose additional unreasonable costs on the public: The interim use will not impose additional costs on the public. No public improvements or utility demands are necessary for the proposed use. This criterion is met. 6) The date or event that will terminate the use can be identified with certainty: The applicant has indicated that the staging and storage use will cease in December 2026 at conclusion of the utility installation project. The site will be resorted to existing grades and will be vegetated. This criterion is met. 7) The applicant agrees in writing to any conditions that the city council deems appropriate for the use, including a requirement for a financial security to ensure removal of all evidence of the use upon termination, and restoration of the site to prior or better conditions. The conditions shall be set forth in a development agreement between the property owner and the city, which agreement shall be recorded with the Hennepin County Recorder or Register of Deeds: Approval of the Interim Use Permit will be executed through a signed and recorded resolution. All requirements for the use and conditions of approval will be stated within the resolution. This criterion is met. The Commission may recommend or Council may impose conditions in granting of an IUP. Any conditions imposed must be directly related to and must bear a rough proportionality to the impact created by the IUP. Public Comments The City has not received any public comments regarding the application. Planning Staff Recommendation Staff recommends approval of the Interim Use Permit for equipment storage and staging associated with a utility project in public rights-of-way, subject to the following conditions: 1) The interim use permit will be active until the end of December 2026, as requested by the applicant. 2) The applicant shall ensure all other permits for other governmental agencies are obtained prior to commencing work on the site, this includes Hennepin County and Minnehaha Creek Watershed District. 75 FILE # LA25-000009 17 March 2025 Page 5 of 5 List of Exhibits Exhibit A. Staff Report Exhibit B. Application Exhibit C. Cover Letter Exhibit D. Site Plan Exhibit E. Aerial Imagery Exhibit F. Property Survey Exhibit G. Mailing List & Map 76 Land Use Application Summary Application Date:02/18/2025 Address:3245 Wayzata Boulevard West Orono, MN 55356 Parcel Number:3211823140001 Land Use Number:LA25-000009 Application Submitted By: Owner:Name: LAKEWEST LLC Address: 14525 HIGHWAY 7 #265MINNEONKA MN 55345 Applicant:Name: Ryan Barr Company: Midco Address: 4020 W. Cayman St Sioux Falls, SD 57107 ryan.barr@midco.com Contact Information:Associated Contact: Associated Contact: Associated Contact: Associated Contact: Project Description:Material Storage area for Midco Land Use Application Type:Amendmend Application Appeal of Admin Decision Concept Application Conditional Use Permit Site Plan Application Subdivision Application Subdivision Exception Vacation Application Variance Application Applicant Signature: 77 February 26, 2025 City of Orono 2750 Kelley Parkway Orono MN 55356 Re: Interim Use Permit Application for 3245 Wayzata Blvd West Midcontinent Communications (Midco) is requesting an Interim Use Permit (IUP) from the City of Orono to use a portion of the property located at 3245 Wayzata Blvd W for staging and material storage related to our fiber telecommunications build. Midco plans to use this property to store materials which will include reels of conduit and fiber, approximately ten 40’ storage containers to house smaller materials, and two dumpsters to contain waste. Midco will not have any contaminants related to this project on the property. Our plan is to use approximately five acres of this property as shown in red on the attached map. We will have no impact on the adjacent wetlands. We request to utilize this property beginning March 2025 through December 2026. All activity at this site will take place between the hours of 7:00AM and 7:00PM. There will be daily stops to this location by Midco staff and Midco’s hired contractors to pick up materials. Midco will bring in rock/gravel at the beginning of this project to minimize the impact of our vehicles on adjacent roadways. We will install silt fencing around the area that will be used to stage our project. Our storage containers will be locked every night and the entrance will be blocked off at the end of each day. We will maintain the property throughout the project and return it to its original state at the end of our lease agreement. Thank you for your prompt consideration for this permit. Please contact me if you should require any additional information or clarification. Ryan Barr Project Manager 605-201-9584 Ryan.Barr@Midco.com 78 Responses to Interim Use Criteria: a. The use will meet the general performance standards in section 78-916 of this chapter: Yes, it will meet the general performance standards. b. The use is allowed as an interim use in the applicable zoning district: This proposed interim use is allowed in the property’s zoning district. c. The use will not delay anticipated development or redevelopment of the site: No, we have a lease agreement with the property owner. d. The use will not be in conflict with any provisions of the City Code on an ongoing basis: No, this will not conflict with any city code provisions. e. The use will not adversely affect the adjacent property, the surrounding neighborhood, or other uses on the property where the use will be located: No, this will not affect any neighbors, the work will be conducted inside of the city of Orono established hours of 7am to 8pm, Monday through Friday. f. The use will not impose additional unreasonable costs on the public: No cost to the public. g. The date or event that will terminate the use can be identified with certainty: This lease agreement with the property owner will be till the end of December 2026. h. The applicant agrees in writing to any conditions that the city council deems appropriate for the use, including a requirement for a financial security to ensure removal of all evidence of the use upon termination, and restoration of the site to prior or better conditions. The conditions shall be set forth in a development agreement between the property owner and the city, which agreement shall be recorded with the Hennepin County Recorder or Registrar of Deeds: We agree to putting the proposed area back to the original condition upon completion of the project. 79 Outside Storage AreaOutside Storage AreaC o n t a i n e r s Trailers/VehiclesDumpsters/BiffOutside Storage 80 10121010 100 810061008 1006100410021000998996 1000 994 992 990 988 986 984 982980 978 976 1 0 0 8 1006 1004 1002 10 0 0 99 8 996994992 990988986984982980978976974982 98498698 8 988992990988986984982980978976974 988986984982978976980S 01°05'38" W 1232.50393.24N 88°54'22" W 418.00 50.00N 01°05'38" E 392.08S 89°04'24" E 418.0050.00S 89°03'53" E 418.00 789.26N 4 8 ° 3 2 ' 1 8 " W 2 1 3 . 0 6N 00°17'00" E 538.0050.00488.00West line of Gov't Lot 1, Sec. 32-118-23 based on MC 13 being lost West line of Gov't Lot 1, Sec. 32-118-23 based on MC 13 being perpetuatedN 00°26'51" W90\179WAYZATA BLVD TELEPHONE CABLE POST Remains of old fence S 89°03'53" E 1374.07 FOUND MnDOT MONUMENT NOTE: ACCESS CONTROL BY MnDOT 12" LINDEN 10" BLACK OAK 12" LINDEN 14" BLACK OAK 14" SCOTCH PINE 14" LINDEN 28" WHITE OAK 28" BLACK OAK 22" MAPLE 22" OAK 20" MAPLE 10" LINDEN 24" MAPLE 20" SOFT MAPLE 10" SOFT MAPLE 14" SOFT MAPLE10" SOFT MAPLE 12" SOFT MAPLE 14" SPRUCE 12" SOFT MAPLE 10" WHITE OAK 10" SPRUCE 20" SOFT MAPLE 10" SPRUCE20" SOFT MAPLE 20" SOFT MAPLE 18" SOFT MAPLE 40" LINDEN 18" WHITE PINE 10" SPRUCE 28" LINDEN 28" BLACK OAK 12" BLACK WALNUT 12" BLACK WALNUT 12" BLACK WALNUT 12" ASH 10" SPRUCE 24" ASH 16" SPRUCE16" SPRUCE 22" SCOTCH PINE 20" SPRUCE 22" SCOTCH PINE 12" SPRUCE 18" SPRUCE 20" SPRUCE 22" SCOTCH PINE10" ELM 16" SPRUCE16" SPRUCE 28" ASH10" BLACK WALNUT 22" MAPLE 10" BLACK WALNUT 28" MAPLE 10" ASH 10" MAPLE 10" RED PINE 12" RED PINE 12" RED PINE 14" ASH 10" APPLE 14" ASH 14" ASH 12" SPRUCE ELM CLUMP 14" ELM 14" WHITE PINE 14" WHITE PINE 16" WHITE PINE 3-18" WHITE PINES14" RED PINE10" ASH10" ASH 12" ASH 14" BLACK WALNUT 12" BLACK WALNUT 12" BLACK WALNUT 18" ASH14" MAPLE 10" LOCUST 20" LOCUST 26" MAPLE 18" HACK- BERRY 22" SILVER MAPLE 24" SILVER MAPLE 24" ASH 30" ELM28" LINDEN 28" BLACK OAK 24" LINDEN12" SPRUCE 12" SPRUCE 12" SPRUCE 16" ASH 16" LINDEN 20" LINDEN 10" BLACK WALNUT 10" BOX ELDER 12X14" LINDEN 10X14" LINDEN 12" LINDEN 10" HACKBERRY 28" LINDEN 10X12" ASH 16" ASH 12" ASH 28" BLACK OAK 12" SPRUCE 12" BLACK WALNUT EXISTING HOUSE EXISTING GARAGE GRAVEL DRIVEWAY ROCK WALLROCK WALL RED PINEGROVEU. S . H I G H W A Y N O . 1 2 WETLAND 2 (MANAGE 1) WETLAND 1 (MANAGE 2)File Location: X:\4000330-00\001\40 Design\00 Sheets - Mass Grading\DEMOLITION-MG.dwg Plotted By: Ben Palazzolo on June 19, 2024 at 12:14:53 PMKnow what's below. Call before you dig. R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N 0 SCALE IN FEET 25 50 100 N W S E CITY SUBMITTAL2024-06-193 13ORONO, MINNESOTAMASS GRADINGEISINGER MEADOWS - MASS GRADINGDEMOLITION PLAN - VIEW Awww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.: Drafted By: Designed By: Sheet of MARK RAUSCH 43480 MPR BJP 4000330-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Civil Engineer under the laws of the State of MINNESOTA. 3 13 LEGEND: C O N T A I N E R SDumpsters/BiffOutside StorageOutside StorageTrailers/VehiclesOutside Storage 81 WAYZATA BLVD TELEPHONE CABLE POST U. S . H I G H W A Y N O . 1 2 WETLAND 2 (MANAGE 1) WETLAND 1 (MANAGE 2)File Location: X:\4000330-00\001\40 Design\00 Sheets - Mass Grading\WETLAND-MG.dwg Plotted By: Ben Palazzolo on June 19, 2024 at 12:15:30 PMKnow what's below. Call before you dig. R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N 0 SCALE IN FEET 40 80 160 N W S E CITY SUBMITTAL2024-06-199 13ORONO, MINNESOTAMASS GRADINGEISINGER MEADOWS - MASS GRADINGWETLAND MANAGEMENT PLANwww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.: Drafted By: Designed By: Sheet of MARK RAUSCH 43480 MPR BJP 4000330-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Civil Engineer under the laws of the State of MINNESOTA. 9 13 WETLAND SUMMARY WETLAND BUFFER CALCULATION LEGEND:Dumpsters/BiffC O N T A I N E R SOutside StorageOutside Storage Outside StorageTrailers/Vehicles82 Exhibit E – Aerial Imagery of 3245 Wayzata Boulevard West 83 84 85 Hennepin County Locate & Notify Map 3245 Wayzata Bld W 0 410 820205 Feet Date: 2/21/2025 Buffer Size:500 Map Comments: This data (i) is furnished 'AS IS' with no representation as to completeness or accuracy; (ii) is furnished with no warranty of any kind; and (iii) is notsuitable for legal, engineering or surveying purposes. Hennepin County shall not be liable for any damage, injury or loss resulting from this data. For more information, contact Hennepin County GIS Office 300 6th Street South, Minneapolis, MN 55487 / gis.info@hennepin.us 86 38 32-118-23 11 0001 BARBARA LUPIENT C/O LUPIENT AUTOMOTIVE GRP 7100 WAYZATA BLVD #200 GOLDEN VALLEY MN 55426 38 32-118-23 14 0001 LAKEWEST LLC 14525 HIGHWAY 7 #265 MINNEONKA MN 55345 38 32-118-23 14 0002 LAKEWEST LLC 14525 HIGHWAY 7 #265 MINNEONKA MN 55345 38 33-118-23 22 0001 BARBARA LUPIENT C/O LUPIENT AUTOMOTIVE GRP 7100 WAYZATA BLVD #200 GOLDEN VALLEY MN 55426 38 33-118-23 23 0002 KATHRYN DUMAS ROBERT DUMAS 3025 WAYZATA BLVD BOX 607 LONG LAKE MN 55356 87 Date: March 17, 2025 Item: 5.3 Presenter: Laura Oakden, Community Development Director Section: Public Hearings Title: LA25-000002, City of Orono Text Amendment: City Code Section 78- 1279(6) - Average Lakeshore Setback (Laura Oakden) 1.Purpose: The City of Orono proposes an amendment to Zoning Code Section 78-1279 regarding average lakeshore setback and to fix typographic errors. 2.Background: The Average Lakeshore Setback (ALS) standards are within the Shoreland Overlay District regulations. The purpose of the ALS regulation is to protect views of the lake or sightlines to the lake over a subject property. The code attempts to describe a setback line based on the location of the existing principal residence buildings on neighboring lakeshore lots. The ALS prohibits buildings (principal and accessory) and certain accessory structures from being located lakeward of this setback line as defined. It is not uncommon for regulations to be amended or modified over time. The ALS code language has been amended numerous times since its adoption with the Shoreland Overlay District Regulations in 1992 to clarify terms and/or to add exceptions (including the above-noted 42-inch exception) from the standard. As a result of a recent amendment there is a typo in the language which creates confusion. Staff proposes amendments to clarify the language (rearranging text), update references to other sections of the code, and correct the typo; no change in the purpose or application of the regulation is proposed. The proposed changes are intended to make the text easier to understand and apply. 3.Public Comment: No public comments have been received. The proposed code language was sent to the DNR for their review and approval; a Conditional Approval letter from the DNR is attached as an exhibit. 4.Staff Recommendation: Planning Department Staff recommends approval. 5.Planning Commission Action Requested: Review the proposed text and make a MOTION to approve the proposed text amendment to the Average Lakeshore Setback. AGENDA ITEM Exhibits Ex A LA25-000002, TA, ALS, PCSR Ex B Draft Changes 78-1279 Ex C Draft Changes 78-1279 CLEAN (no strikethrough) Ex D DNR Conditional Approval 88 To:Chair Bollis and Planning Commission Members Adam Edwards, City Administrator From:Laura Oakden, Community Development Director Date:March 17, 2025 Subject:LA25-000002, City of Orono Text Amendment: City Code Section 78-1279(6) - Average Lakeshore Setback Background The Average Lakeshore Setback (ALS) standards are within the Shoreland Overlay District regulations. The purpose of the ALS regulation is to protect views of the lake or sightlines to the lake over a subject property. The code attempts to describe a setback line based on the location of the existing principal residence buildings on neighboring lakeshore lots. The ALS prohibits buildings (principal and accessory) and certain accessory structures from being located lakeward of this setback line as defined. “Buildings” and “structures” are defined in Section 78-1 of the Zoning Code as follows: Building means any structure having a roof which may provide shelter or enclosure of persons, animals or chattel; and when the structure is divided by party walls without opening, each portion of such building so separated shall be deemed a separate building. Structure means anything which is built, constructed or erected, an edifice or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner, which requires a location on, below or above the ground, land or water, or attached to something having a location on the ground, land or water. The ALS code language also outlines exceptions for accessory structures that do not exceed 42 inches in height (measured from existing grade) as these improvements are low/at grade and do not impact lake sightlines (i.e. pools, patios, retaining walls). It is not uncommon for regulations to be amended or modified over time. The ALS code language has been amended numerous times since its adoption with the Shoreland Overlay District Regulations in 1992 to clarify terms and/or to add exceptions (including the above-noted 42-inch exception) from the standard. As a result of a recent amendment there is a typo in the language which creates confusion. At this time, staff proposes amendments to clarify the language (rearranging text), update references to other sections of the code, and correct the typo; no change in the purpose or application of the regulation is proposed. The proposed changes are intended to make the text easier to understand and apply. Public Comments No public comments have been received. The proposed code language was sent to the DNR for their review and approval; a Conditional Approval letter from the DNR is attached as an exhibit. Application Summary: The City of Orono proposes an amendment to Zoning Code Section 78- 1279 regarding average lakeshore setback and to fix typographic errors. Staff Recommendation: Planning Department Staff recommends approval. 89 LA24-000064 March 17, 2025 Page 2 of 2 Issues for Consideration 1. Are there any issues or concerns with this proposal? Planning Staff Recommendation Planning Staff recommends approval of the amendment as drafted. 90 Created: 2025-01-06 08:14:37 [EST] (Supp. No. 21, Update 4) Page 1 of 1 Sec. 78-1279. Placement of buildings and structures on lots. (6) Average lakeshore setback. The average lakeshore setback line shall be a straight line connecting the most lakeward protrusions of the principal buildings on the immediately adjacent lakeshore lots over the subject lakeshore lot. No principal or accessory building or accessory structure shall be located closer to the Ordinary High Water Line (OHWL) on a lakeshore lot than the average distance from the shoreline of existing principal buildings on adjacent lots lakeshore setback line;. This does not apply to patios and other accessory structures less than 42 inches above existing grade ;, and/or stairways, lifts, landings (as regulated under Section 78-1282); or, lockboxes, flagpoles, and pump houses (defined as water-oriented accessory structures in Section 78-1281). Further, the average lakeshore setback shall apply only to classified lakes and shall not apply to tributaries. The average lakeshore setback line shall be a straight line connecting the most lakeward protrusions of the principal buildings on the immediately adjacent lakeshore lots. a. In situations where improvement is proposed on a lot adjacent to a vacant lot or right -of-way, the average lake shorelakeshore setback shall be equivalent to the setback of the most lakeward protrusion of the principal building on the immediately adjacent improved lakeshore lot. b. In situations where the average lake shorelakeshore setback line bisects the principal building located on either of the adjacent lakeshore lots, the next most adjacent lake side point of the bisected principal building shall be used for to determineing the average lakeshore setback. If the adjusted line continues to bisect the principal building, the next, most lakeside point of that principal building is toshall be used until the setback line does not bisect the principal buildings on either of the an adjacent lakeshore lots. 91 CLEAN VERSION Average lakeshore setback.The average lakeshore setback line shall be a straight line connecting the most lakeward protrusions of the principal buildings on the immediately adjacent lakeshore lots over the subject lakeshore lot. No principal or accessory building or accessory structure shall be located closer to the Ordinary High Water Line (OHWL) on a lakeshore lot than the average lakeshore setback line. This does not apply to patios and other accessory structures less than 42 inches above existing grade; stairways, lifts, landings (as regulated under Section 78-1282); or lockboxes, flagpoles, and pump houses (defined as water-oriented accessory structures in Section 78-1281). Further, the average lakeshore setback shall apply only to classified lakes and shall not apply to tributaries. a.In situations where improvement is proposed on a lot adjacent to a vacant lot or right-of-way, the average lakeshore setback shall be equivalent to the setback of the most lakeward protrusion of the principal building on the immediately adjacent improved lakeshore lot. b.In situations where the average lakeshore setback line bisects the principal building located on either of the adjacent lakeshore lots, the next most adjacent lakeside point of the bisected principal building shall be used to determine the average lakeshore setback. If the adjusted line continues to bisect the principal building, the next, most lakeside point of that principal building shall be used until the setback line does not bisect the principal buildings on either of the adjacent lakeshore lots. 92 1801 South Oak Street Lake City, MN 55041 February 26, 2025 Laura Oakden Community Development Director City of Orono 2750 Kelley Parkway Orono, MN 55356 Re: Conditional Approval of City of Orono Shoreland Ordinance Amendment Dear Laura Oakden: Thank you for sending your proposed shoreland ordinance amendment to the DNR for conditional approval review. I am pleased to inform you that the proposed amendment is substantially compliant with the statewide rules (MR 6120.2500 – 6120.3900) and hereby approved, provided the conditions of approval in this letter are met. Ordinance Evaluation We have reviewed the following section you propose to amend, which was received on February 24, 2025, for compliance with state shoreland rules. Our conditional approval only applies to the specific sections listed below. • Section 78-1279 The proposed amendment is attached. Conditions of Approval The following conditions must be met before the DNR will issue final approval: 1. Return the attached “Ordinance Processing Checklist” and documents identified on the checklist. Next Steps Following are the steps for completing and receiving final DNR approval for your amendment: 1. The city council adopts the amendment. 2. Email the completed Ordinance Processing Checklist (attached) and the documents identified on the checklist within 10 days of city council adoption to: a. northmetroareahydro.dnr@state.mn.us b. Ordinance.review.dnr@state.mn.us 93 3. We will review the amendment adopted by the city council for consistency with the above conditions. 4.If the adopted amendments are consistent with the conditions, I will send you a “final approval” letter. State rules require DNR final approval of shoreland ordinances and amendments for those ordinances to be effective. A shoreland ordinance is an important land use regulation that helps to protect surface water quality, near-shore habitat, and the scenic character of Minnesota’s public waters. We appreciate your efforts to protect these resources for all present and future Minnesotans. Sincerely, Megan Moore District Manager Attachments: Proposed Ordinance with DNR comments Ordinance Processing Checklist c: Dan Scollan, DNR Area Hydrologist northmetroareahydro.dnr@state.mn.us Ordinance.review.dnr@state.mn.us 94           Created: 2025‐01‐06 08:14:37 [EST]  (Supp. No. 21, Update 4)    Page 1 of 2  Sec. 78‐1279. Placement of buildings and structures on lots.  When more than one setback applies to a site, buildings, structures, and facilities must be located to meet all  setbacks. Buildings and structures shall be located as follows:   (1) Building, structure, and on‐site sewerage system setbacks (in feet) from ordinary high water level:   Public Water  Classification   Setbacks   Building/Structure  Sewage Treatment  System  Unsewered  Sewered   NE  150  150  150   RD  100  75  75   GD  75  75  75   Tributary  100  75  75     (2) Additional building and structure setbacks. The following additional setbacks apply, regardless of the  classification of the water body:    Setback from:  Setback   (in feet)   Top of bluff  30   Unplatted cemetery  50   Right‐of‐way line of federal, state or county highway and local public and  private roads   30*     * Except for accessory buildings on lakeshore lots as regulated in this chapter and except for buildings  and structures subject to less restrictive side yard adjacent to street setbacks as regulated in the  various zoning districts.   (3) Bluff impact zones. Buildings, structures and accessory facilities, except stairways, landings and lock  boxes, must not be placed within bluff impact zones.   (4) Uses without water‐oriented needs. Uses without water‐oriented needs must be located on lots or  parcels without public waters frontage, or, if located on lots or parcels with public waters frontage,  must either be set back double the normal ordinary high water level setback or be substantially  screened from view from the water by vegetation or topography, assuming summer, leaf‐on  conditions.   (5) Fences, docks, retaining walls. No fence shall be placed within the Shore Setback zone. Portions of dock  located landward of the OHWL shall be considered as a landing, subject to the regulations for landings  per section 78‐1282. Retaining walls within the Shore Setback zone may be permitted according to the  following:   a. A retaining wall may be constructed within the shore setback zone if it is an integral part of a  permitted lake access stair and the retaining wall is designed to be the minimum size necessary.   b. A replacement retaining wall, including a change in material, may be permitted within the shore  setback zone when all of the following conditions are met:   1. The wall is under four feet in height, and in the same location, and   2. The existing wall shows signs of failure.   95           Created: 2025‐01‐06 08:14:37 [EST]  (Supp. No. 21, Update 4)    Page 2 of 2  c. A wall within a defined bluff and bluff setback; and/or a replacement wall four feet in height or  greater; and/or any new walls shall require a conditional use permit. New walls and replacement  walls greater than four feet in height must meet the following conditions. The wall must be:   1. Designed to correct an established erosion problem; and   2. Suitable given the demonstrated need; and   3. Designed by a registered engineer or landscape architect, depending on project scope; and   4. Designed to be the minimum size necessary to control the erosion problem.   (6) Average lakeshore setback. The average lakeshore setback line shall be a straight line connecting the  most lakeward protrusions of the principal buildings on the immediately adjacent lakeshore lots over  the subject lakeshore lot. No principal or accessory building or accessory structure shall be located  closer to the Ordinary High Water Line (OHWL) on a lakeshore lot than the average distance from the  shoreline of existing principal buildings on adjacent lotslakeshore setback line;. This does not apply to  patios and other accessory structures less than 42 inches above existing grade;, and/or stairways, lifts,  landings (as regulated under Section 78‐1282); or, lockboxes, flagpoles, and pump houses (defined as  water‐oriented accessory structures in Section 78‐1281). Further, the average lakeshore setback shall  apply only to classified lakes and shall not apply to tributaries. The average lakeshore setback line shall  be a straight line connecting the most lakeward protrusions of the principal buildings on the  immediately adjacent lakeshore lots.   a. In situations where improvement is proposed on a lot adjacent to a vacant lot or right‐of‐way,  the average lake shorelakeshore setback shall be equivalent to the setback of the most lakeward  protrusion of the principal building on the immediately adjacent improved lakeshore lot.   b. In situations where the average lake shorelakeshore setback line bisects the principal building  located on either of the adjacent lakeshore lots, the next most adjacent lake side point of the  bisected principal building shall be used for to determineing the average lakeshore setback. If the  adjusted line continues to bisect the principal building, the next, most lakeside point of that  principal building is toshall be used until the setback line does not bisect the principal buildings  on either of the an adjacent lakeshore lots.     96 Revised: 8/02/24 ORDINANCE PROCESSING CHECKLIST After ordinance or amendment adoption, please complete, sign, and return this checklist with the listed documents by email to the DNR at Ordinance.review.dnr@state.mn.us 1. Date(s) of public hearing(s). Attach the notice(s) with this checklist in PDF format. ____________ ____________ 2. Date of ordinance adoption. Attach the adopted ordinance or amendment signed by the chief elected official in PDF format. ____________ Do not include newspaper documentation of summary publications for the ordinance/amendment or of public hearings. _______________________________________________ Signature of Clerk/Zoning Administrator _______________________________________________ Name of Community 97 Date: March 17, 2025 Item: 6.1 Presenter: Laura Oakden, Community Development Director Section: Old Business Title: LA24-000054, Rob Page, 430 Old Crystal Bay Road North, Conditional Use Permit, Preliminary Plat, and Site Plan Review (Laura Oakden) 1.Purpose: The applicant is requesting a Conditional Use Permit, Preliminary Plat approval, and Site Plan approval for an eighty-five (85) unit Garage Condo development. 2.MN§15.99 Application Deadline: The applicant made a complete application on January 9, 2025. The initial 60-day review period has been extended resulting in a review deadline of May 5, 2025 3.Background: The Applicant requested approval for a new Garage Condo business development on the subject property. The proposed Garage Condo development take will access off of the new Orono Industrial Boulevard on the north side of the parcel. The project is proposed as a condominium format with the Developer/HOA owning the land and the units will be individually-owned for the personal use of each owner. The common spaces on the property will be managed by an association which will provide for general maintenance and stormwater drainage of the site determined by the applicant. The development will not have a customer-facing/retail. The applicant noted that the development would not have employees, but they may utilize a space for unit sales while under construction. The applicant also notes the site will operate with estimated business hours between 6 am-10 pm seven days a week. The site will be secured with a fence and gate. The Planning Commission reviewed the applicant’s request at the February 18, 2025 Planning Commission meeting (Video and Staff Report) where a public hearing was held. Two letters from the public were submitted for review; there were no public comments during the meeting. The Commission discussed the proposal and requested additional information about the use of the site, maneuverability plan, parking plan, timeline, and construction phasing. The project was ultimately tabled and the Commission directed the applicant to provide updated information addressing several issues. The applicant provided updated or additional information for review at the March Planning Commission meeting, including photos of other garage condos in the Twin Cities area for comparison, narrative, construction plans, civil plans, renderings and a traffic study for the site. 4.Public Comment: Staff have received comments from two members of the public that were included in the February 18, 2025 Planning Commission packet and are attached herein as exhibits. No other comments have been submitted to staff. 5.Staff Recommendation: AGENDA ITEM 98 Planning Department Staff recommends approval with the identified conditions. 6.Planning Commission Action Requested: The Planning Commission should consider a motion to APPROVE the application including the following conditions: 1. Approval of the CUP will be conditioned upon preliminary and final plat approval. 2. All permitting from MCWD and other agencies must be obtained prior to issuance of building permits. 3. Changes to or intensification of the use may trigger additional council review and approval. 4. All City Staff comments must be addressed prior to placement on the City Council’s agenda for final plat review. 5. The hours of operation for the site are set as 6 am- 10 pm 7-days a week. 6. The premises shall not be used or customized for residential living purposes or community gatherings or events. Events in this context means: outdoor activities on the property, such as promotional events, gatherings, demonstrations, displays or other activities which affect any easement or use right, obstruct driveways, access roads, or Common Elements. Exhibits Ex A Staff Report LA24-000068, 430 CBR Ex B Regulation Analysis 031725 Ex C Application Ex D Project Narrative Ex E Declaration for Orono Garage Condos Ex F Civil and Structural Plan Sets Ex G Survey and Proposed CIC Preliminary Plat Ex H Trip Generation Memo Ex I Maneuverability and Circulation Plan Ex J Picture and Examples Ex K Landscape Plan Ex L Site Renderings Ex M Exhistin Aerial Images Ex N Staff Review and Comments Ex O Public Comments 020825 99 Date Application Received: 12/12/2024 Date Application Considered as Complete: 01/09/2025 120-Day Review Period Expires: 05/09/2025 To:Chris Bollis and Planning Commission Members Adam Edwards, City Administrator From:Laura Oakden, Community Development Director Date:March 17, 2025 Subject:LA24-000054, Rob Page, 430 Old Crystal Bay Road North, Conditional Use Permit, Preliminary Plat, and Site Plan Review Review #2 Background - Review The Applicant requested approval for a new Garage Condo business development on the subject property. The proposed Garage Condo development will access off of the new Orono Industrial Boulevard on the north side of the parcel. There are residential properties to the west of the site across Old Crystal Bay Road North and other industrially-zoned properties directly to the north and east of the property. The applicant submitted a narrative describing the proposed 85 unit Garage Condo development. The units will be sized between 750-1450 square feet for garage storage. The project is proposed as a condominium format with the Developer/HOA owning the land and the units will be individually-owned for the personal use of each owner. Each unit is designed to have utility connections for water and sewer and can be customized to include additional amenities such as bathrooms, kitchens, and/or washers/dryers. The common spaces on the property will be managed by an association which will provide for general maintenance and stormwater drainage of the site determined by the applicant. The development will not have a customer-facing/retail. The applicant noted that the development would not have employees, but they may utilize a space for unit sales while under construction. The applicant also notes the site will operate with estimated business hours between 6 am-10 pm seven days a week. The site will be secured with a fence and gate. The Planning Commission reviewed the applicant’s request at the February 18, 2025 Planning Commission meeting where a public hearing was held. Two letters from the public were submitted for review; there were no public comments during the meeting. The Commission discussed the proposal and requested additional information about the use of the site, maneuverability plan, parking plan, timeline, and construction phasing. The project was ultimately tabled and the Commission directed the applicant to provide updated information addressing several issues. The applicant provided updated or additional information for review at the March Planning Commission meeting, including photos of other garage condos in the Twin Cities area for comparison, construction plans, civil plans, renderings and a traffic study for the site. 1. Planning Commission requested more detail regarding the proposed Covenants. The developer provided updated Covenants/revised Declaration language, attached as Exhibit specifying the following (the developer’s responses are in italics): Application Summary: The applicant is requesting a Conditional Use Permit, Preliminary Plat approval, and Site Plan approval for an eighty-five (85) unit Garage Condo development. Staff Recommendation: Planning Department Staff recommends approval. 100 FILE #LA24-000068 March 17, 2025 Page 2 of 4 a. Hours of operation:6am to 10pm. b. Provide a definition for “Event”: The HOA declaration prohibits any kind of event, gathering, etc. Definition of “event”: Outdoor activities on the Property, such as promotional events, gatherings, demonstrations, displays or other activities which have the potential to materially affect any easement or use rights, cause a nuisance or material disturbance, create a safety or health hazard, create material liability for the Association or any Member, obstruct driveways, access roads, or Common Elements, and otherwise violate any provisions of this Declaration or the Association’s Rules and Regulations shall be prohibited. Staff comment: The above definition of “Event” and appropriate conditions should be incorporated into the Conditional Use Permit so that the City. c. Clarification on “Occupancy” load/number or limitations on the number of individuals allowed within each unit at one time: The occupancy of the building will be determined by the State, building code. The Certificate of Occupancy will be issued once the building is complete. The fire code limits number of individuals permitted in the units following the state fire code. Additionally, the HOA covenants expands on the occupancy for the units. HOA Declaration: The maximum occupancy of each Unit shall be determined in accordance with applicable building, fire, and safety codes as established by the City of Orono or other governing authorities. Owners are responsible for ensuring compliance with these limits, and the Association reserves the right to enforce occupancy restrictions as necessary to maintain safety and compliance with local regulations. Specifically, the Code Diagrams in the architectural drawings specify that the: - 20’x40’ units shall have a maximum occupancy of 3, - 24’x46’ units shall have a maximum occupancy of 4, and - 31’x46’ units shall have a maximum occupancy of 5 Staff comment: “occupancy” in this case does not equate dwelling use, rather it refers to the number of individuals allowed to be within the unit at one time. 2.Will there be garbage enclosures? No development garbage facilities are proposed. 3. Provide a Maneuverability Plan. Driving paths and turn radius for large trucks, emergency vehicles, trailers (Boats), Parking and Circulation Exhibits provided (see Exhibits). 4. Provide a Parking Plan. There will be parking spaces within the units. Each parking space shown is 9' wide and 20' deep per code. Submitted exhibits demonstrates that even if vehicles parked directly across from one another perpendicular to the buildings (which is extremely unlikely) there would still be a code permitted drive lane to pass for emergency vehicles. 5. Provide a Fire Lane Turnaround plan for Industrial Boulevard. The updated plans show the availability for a fire turn around within the right of way and abutting property truck entrance. The Orono Fire Chief has reviewed this with no comments. 101 FILE #LA24-000068 March 17, 2025 Page 3 of 4 6. Provide examples of other local Garage Condo Developments. Submitted as separate exhibits of multiple aerials and ground level photos showing the layout of other projects. 7.Provide clarification regarding the scale of the development (photos, elevation plans, landscaping drawing). Renderings of the development from different angles including the requested view from Old Crystal Bay Rd. Also, a Trip Generation Study by a licensed engineer, SSTS LLC. City of Independence used a similar study when reviewed their garage condo project. 8. Provide the timeline for construction: a.Phase I (Buildings 1 and 2) break ground ASAP with goal of being done in the Fall 2025 at the latest. b.Phase II (Buildings 3, 4, and maybe 5) anticipates breaking ground Fall of 2025 and being completed in early 2026. c.Phase III (Building 5) if applicable, would break ground Spring of 2026 and complete by Fall of 2026. 9. Marketing Plan for the development. Updated Project Narrative to included Market details including having at least 1 model unit, viewings by appointment only, and we will likely have a temporary banner to help sales. 10. Development Sign Plans.No development signs are proposed. 11. Lighting Plan. An updated lighting plan is attached with the entrance light. 12. Address the remaining staff comments from a memo dated 1.15.25 and October 29, 2025. The updated civil set of plans have been submitted and are under review by the City Engineer. ANALYSIS The proposed development includes creation of 85 condo units. The property is not being subdivided into separate/individual lots; platting is required in order to create the individual condo units within each building so they may be sold individually similarly to a residential condominium development. The land will be owned by the developer or the development association as “common space”. This project does not trigger application of the City’s Subdivision regulations as the land is not being subdivided. The proposed Garage Condos are intended to be used as private garage/storage spaces for individual owners and will include a shared common exterior area. The shared common area consists primarily of drive aisles, parking, and green spaces which are not intended to be used for storage or warehousing, or any commercial or industrial activity. The project will connect to the city’s water and sewer infrastructure; a stormwater plan including stormwater ponds is also proposed. A development agreement or Site Improvement Plan will be required to define the responsibilities for installation of the utility/stormwater improvements; easements will be dedicated for drainage, utilities, and access throughout the property and development fees will be required. The individual garage units will have significant build-out capabilities, allowing the units to be customized to the owner’s specific needs. Living and/or dwelling within the units will be expressly prohibitedwithin both the association covenants and the Conditional Use Permit. As submitted, the application meets the Conditional Use Permit standards (See separate Exhibit). Staff identified 6 conditions that should run with the land use and should be considered as part of a motion for approval for the application 102 FILE #LA24-000068 March 17, 2025 Page 4 of 4 1. Approval of the CUP will be conditioned upon preliminary and final plat approval. 2. All permitting from MCWD and other agencies must be obtained prior to issuance of building permits. 3. Any changes to or intensification of the use may trigger additional council review and approval. 4. All City Staff comments must be addressed prior to placement on the City Council’s agenda for final plat review. 5. The hours of operation for the site are set as 6am - 10pm 7-days a week. 6. The premises shall not be used or customized for residential living purposes or community gatherings or events. Events in this context means: outdoor activities on the property, such as promotional events, gatherings, demonstrations, displays or other activities which affect any easement or use right, obstruct driveways, access roads, or Common Elements. Engineering and Fire Reviews The City Engineer and Fire Chief have reviewed the draft plans as they relate to drainage, stormwater, grading, and sprinkling/water access requirements. The City Engineer noted no high-level concerns regarding drainage or stormwater. The City Engineer is reviewing the updated plans and will develop an update comment letter. Additionally, Fire Chief reviewed the plans and only provided one comment on the need for a fire hydrant on the south end of the property. The applicant should address the list of comments or areas of clarification provided within the City’s Engineering and Fire Department memo and any updated memos as a result of the amended plans. Public Comment We have received comments from two members of the public that were included in the February 18, 2025 Planning Commission packet and are attached herein as exhibits. No other comments have been submitted to staff. Issues for Consideration 1. Does the proposed application meet the Conditional Use and Site Plan standards? 2. The applicant submitted elevation plans for the proposed Garage Condos. Does the Commission find the architectural measures to be acceptable? 3. The Commission should review the newly submitted information and determine if there is any outstanding or missing information. Planning Staff Recommendation The Planning Commission should consider a motion to APPROVE the application including the following conditions: 1. Approval of the CUP will be conditioned upon preliminary and final plat approval. 2. All permitting from MCWD and other agencies must be obtained prior to issuance of building permits. 3. Changes to or intensification of the use may trigger additional council review and approval. 4. All City Staff comments must be addressed prior to placement on the City Council’s agenda for final plat review. 5. The hours of operation for the site are set as 6 am- 10 pm 7-days a week. 6. The premises shall not be used or customized for residential living purposes or community gatherings or events. Events in this context means: outdoor activities on the property, such as promotional events, gatherings, demonstrations, displays or other activities which affect any easement or use right, obstruct driveways, access roads, or Common Elements. 103 March 17, 2025 Updated Applicable Regulations Industrial Site Plan Review/ Preliminary Plat / Conditional Use Permit Analysis Section 78-825 Lot area, height, setbacks, and lot coverage (a) Minimum Lot Area Requirement & (c) Lot Width: Industrial Lot Area Lot Width Required 40,000 s.f 200’ Actual 168,929.28 s.f. (4.88 acres)276’ (d) Building Setbacks: Industrial Required Proposed Front (OCB R N)35’35’ North Side 20’ 35’ South Side 20’35’ Rear (East)20’ 45’ (f) Lot Coverage / Structural Coverage: Total Lot Area Permitted Proposed 212,572 s.f. (4.88 acres)45%95,900 s.f. (2.2 Ac) 45% Section 78-1701. Hardcover Calculations: Stormwater Overlay District Tier Total Area in Tier Allowed Hardcover Existing Hardcover Proposed Hardcover Tier 5 168,929.28 s.f.143,589.8 s.f. (85 %)Vacant 126,869 s.f./ 3.671 Acres (75 %) Section 78-825 (e) Building height. The industrial district allows for a 40’ defined building height. The lot is relatively flat. Most of the lot sits at 1025’ elevation grade. The proposed first floor elevations of the buildings range from 1023’ to 1025’. The overall site will maintain a similar grade to the existing lot. The buildings are proposed to have a 39.5-foot peak height (measured from the first-floor elevation to the top of the gable) and measure 31.75 feet to the midpoint of the roof. With the minimal grading required for the site, staff anticipates the defined height (grade to the midpoint of a gabled roof) to be approximately 32 feet. The proposed development will conform to the 40’ defined height maximum. Section 78-826 –Building Design and Construction: (5) Long Facades: Where large structures with overly-long facades (walls) are proposed, such as warehouses, building mass should be articulated with variations in the building plane and parapet height and through the use of other unique design or site plan features. The applicant 104 has proposed roof gables to break up the roof mass and create interest along the roofline. Windows and/or wall breaks are proposed on the sides of the buildings. (6) Architectural design: Architectural design should create harmony through the use of different textures, complementary colors, shadow lines and contrasting shapes. The use of walls in a single color, with little detailing or completely blank is discouraged. The proposal shows a mix of materials including stone, stucco, siding, and shingles. The colors are charcoal grey/brown with a light stone accent and a black roof. (9) Building Materials:Use of substantial amounts of high-quality masonry materials (face brick, stucco, stone) is encouraged. Buildings shall be constructed with no less than 67 percent of these materials, excluding window and door areas. Evaluation of building materials shall be based on the quality of its design and relationship and compatibility to building materials in the immediate neighborhood. The applicant is proposing to use brick and stucco on each building in combination to meet the 67% high-quality material requirement. The remaining percentage will be made up of a cement- board siding material finished in a similar color to match the exterior. Section 78-827 Off-Street Parking: (d) Required Parking: The City Code does not list a parking standard associated with the garage condo use. The applicant is not proposing any outdoor parking. Because the use specifically involves interior parking spaces, Staff applied the following provision: City Code Sec. 78-827(d) (3) Multi-tenant industrial buildings: “One space for each 400 square feet of gross floor area, or the sum of the component gross floor areas as follows, whichever is greater”. Based on this provision, a total of 235 parking spaces should be provided; each unit would need to provide 2.7 parking spaces to conform. As designed, each unit would support 2-4 enclosed parking spaces; 60 of the larger-sized units would support 4 cars (240 spaces) and 25 smaller units would support 2 parking spaces (50 spaces). This results in a total of 290 indoor spaces for the site exceeding the calculated requirement. Additionally, the site layout allows for loading and parking directly in front of each unit. It is anticipated in the applicant’s business model that each individual unit will accommodate the necessary parking for the owner. The applicant has provided parking plans and manuverability plans for accessing the site. (g) Snow storage in parking stalls.Provision shall be made in the parking area for adequate snow storage or removal in order to ensure that the required number of spaces is available at all times during the year. The applicant has indicated that storage of snow can be addressed by using the south and east side yards of the property. (h) Circulation. Traffic circulation systems shall be designed to accommodate anticipated traffic demands. Vehicular traffic generated by industrial uses shall be channeled and controlled in a manner which will avoid congestion or interference with other vehicular transportation systems and pedestrians and which will avoid creating traffic hazards and excessive traffic. Staff finds the layout of the proposed plan is reasonable and should support traffic circulation. The submitted maneuverability plans show access for a fire truck, and tailors throughout the site. (i) Parking size. Each parking space shall have a minimum width of nine feet and a minimum 105 depth of 20 feet exclusive of aisle and maneuvering space.While there are no exterior spaces or guest parking areas proposed, the drive aisles will be 50’ wide. This width could support parking for each unit and allow interior traffic to pass within the development. (m) Lighting. Any lighting used to illuminate an off-street parking area shall be hooded and so arranged as to reflect the light away from adjoining property, abutting residential uses, and public rights-of-way. The applicant submitted a lighting plan that shows wall-mounted lighting at each garage condo unit. The lighting plan indicates the lighting will primarily serve the interior of the site. (n) Required Screening. The drive aisles will be screened from the public street view. Section 78-829. Landscaping: (b) Fencing. A 6-foot-tall black wrought iron fence is proposed to surround the development creating a delineation of the property line and screening for the site. The fence also adds to the design of the site. The applicant is proposing an electronic gate access for the site as well. (c) Minimum number of plantings.Industrial Districts shall contain, at a minimum the greater of two trees per 1,000 square feet of gross floor area or two trees per 40 lineal feet of site perimeter whichever is greater. The applicant is proposing 95,900 total square feet of building footprint. Based on this, 192 trees are required to be planted. The attached landscape plan indicates a mix of coniferous, ornamental, and deciduous trees, and a mix of shrubs to meet the planting requirement. The applicant is also proposing some areas of native grasses, and rock and grass buffers throughout the development. The Industrial district requires specific species of trees be planted. The applicant will follow the city code requirements for landscaping. Section 78-832 - Signage: No development signage is proposed. The applicant has indicated there will be wall signs/ Unit numbers placed to identify each unit. Conditional Use Permit: Section 78-823 Industrial District CUP: (a) General provisions. Within the I-Industrial District, no structure or land shall be used for one or more of the following uses without approval of a conditional use permit. The following are conditional uses in the I-Industrial District: (11) Garage condos, provided that: a)No exterior parking or storage is permitted for a period longer than twenty-four (24) hours. A parking plan must be provided to demonstrate accessibility to the site. The project is not proposing any surface parking. The plans submitted indicate all parking will be enclosed in the individual units. The applicant notes in their covenants that no outdoor storage will be permitted. In a maneuverability plan submitted the applicant shows there is access and drive lanes available within the site for if cars are parkin 106 temporarily in front of a unit. b) The premises shall not be used or customized for residential living purposes or community gatherings or events. The applicant states this condition is met. The covenant for the development includes prohibition of living/dwelling within units on site. c) The premises shall not be used for the operation of a business for retail purposes, including but not limited to automobile repair. This does not prohibit minor maintenance, care, or upkeep of motor vehicles, boats, trailers, or recreational vehicles stored in individual units. Storage and warehousing may be permitted. The applicant states this condition is met for the proposed development. If any new or intensified uses are contemplated in the future, a review by City staff and approval by the City Council would be required. d) The management, use, and customization of the garage condos, including common areas, and individual units, shall be governed by an association, which association rules shall place adequate controls to ensure compliance with applicable city code. A draft declaration of covenants for management of the development has been submitted. This condition will be met. e) The premises shall maintain adequate access to individual units and any common areas or office space for emergency response and snow removal/storage. The developers are proposing easements for access, drainage, and utilities throughout the common spaces including the drive aisles. A knox box (a secure key box that allows emergency personnel to access a building/site during an emergency) will be required at the entrance gate for emergency personnel and vehicle access. This condition is met. f)The premises shall contain sufficient lighting and/or security measures to deter or mitigate criminal activity and ensure adequate access for emergency response. A lighting plan has been provided. The property is also proposed to be fenced and gated. This condition is met. g)Any individual unit that is connected to the city sewer and water system shall have individual meters. The applicant is proposing individual water and sewer connections to serve building; and each unit will have their own meter. Section 78-916 Granting of a Permit: Required conditions and policies of a conditional use permit.The burden of proof demonstrating compliance with the following criteria shall be the responsibility of the applicant. In determining whether to approve or deny a conditional use permit, the city council and planning commission shall find that the conditional use permit complies with the following criteria: (a)The planning commission may recommend and the council may grant a conditional use permit as the use permit was applied for or in modified form. On the basis of the application and the evidence submitted, the city must find that the proposed use at the proposed location is or will be: 107 (1)Consistent with the community management plan; The proposed use is consistent with the community management plan as it is consistent with the intended Industrial use of the site. (2)Compliant with the zoning code, including any conditions imposed on specific uses as required by article V, division 3 of the City Code; The proposed use meets the requirements of the Code and the Industrial District as a Conditional Use. (3)Adequately served by police, fire, roads, and stormwater management; The site is adequately served by police, fire, roads, and stormwater management. It is being designed and developed in coordination with consultants and experts to ensure that there are no issues for any of these items. (4)Provided with an adequate water supply and sewage disposal system; The site is provided with adequate water supply and sewage disposal system for the proposed use. Staff recommends the utilities within the development be privately installed and maintained. The City will have access for shut off or emergency services. The developer will be responsible for installation and maintenance of the utility infrastructure. (5)Not expected to generate excessive demand for public services at public cost; The proposed project will be installing a storm pond to serve the neighboring parcels. The proposed use is not expected to generate excessive demand for public services at public cost based on other similar developments’ historic operating records. (6)Compatible with the surrounding area as the area is used both presently and as it is planned to be used in the future; The proposed use is compatible with the surrounding area and with the other Industrial uses to both the north and east of the site. There are residentially-zoned properties across Old Crystal Bay Road North. This low-intensity Industrial use could be preferable to the adjacent residential properties as compared other Industrial uses such as manufacturing or similar uses which may create more noise, pollution or other externalities. (7)Consistent with the character of the surrounding area, unless a change of character is called for in the community management plan; The design of the buildings is consistent with the architectural design standards within the industrial district and the industrial uses. (8)Compatible with the character of buildings and site improvements in the surrounding area, unless a change of character is called for in the community management plan; The design of the buildings and site are consistent with the surrounding area. (9)Not expected to substantially impair the use and enjoyment of the property in the area or have a materially adverse impact on the property values in the area when compared to the impairment or impact of generally permitted uses; This is a conditional use within the Industrial district. It will not impair the use and enjoyment of the properties in the area. The development is proposed to meet the conditions of the district. (10) Provided with screening and buffering adequate to mitigate undesirable views and activities likely to disturb surrounding uses; The proposed landscape plan indicates a variety of plantings surrounding the edge of the property creating screening for the site. The site is surrounded on two sides by industrial parcels, a state highway to the south, and a residential development to the west divided by a 66-foot-wide right-of-way (Old Crystal Bay Road N). The proposed vegetative screening and distance from the adjacent residential developments should provide adequate mitigation from any negative impacts of the site. 108 (11) Not create a nuisance which generates smoke, noise, glare, vibration, odors, fumes, dust, electrical interference, general unsightliness, or other means; The applicant states the activity resulting from the Garage Condos will not cause a nuisance, smoke, noise, glare, vibration, odors, fumes, dust, electrical interference, or general unsightliness. (12) Not cause excessive non-residential traffic on residential streets, parking needs that cause a demonstrable inconvenience to adjoining properties, traffic congestion, or unsafe access;The adjoining properties should not experience parking issues or traffic congestion. The proposed use is expected to have significantly less traffic than the generally allowed uses in the Industrial zoning district. (13) Designed to take into account the natural, scenic, and historic features of the area and to minimize environmental impact; The site is being designed to enhance the natural environment with the stormwater management and planting plans. The site was originally graded when the industrial district was platted in 2007 (Crystal Bay Business Center) and has been vacant with no native plantings or natural areas. (14) All exterior lighting shall be so directed so as not to cast glare toward or onto the public right- of-way or neighboring residential uses or districts; and The site is being designed to not cast glare toward public right-of-way or neighboring residential uses or districts. (15) Not detrimental to the public health, public safety, or general welfare. The proposed use is not detrimental to the public health, public safety, or general welfare and is expected to have less of a chance of any negative impact than the generally allowed uses within the Industrial zoning district. (16) Economic return.The use will provide an economic return to the community and be commensurate with other industrial uses for which the property could feasibly be used. In considering the economic return to the city, the planning commission and city council may give weight to the sociological impact of proposed use, both positive and negative. The applicant noted the use is consistent with the industrial district and other surrounding uses. The site is screened and buffered from abutting residential districts. The use of the property will be interior to the buildings with little exterior activity thus limiting negative impacts to the surrounding area. Fees: The submitted plans reflected each individual building provided with individual connections for City sewer and water with each unit being metered individually. A Sewer Availability Charge (“SAC”) determination by the Metropolitan Council (Met Council) is required in order to calculate the appropriate fees for sewer services. Staff is recommending to use the Met Council’s unit determination to calculate the City’s water and sewer area connection charge. The applicant is requesting these fees be due at time of building permit for each building. Typically, these fees are due at time of final plat, because this is an industrial development and proposed as a phase project staff can accommodate applying these fees with the building permit. At this time, due to the size of the buildings and the number/type of proposed connections it is estimated that the development will require 14 SAC units according to the Met Council. Therefore, City will calculate the water and sewer area charges for 14 units. Each individual condo or suite will need its own water meter. A utility connection permit will be due at the time of building permit issuance for 109 each unit that will be metered as well. PROPOSED DEVELOPMENT FEE ANALYSIS: Fee Type Breakdown Estimated Total Water Area Connection $4,370.00 x 14 units $61,180.00 Water Connection Permit Fee $150.00 x 85 suites**$12,750.00 + meter costs Sewer Area Connection $6,000.00 x 14 units $84,000.00 Sewer Connection Permit Fee $150.00 x 85 Suites**$12.750.00 + meter costs Sewer Availability Charge “SAC” (Met Council) $2,485.00 x 14 units*$34,790.00* Stormwater Drainage Trunk Fee $9,690.00 x 4.89 acres $47,384.10 ESTIMATED DEVELOPMENT FEES = $ 252,854.10 *A SAC determination is required by the Met Council and may alter this fee. 110 Land Use Application Summary Application Date:12/12/2024 Address:430 Old Crystal Bay Road North Orono, MN 55356 Parcel Number:3311823130016 Land Use Number:LA24-000068 Application Submitted By:Agent on behalf of property owner Owner:Name: OLD CRYSTAL BAY LLC Address: OLD CRYSTAL BAY LLC Applicant:Name: Robert Page Company: Orono Garage Condos LLC Address: 5840 Club Valley Rd Shorewood, MN 55331 robertlouis.page@gmail.com Contact Information:Associated Contact: Mark Gronberg markg@gronbergassoc.com Associated Contact: Matt Hagstrom Associated Contact: Associated Contact: Project Description:Garage Condos Land Use Application Type:Amendmend Application Appeal of Admin Decision Concept Application Conditional Use Permit Site Plan Application Subdivision Application Subdivision Exception Vacation Application Variance Application Applicant Signature: 111 Project Narrative for Industrial Garage Condos Development at 430 Old Crystal Bay Road, Orono, MN Project Overview: Our proposed development at 430 Old Crystal Bay Road in Orono, Minnesota, consists of 85 industrial garage condos designed as storage and warehousing spaces. The units range in size from approximately 800 to 1,450 square feet and come equipped with essential utilities such as heating, electricity and plumbing capability. These units are ideal for both individuals and sole-proprietors needing secure storage and/or staging areas for materials and equipment. The project aims to fill a significant gap in the local market for high-quality, utility-equipped storage solutions while adhering to the area’s zoning regulations. The project will be constructed in 2 or 3 phases. Phase 1 will include the first two buildings and up to 35 units. Phase 2 will be 40-50 units depending on if it will include the last 2 or last 3 buildings. Phase 3 will be 10 units if it’s not included in Phase 2. Location & Target Market: Situated within an industrially zoned area at 430 Old Crystal Bay Road, this development is strategically positioned to serve primarily individuals and also sole-proprietors in the surrounding community. Notably, the site’s proximity to numerous lakes in the Orono area, including Lake Minnetonka and Long Lake, makes it an ideal location for climate-controlled boat storage, catering to boat owners who need a secure and convenient place to store their vessels all year round without needing a slip or winterization/start up. These storage solutions are also ideal for RVs and other vehicles that require more space and/or amenities. On top of those use cases, these storage solutions also work well for sole proprietor-style businesses such as plumbers, electricians, and logistics that require a place to store and stage materials and equipment. This development is not intended for customer-facing business operations but rather as a functional space to store and manage inventory, tools, and other business-related assets. Business Model: Each garage condo will be individually sold, allowing owners the flexibility to use the space for storage and operational support without the burden of renting. Our marketing strategy focuses on reaching potential buyers in Orono and neighboring areas through social media and local advertising outlets. Unlike traditional rental storage units, these garage condos offer an ownership-based model that provides a tax-advantaged, long-term, secure asset for individuals and sole proprietors. We will have at least 1 model unit setup temporarily and sales showings will be by appointment only. A temporary banner may be installed during construction and used for promotional purposes. Alignment with Zoning and Community Needs: This project is designed to align with the Industrial District zoning designation of the site at 430 Old Crystal Bay Road by focusing exclusively on permitted storage and warehousing uses. The proposed garage condos strictly adhere to this purpose by offering secure, utility-equipped storage spaces and have clear guidelines and covenants for use that each owner will be required to agree to as part of their purchase. Community Integration & Aesthetics: 112 The design of this development thoughtfully considers the character of Orono, featuring quality materials and landscaping that create an environment blending both functionality and visual appeal. The exterior design adheres to Orono building code requirements which avoids the starkness often associated with industrial storage facilities, opting instead for an approach that incorporates modern architectural elements with a clean and polished look. This refined aesthetic subtly hints at a high-end quality without appearing out of place in the community. By striking a balance between practicality and visual harmony, the development offers a sophisticated yet unobtrusive presence, enhancing the local landscape while providing a valuable resource. Commitment to Collaboration and Compliance: We understand that the council’s review of this project involves determining its fit within the existing zoning framework. We are committed to collaborating with the council to ensure that the development meets all necessary standards, including any additional requirements that may arise through this review process. We are prepared to adapt aspects of the site plan to comply with specific zoning standards related to material use, setbacks, or other factors as directed by the council. Conclusion: Our industrial garage condo project at 430 Old Crystal Bay Road in Orono is a thoughtfully designed development that addresses a clear local need for larger, more robust, and secure storage spaces in the surrounding area. By offering functional and utility-equipped spaces with a refined aesthetic, we aim to provide a resource that supports both individuals and sole-proprietors while enhancing the broader community. We are committed to collaborating with the city council and local stakeholders to ensure this project aligns with Orono’s development goals and contributes positively to the community. This is a community that we are already a part of (one of our partners lives less than a mile away) and we would be proud and diligent to make sure it has a positive impact on the city and its residents. Thanks for your consideration. 113 l COMMON INTEREST COMMUNITY NUMBER ______ Condominium ORONO GARAGE CONDOMINIUMS DECLARATION THIS INSTRUMENT WAS DRAFTED BY: Edwin Chanin Chanin Law Firm, P.A. 18171 82nd Place North Maple Grove, Minnesota 55311 (612) 963 7707 ed@chaninlaw.com 114 ii Table of Contents SECTION 1 DEFINITIONS ........................................................................................................... 6 SECTION 2 DESCRIPTION OF UNITS, BOUNDARIES AND RELATED EASEMENTS...... 8 2.1. Units. ...................................................................................................................... 8 2.2. Unit Boundaries. ..................................................................................................... 8 2.3. Appurtenant Easements. ......................................................................................... 8 SECTION 3 COMMON ELEMENTS, LIMITED COMMON ELEMENTS AND OTHER PROPERTY .................................................................................................................................... 8 3.1. Common Elements. ................................................................................................ 8 3.2. Limited Common Elements. ................................................................................... 9 SECTION 4 ASSOCIATION MEMBERSHIP; RIGHTS, INTERESTS AND OBLIGATIONS . 9 4.1. Membership. ......................................................................................................... 10 4.2. Allocation of Voting Rights. Undivided Interests and Common Expense Obligations. ....................................................................................................................... 10 4.3. Appurtenant Rights and Obligations. ................................................................... 10 4.4. Authority to Vote. ................................................................................................. 10 SECTION 5 ADMINISTRATION ............................................................................................... 10 5.1. General. ................................................................................................................ 10 5.2. Operational Purposes. ........................................................................................... 11 5.3. Binding Effect of Actions. .................................................................................... 11 5.4. Bylaws. ................................................................................................................. 11 5.5. Management. ........................................................................................................ 11 5.6. Rules and Regulations. ......................................................................................... 11 5.7. Association Assets: Surplus Funds. ...................................................................... 11 SECTION 6 ASSESSMENTS ...................................................................................................... 12 6.1. General. ................................................................................................................ 12 6.2. Annual Assessments. ............................................................................................ 12 6.3. Special Assessments. ............................................................................................ 12 6.4. Limited Assessments. ........................................................................................... 12 6.5. Working Capital Fund. ......................................................................................... 13 6.6. Liability of Owners for Assessments. .................................................................. 14 6.7. Declarant’s Liability for Assessments. ................................................................. 14 6.8. Assessment Lien. .................................................................................................. 15 6.9. Foreclosure of Lien: Remedies. ............................................................................ 15 6.10. Lien Priority: Foreclosure. ................................................................................... 15 6.11. Real Estate Taxes and Assessments. .................................................................... 16 6.12. Voluntary Conveyances: Statement of Assessments. ........................................... 16 SECTION 7 RESTRICTIONS ON USE OF PROPERTY .......................................................... 16 7.1. General. ................................................................................................................ 16 7.2. Subdivision or Conversion. .................................................................................. 16 7.3. Permitted Uses and Restrictions. .......................................................................... 17 115 iii 7.4. Leasing. ................................................................................................................ 17 7.5. Parking. ................................................................................................................. 17 7.6. Animals. ............................................................................................................... 17 7.7. Signs. .................................................................................................................... 18 7.8. Exterior Lighting. ................................................................................................. 18 7.9. Outdoor Activities. ............................................................................................... 18 7.10. Quiet Enjoyment: Interference Prohibited. .......................................................... 18 7.11. Compliance with Law. ......................................................................................... 18 7.12. Ponds, Wetlands and Trees. ................................................................................. 19 7.13. Time Shares Prohibited. ....................................................................................... 19 7.14. Access to Units. .................................................................................................... 19 SECTION 8 ARCHITECTURAL STANDARDS ....................................................................... 19 8.1. Restrictions on Improvements. ............................................................................. 19 8.2. Review Procedures. .............................................................................................. 21 8.3. Remedies for Violations. ...................................................................................... 21 8.4. Owner Responsibility/Indemnity. ........................................................................ 21 8.5. Exemptions. .......................................................................................................... 21 SECTION 9 MAINTENANCE AND REPAIR ........................................................................... 22 9.1. Association Obligations. ...................................................................................... 22 9.2. Owner Obligations. .............................................................................................. 22 SECTION 10 INSURANCE ......................................................................................................... 23 10.1. Association Insurance. .......................................................................................... 23 10.2. Cancellation: Notice of Loss. ............................................................................... 24 10.3. Conflicts with Act. ............................................................................................... 24 10.4. Owners’ Insurance/Indemnity. ............................................................................. 24 SECTION 11 RECONSTRUCTION, EMINENT DOMAIN AND TERMINATION ................ 25 11.1. Reconstruction. ..................................................................................................... 25 11.2. Eminent Domain. .................................................................................................. 25 11.3. Termination and Liquidation. ............................................................................... 25 11.4. Notice. .................................................................................................................. 25 11.5. Association’s Authority. ....................................................................................... 25 SECTION 12 EASEMENTS ........................................................................................................ 25 12.1. Access. .................................................................................................................. 25 12.2. Use and Enjoyment. ............................................................................................. 26 12.3. Structural Support. ................................................................................................ 26 12.4. Encroachments. .................................................................................................... 26 12.5. Maintenance, Repair, Replacement and Reconstruction. ..................................... 26 12.6. Utilities and Services. ........................................................................................... 26 12.7. Emergency Access to Units. ................................................................................. 27 12.8. Project Signs. ........................................................................................................ 27 12.9. Declarant’s Easements. ........................................................................................ 27 12.10. Other Easements. .................................................................................................. 27 12.11. Continuation, Scope and Conflict of Easements. ................................................. 27 12.12. Non-Interference: Impairment Prohibited. ........................................................... 27 116 iv 12.13. Benefit of Easements. ........................................................................................... 27 SECTION 13 COMPLIANCE AND REMEDIES ....................................................................... 28 13.1. Entitlement to Relief. ........................................................................................... 28 13.2. Remedies. ............................................................................................................. 28 13.3. Rights to Hearing. ................................................................................................. 29 13.4. Lien for Charges, Penalties, Etc. .......................................................................... 29 13.5. Costs of Proceeding and Attorneys’ Fees. ............................................................ 29 13.6. Liability for Acts of Owners and Tenants. ........................................................... 30 13.7. Enforcement by Owners. ...................................................................................... 30 13.8. Pre-litigation Requirement. .................................................................................. 30 SECTION 14 DECLARANT RIGHTS ........................................................................................ 30 14.1. Complete Improvements. ..................................................................................... 30 14.2. Relocate Boundaries, Subdivide, Combine, Convert and Alter Units. ................ 30 14.3. Marketing Facilities. ............................................................................................. 31 14.4. Signs. .................................................................................................................... 31 14.5. Easements. ............................................................................................................ 31 14.6. Control of Association. ......................................................................................... 31 14.7. Consent to Certain Amendments. ......................................................................... 31 14.8. Relocation of Boundaries or Subdivision, Conversion or Combination of Units. 31 14.9. Additional Real Estate. ......................................................................................... 31 14.10. Other Rights. ........................................................................................................ 32 SECTION 15 AMENDMENTS ................................................................................................... 32 15.1. Approval Requirements. ....................................................................................... 32 15.2. Procedures. ........................................................................................................... 32 SECTION 16 MISCELLANEOUS .............................................................................................. 33 16.1. Severability. .......................................................................................................... 33 16.2. Construction. ........................................................................................................ 33 16.3. Tender of Claims. ................................................................................................. 33 16.4. Notices. ................................................................................................................. 33 16.5. Conflicts Among Documents. .............................................................................. 33 16.6. Duration of Covenants. ......................................................................................... 33 117 5 (Above Space Reserved for Recording Data) COMMON INTEREST COMMUNITY NO. _____ Condominium ORONO GARAGE CONDOMINIUMS DECLARATION This Declaration (the “Declaration”) is made in the County of Hennepin, State of Minnesota, on this ____ day of ___________, 2025, by Orono Garage Condos, LLC, a Minnesota limited liability company (the “Declarant”), pursuant to the provisions of Minnesota Statutes Chapter 515B, known as the Minnesota Common Interest Ownership Act (the “Act”), for the purpose of creating Orono Garage Condominiums as a condominium under the Act. WHEREAS, Declarant is the owner of certain real property located in Hennepin County, Minnesota, that is legally described in Exhibit B attached hereto, and Declarant desires to submit said real property and all improvements thereon (collectively the “Property”) to the Act as a condominium, and WHEREAS, Declarant desires to establish on the Property, a plan for a non-residential development, to be owed, occupied and operated for the use, health, safety and welfare of the Owners and Tenants of the Property, and for the purpose of preserving the value, quality and character of the Property, and WHEREAS, the Property (i) is not subject to an ordinance referred to in Section 515B.1- 106 of the Act, governing conversions to common interest ownership, and (ii) is not subject to a master association as defined in the Act; and WHEREAS, the common interest community does not include shoreland as defined in Minnesota Statutes Section 103F.205. 118 6 THEREFORE, Declarant subjects the Property to this Declaration under the name “Orono Garage Condominiums,” consisting of the Units referred to in Section 2, and declaring that this Declaration shall constitute covenants to run with the Property, and that the Property and any real estate added thereto shall be owned, used, occupied and conveyed subject to the covenants, restrictions, easements, charges and liens set forth herein, all of which shall be binding upon all Persons owning or acquiring any right, title or interest therein, and their heirs, personal representatives, successors and assigns. SECTION 1 DEFINITIONS The following words when used in the Governing Documents shall have the following meanings (unless the context indicates otherwise): 1.1 “Act” means the Minnesota Common Interest Ownership Act, Minnesota Statutes Chapter 515B, as amended. 1.2 "Additional Real Estate" means the real property legally described on Exhibit C attached hereto, including any improvement located thereon now or in the future, and all easements and rights appurtenant thereto, which property Declarant has the exclusive right to add to the common interest community. 1.3 “Assessments” means and refers to all assessments levied by the Association pursuant to Section 6 of this Declaration. 1.4 “Association” means Orono Garage Condominium Association, a nonprofit corporation created pursuant to Minnesota Statutes Chapter 317A and Section 515B.3-101 of the Act, whose members consist of all Owners. 1.5 “Board” means the Board of Directors of the Association, as provided for in the Bylaws. 1.6 “Building” means each structure which is or becomes a part of the Property and contains a Unit or Units. 1.7 “Bylaws” means the Bylaws governing the operation of the Association, as amended from time to time. 1.8 “City” means the city of Orono, Minnesota. 1.9 “Common Elements” means all parts of the Property including any improvement thereon, except the Units. 1.10 “Common Expenses” means all expenditures made or liabilities incurred by or on behalf of the Association and incident to its operation, including Assessments 119 7 and items otherwise identified as Common Expenses in the Declaration or Bylaws. 1.11 “Common Interest Community” (also sometimes referred to herein as “CIC”) shall mean the contiguous or noncontiguous real estate described on Exhibit B attached hereto that is subject to this Declaration, as more fully described in Section 515B.1-103(10) of the Act. 1.12 “Declarant Control Period” means the time period during which Declarant has the exclusive right to appoint the members of the Board, as described in Section 14.7 of this Declaration. 1.13 “Governing Documents” means this Declaration, and the Articles of Incorporation and Bylaws of the Association, as amended from time to time, all of which shall govern the use and operation of the Property. 1.14 “Limited Common Elements” means a portion of the Common Elements allocated by the Declaration or by operation of Section 515B.2-102(d) of the Act for the exclusive use of one or more but fewer than all of the Units. 1.15 “Member” means all persons who are members of the Association by reason of being Owners as defined in this Declaration. The words “Owner” and “Member” may be used interchangeably in the Governing Documents. 1.16 “Mortgagee” means any Person owning a mortgage recorded against a Unit, which mortgage constitutes a first mortgage lien against the Unit. 1.17 “Owner” means a Person who owns a Unit in fee title, but excluding contract for deed vendors, mortgagees, holders of remainder or reversionary interests and other secured parties within the meaning of the Act. 1.18 “Person” means a natural individual, corporation, limited liability company, partnership, limited liability partnership, trustee, or other legal entity capable of holding title to real property. 1.19 “Plat” means the recorded plat depicting the Property pursuant to the requirements of Section 515B.2-110(c) of the Act, including any amended or supplemental Plat recorded from time to time in accordance with the Act. 1.20 “Property” means all of the real property subjected to this Declaration, now or in the future, including all structures and any other improvement located thereon. The Property is legally described in Exhibit B attached hereto. 1.21 “Rules and Regulations” means the Rules and Regulations of the Association as approved from time to time pursuant to Section 5.6. 120 8 1.22 “Tenant” means any Person or Persons, other than an Owner, occupying or using a Unit. 1.23 “Unit” means a part of the Property, other than the Common Elements, including one or more rooms or enclosed spaces, occupying all or part of one or more floors of a Building, designed and intended for separate ownership and use, as described in Section 2 and shown on the Plat. Any terms used in the Governing Documents and defined in the Act and not in this Section, shall have the meaning set forth in the Act. References to Section numbers refer to the Sections of this Declaration unless otherwise indicated. References to the singular may refer to the plural, and conversely, depending upon context. SECTION 2 DESCRIPTION OF UNITS, BOUNDARIES AND RELATED EASEMENTS 2.1. Units. There are a maximum of eighty-five (85) Units, subject to the right of Declarant to subdivide, combine or convert Units, as provided in Section 14. The Units shall be used exclusively for non-residential purposes, including vehicle, motor-sports and other business storage. Each Unit constitutes a separate parcel of real estate. The Unit identifiers and locations of the Units are as shown on the Plat, which is incorporated herein by reference. A schedule of the Units is set forth in Exhibit A. 2.2. Unit Boundaries. The boundaries of each Unit shall be the interior unfinished surfaces of its perimeter walls, floors and ceilings. Wallpaper, paneling, tiles and other finishing materials adhered to the interior of the Unit boundaries shall be a part of the Unit; provided, that any load bearing portions of any interior or perimeter walls, columns, ceilings or floors, and any common utility lines or other common facilities located in or passing through a Unit, shall be Common Elements. The boundaries of each Unit shall also extend along the inside unfinished surfaces of its perimeter doors and windows, and their frames, and said perimeter doors, windows and frames, and their hardware, shall be deemed to be Limited Common Elements appurtenant to such Unit. Subject to this Section and Section 3.2, all spaces, interior partitions, and other fixtures and improvements within the boundaries of a Unit are a part of the Unit. 2.3. Appurtenant Easements. The Units shall be subject to and benefited by the easements described in Section 12. SECTION 3 COMMON ELEMENTS, LIMITED COMMON ELEMENTS AND OTHER PROPERTY 3.1. Common Elements. The Common Elements and their characteristics are as follows: 3.1.1. All of the Property not included within the Unit boundaries and any load bearing portions of any interior or perimeter walls, columns, ceilings or floors; and any common utility lines or other common facilities located in or passing through a Unit shall be Common Elements. The Common Elements include, but are not limited to, all areas 121 9 and items listed in this Section 3, and those parts of the Property designated as Common Elements on the Plat or in the Act. 3.1.2. The Common Elements shall be subject to (i) the easements described in this Declaration and any other easements recorded against the Common Elements; (ii) the rights of Owners and Tenants in any Limited Common Elements allocated to their respective Units; and (iii) the right of the Association to establish reasonable Rules and Regulations governing the use of the Property. 3.2. Limited Common Elements. The Limited Common Elements are those parts of the Common Elements reserved for the exclusive use of the Owners and Tenants of the Units to which they are allocated. The rights to the use and enjoyment of the Limited Common Elements are automatically conveyed with the conveyance of such Units. The Limited Common Elements are described and allocated to the Units, as follows: 3.2.1. Those items or areas designated as Limited Common Elements on the Plat are allocated to the Units indicated thereon. 3.2.2. Improvements, if any, such as loading dock platforms, built-in vehicle lifts, decks, balconies, awnings, exterior windows and doors, driveways, walks, walkways or entryways constructed as part of the original construction to serve a single Unit or Units, and replacements and modifications thereof authorized pursuant to Section 8, located wholly or partially outside the Unit boundaries, are allocated to the Unit or Units which they serve. 3.2.3. Chutes, flues, ducts, drains, pipes, wires, conduit or other utility installations, bearing walls, bearing columns, or any other components or fixtures located wholly or partially outside the Unit boundaries, and serving only that Unit or Units, are allocated to the Unit or Units they serve. Any portion of such installations serving or affecting the function of the Common Elements is a part of the Common Elements. 3.2.4. Heating, ventilating, air conditioning, plumbing, electrical or mechanical equipment serving only a certain Unit or Units and located wholly or partially outside the Unit boundaries is allocated to the Unit or Units served by such equipment. 3.3 Annexation of Other Property. In addition to the Additional Real Estate, which may be unilaterally annexed only by the Declarant, other real property may be annexed to the common interest community as Common Elements and subjected to this Declaration, in accordance with Section 515B.2-125 of the Act. SECTION 4 ASSOCIATION MEMBERSHIP; RIGHTS, INTERESTS AND OBLIGATIONS Membership in the Association, and the allocation to each Unit of a portion of the votes in the Association and a portion of the Common Expenses of the Association and undivided interests in the Common Elements, shall be governed by the following provisions: 122 10 4.1. Membership. Each Owner shall be a member of the Association solely by reason of owning a Unit, and the membership shall be transferred with the conveyance of the Owner’s interest in the Unit. An Owner’s membership shall terminate when the Owner’s ownership terminates. When more than one Person is an Owner of a Unit, all such Persons shall be members of the Association, but multiple ownership of a Unit shall not alter the voting rights allocated to such Unit nor authorize the division of the voting rights. 4.2. Allocation of Voting Rights. Undivided Interests and Common Expense Obligations. Voting rights, undivided interests in the Common Elements and Common Expense obligations (subject to Sections 6.4 and 6.7) are allocated among the Units based upon the area of each Unit (exclusive of any optional mezzanine area) relative to the aggregate area of all Units, as set forth as percentages in Exhibit A attached hereto. The voting rights, Common Expense obligations and undivided interests referred to in this Section 4.2 shall be reallocated among all Units based upon the above formula in the event additional Units are created. 4.3. Appurtenant Rights and Obligations. The ownership of a Unit shall include the voting rights, Common Expense obligations and undivided interests described in Section 4.2. Said rights, interests and obligations, and the title to the Units, shall not be separated or conveyed separately, and any conveyance, encumbrance, judicial sale or other transfer of any allocated interest in a Unit, separate from the title to the Unit shall be void. The allocation of the rights, interests and obligations described in this Section may not be changed, except in accordance with the Governing Documents and the Act. 4.4. Authority to Vote. The Owner, or some natural person designated to act as proxy on behalf of the Owner, and who need not be an Owner, may cast the vote allocated to such Unit at meetings of the Association. However, if there are multiple Owners of a Unit, only the Owner or other person designated pursuant to the provisions of the Bylaws may cast such vote. The voting rights of Owners are more fully described in Section 3 of the Bylaws. SECTION 5 ADMINISTRATION The administration and operation of the Association and the Property, including but not limited to, the acts required of the Association, shall be governed by the following provisions: 5.1. General. The operation and administration of the Association and the Property shall be governed by the Governing Documents, the Rules and Regulations, and the Act. The Association shall, subject to the rights of the Owners set forth in the Governing Documents and the Act, be responsible for the operation, management and control of the Property. The Association shall have all powers described in the Governing Documents, the Act and the statute under which the Association is incorporated. All power and authority exercisable by the Association shall be vested in the Board, unless action or approval by the individual Owners is specifically required by the Governing Documents or the Act. All references to the Association shall mean the Association acting through the Board, unless specifically stated to the contrary. 123 11 5.2. Operational Purposes. The Association shall operate and manage the Property for the purposes of (i) administering and enforcing the covenants, restrictions, easements, charges and liens set forth in the Governing Documents and the Rules and Regulations, (ii) maintaining, repairing and replacing those portions of the Property for which it is responsible, and (iii) preserving the value and architectural character of the Property. 5.3. Binding Effect of Actions. All agreements and determinations made by the Association in accordance with the powers and voting rights established by the Governing Documents or the Act shall be binding upon all Owners and Tenants, and their lessees, guests, heirs, personal representatives, successors and assigns, and all secured parties as defined in the Act. 5.4. Bylaws. The Association shall have Bylaws. The Bylaws shall govern the operation and administration of the Association and shall be binding on all Owners and Tenants. The Bylaws need not be recorded. 5.5. Management. The Board may delegate to a manager or managing agent the management of any or all Units, including any management duties imposed upon the Association’s officers and directors by the Governing Documents and the Act. However, such delegation shall not relieve the officers and directors of the ultimate responsibility for the performance of their duties as prescribed by the Governing Documents and by law. The Declarant and/or an affiliate of the Declarant may be employed as the manager of the Association and/or the Property pursuant to a separate, written agreement, subject to termination as provided by the Act or the management agreement. 5.6. Rules and Regulations. The Property and the conduct of Persons thereon is subject to regulation, as follows: 5.6.1. The Board has the exclusive authority to approve and implement such reasonable Rules and Regulations as it deems necessary from time to time for the purpose of operating and administering the affairs of the Association and regulating the use of the Property; provided that the Rules and Regulations shall not be inconsistent with the Governing Documents or the Act. The inclusion in other parts of the Governing Documents of authority to approve Rules and Regulations shall be deemed to be in furtherance, and not in limitation, of the authority granted by this Section. New or amended Rules and Regulations shall be effective only after reasonable notice thereof has been given to the Owners. 5.6.2. An Owner may establish reasonable rules relating to the internal use of such Owner’s Unit and the conduct of Persons using or visiting the Unit; provided that the rules shall be consistent with and subject to the Governing Documents, the Rules and Regulations, this Declaration and applicable law. 5.7. Association Assets: Surplus Funds. All funds and real or personal property acquired by the Association shall be held and used for the benefit of the Owners for the purposes stated in the Governing Documents. Surplus funds remaining after payment of or provision for 124 12 Common Expenses and reserves shall be credited against future Assessments or added to reserves, as determined by the Board. SECTION 6 ASSESSMENTS 6.1. General. Assessments shall be determined and assessed against the Units by the Board, in its discretion, subject to the requirements and procedures set forth in this Section 6 and the Bylaws. Assessments shall include annual Assessments under Section 6.2 and may include special Assessments under Section 6.3 and limited Assessments under Section 6.4. Annual and special Assessments shall be allocated among the Units in accordance with the allocation formula set forth in Section 4.2. Limited Assessments under Section 6.4 shall be allocated to Units as set forth in that Section. 6.2. Annual Assessments. Annual Assessments shall be established and levied by the Board. Each annual Assessment shall cover all of the anticipated Common Expenses of the Association for that year which are to be shared by all Units in accordance with the allocation formula described in Section 4.2. Annual Assessments shall be payable annually, or in equal monthly or quarterly installments, as established by the Board. Annual Assessments may provide, among other things, for an adequate reserve fund for the replacement of the Common Elements and those parts of the Units for which the Association is responsible and which are not funded by limited Assessments, pursuant to Section 6.4. Annual Assessments shall provide, for funds adequate to perform the minimum required maintenance of the Common Elements under any preventive maintenance plan adopted by the Association as required under Section 515B.3- 107 of the Act. 6.3. Special Assessments. In addition to annual Assessments, the Board may levy in any Assessment year a special Assessment against all Units in accordance with the allocation formula set forth in Section 4.2. Among other things, special Assessments may be used for the purpose of defraying in whole or in part the cost of any unforeseen or unbudgeted Common Expense. 6.4. Limited Assessments. In addition to annual Assessments and special Assessments, the Board may at its discretion, levy and allocate limited Assessments among one or more, but not all, Units, in accordance with the following requirements and procedures: 6.4.1. Any Common Expense associated with the maintenance, repair, or replacement of a Limited Common Element shall be assessed exclusively against the Unit or Units to which that Limited Common Element is allocated, as determined by the Board. 6.4.2. Any Common Expense benefiting fewer than all of the Units but not falling within Section 6.4.1 may be assessed against the Unit or Units benefited, as determined by the Board. 125 13 6.4.3. The costs of insurance may be assessed equally or by actual cost per Unit, and the costs of common utilities may be assessed equally, in proportion to usage, or such other reasonable allocation as may be approved by the Board. 6.4.4. Reasonable attorneys’ fees and other professional fees and costs incurred by the Association in connection with (i) the collection of Assessments and (ii) the enforcement of the Governing Documents, the Act, or the Rules and Regulations, against an Owner or Tenant or their guests, may be assessed against the Owner’s Unit. 6.4.5. Late charges, fines and interest may be assessed as provided in Section 13. 6.4.6. If any damage to the Common Elements, Limited Common Elements or another Unit or any portion of the Owner’s Unit that the Association is obligated to maintain is caused by the act or omission of any Owner or Tenant, or their guests, the Association may assess the costs of repairing the damage exclusively against the offending Owner’s Unit to the extent not covered by insurance. 6.4.7. If a Unit is owned by multiple individuals or an entity and the Common Elements or any other improvements or facilities related to the common interest community are used by more than one individual and his or her immediate family, (“immediate family” being defined to include the individual’s spouse, children and stepchildren) the Board is authorized to assess an Owner of the Unit for excess use of the Common Elements or such other improvements or facilities in an amount determined by the Board. 6.4.8. If Common Expense liabilities are reallocated for any purpose authorized by the Act, Assessments and any installment thereof not yet due shall be recalculated in accordance with the reallocated Common Expenses liabilities. Assessments levied under Sections 6.4.l through 6.4.7 may, at the Board’s discretion, be assessed as a part of, or in addition to, the other Assessments levied under Section 6.1 or 6.2. 6.5. Working Capital Fund. There shall be established a working capital fund to meet unforeseen or unbudgeted expenditures or to purchase additional equipment or services during the Association’s beginning years of operation. There shall be contributed, on a one-time basis upon the initial sale of each Unit by Declarant, an amount equal to $500.00 per Unit. The contribution shall be paid by the Unit purchasers at the earlier of the time of closing of sale of the Unit or by the Declarant at the time of termination of the Declarant Control Period as to then unsold Units. The contributions to this fund are in addition to the regular installments of annual Assessments. The Board may include in each subsequent annual budget a reasonable amount of working capital, based upon the anticipated needs of the Association for the year in question. The funds shall be deposited into an account of the Association (which need not be a segregated account) no later than the termination of the Declarant Control Period. Funds deposited in said account may be used to fund replacement reserves or for operations of the Property or the Association. Upon the closing of the initial sale of a Unit, Declarant may reimburse itself from 126 14 funds collected from the purchaser at the closing for any prior contributions made by Declarant to any reserve fund with respect to that Unit. 6.6. Liability of Owners for Assessments. The obligation of an Owner to pay Assessments shall commence at the later of (i) the time at which the Owner acquires title to the Unit, or (ii) the due date of the first Assessment levied by the Board. The Owner at the time an Assessment is payable with respect to the Unit shall be personally liable for the share of the Common Expenses assessed against such Unit. Such liability shall be joint and several where there are multiple Owners of the Unit. Subject to Section 6.7, the liability is absolute and unconditional and no Owner is exempt from liability for payment of Assessments by right of set- off, by waiver of use or enjoyment of any part of the Property, by absence from or abandonment of the Unit, by the waiver of any other rights, or by reason of any claim against the Declarant, the Association or its officers, directors or agents, or for their failure to fulfill any duties under the Governing Documents or the Act. 6.7. Declarant’s Liability for Assessments. Pursuant to Section 515B.3-1151 of the Act, the Declarant is hereby authorized to establish an alternate common expense plan whereby the Declarant’s Common Expense liability, and the corresponding assessment lien against the Units owned by the Declarant, is limited to: (A) paying when due, in compliance with Section 515B.3.1-1151(b) of the Act, an amount equal to the full share of replacement reserves allocated to Units owned by the Declarant, as set forth in the Association’s annual budget, and (8) paying when due all accrued expenses of the CIC in excess of the aggregate assessments payable with respect to Units owned by persons other than Declarant, provided that the alternate common expense plan shall not affect Declarant’s obligation to make up any operating deficit pursuant to Section 515B.3-115l(a)(2)(iv) of the Act. 6.7.1. Duration of Alternate Common Expense Plan. The alternate common expense plan shall be effective for a period of not less than one year but shall in any event terminate upon the termination of the Declarant Control Period unless terminated earlier pursuant to Section 515B.3-1151 (a)(2)(iii) of the Act. 6.7.2. Level of Services. The alternate common expense plan shall have no effect on the level of services for items set forth in the Association’s budget. 6.7.3. Accounting Obligations Associated with Use of Alternate Common Expense Plan. If Declarant utilizes an alternate common expense plan, Declarant shall cause to be prepared and delivered to the Association, at the Declarant’s expense, within 90 days after the termination of the Declarant Control Period, an audited balance sheet and profit and loss statement certified to the Association and prepared by an accountant having the qualifications set forth in section 515B.3-121 (b) of the Act. The audit shall be binding on the Declarant and the Association. (i) If the audited profit and loss statement shows an accumulated operating deficit, the Declarant shall be obligated to make up the deficit within 15 days after delivery of the audit to the Association, and the Association shall have a claim against the Declarant for an 127 15 amount equal to the deficit until paid. If Declarant does not utilize an alternate common expense plan, Declarant is not liable to make up any operating deficit. (ii) The existence and amount, if any, of the operating deficit shall be determined using the accrual method of accounting applied as of the date of termination of the Declarant Control Period, regardless of the accounting methodology previously used by the Association to maintain its accounts. (iii) Unless approved by a vote of the Unit Owners other than the Declarant and its affiliates, the operating deficit shall not be made up, prior to the election by the Unit Owners of a Board of Directors pursuant to section 515B.3-103(d) of the Act, through the use of a special assessment or by assessments described in subsections 515B.3-1151(e), (f), and (g) of the Act. 6.8. Assessment Lien. The Association has a lien on a Unit for any Assessment levied against that Unit from the time the Assessment becomes due. If an Assessment is payable in installments, the full amount of the Assessment is a lien from the time the first installment thereof becomes due. Fees, charges, late charges, fines and interest charges imposed by the Association pursuant to Section 515B.3-102(a)(10), (11) and (12) of the Act are liens, and are enforceable as Assessments, under this Section 6. Recording of the Declaration constitutes record notice and perfection of any lien under this Section 6, and no further recordation of any notice of or claim for the lien is required. Notwithstanding the foregoing, in the event that the Association records a notice of lien against a Unit, the Association will be deemed to be a purchaser for purposes of the Recording Act, Minnesota Statutes §507.34, as of the date that the lien document is properly recorded. Past due assessments, and amounts enforceable hereunder as assessments, shall bear interest at the rate established with respect to judgments under Minnesota Statutes Section 549.09. The release of the lien shall not release the Owner from personal liability unless agreed to in writing by the Association. 6.9. Foreclosure of Lien: Remedies. A lien for Assessments may be foreclosed against a Unit under the laws of the State of Minnesota (i) by action, or (ii) by advertisement in a like manner as a mortgage containing a power of sale. The Association, or its authorized representative, shall have the power to bid in at the foreclosure sale and to acquire, hold, lease, mortgage and convey any Unit so acquired. The Owner and any other Person claiming an interest in the Unit, by the acceptance or assertion of any interest in the Unit, grants to the Association a power of sale and full authority to accomplish the foreclosure. The Association shall, in addition to its other remedies, have the right to pursue any other remedy at law or in equity against the Owner who fails to pay any Assessment or charge against the Unit. 6.10. Lien Priority: Foreclosure. A lien for Assessments is prior to all other liens and encumbrances on a Unit except (i) liens and encumbrances recorded before the Declaration, (ii) any first mortgage on the Unit, and (iii) liens for real estate taxes and other governmental assessments or charges against the Unit. Notwithstanding the foregoing, if (1) a first mortgage on 128 16 a Unit is foreclosed, (2) the first mortgage was recorded on or after the date of recording of this Declaration, and (3) no Owner redeems during the Owner’s period of redemption provided by Minnesota Statutes Chapters 580, 581, or 582; then the holder of the sheriffs certificate of sale from the foreclosure of the first mortgage or any person who acquires title to the Unit by redemption as a junior creditor shall take title to the Unit subject to a lien in favor of the Association for unpaid Assessments or installments thereof levied pursuant to Sections 515B.3- 115(a), (e)(l) to (3), (f), and (i) of the Act which became due, without acceleration, during the six months immediately preceding the first day following the end of the Owner’s period of redemption. 6.11. Real Estate Taxes and Assessments. Real estate taxes, special assessments, and other charges and fees which may be levied against the Common Elements by governmental authorities, shall be allocated among and levied against the Units based upon their respective percentage interests in the Common Elements as set forth in Exhibit A, and shall be a lien against each Unit in the same manner as a lien for real estate taxes and special assessments levied against the Unit alone. 6.12. Voluntary Conveyances: Statement of Assessments. In a voluntary conveyance of a Unit the buyer shall not be personally liable for any unpaid Assessments and other charges made by the Association against the seller or the seller’s Unit prior to the time of conveyance to the buyer, unless expressly assumed by the buyer. However, the lien of such Assessments shall remain against the Unit until released. Any seller or buyer shall be entitled to a statement, in recordable form, from the Association setting forth the amount of the unpaid Assessments against the Unit, including all Assessments payable in the Association’s current fiscal year, which statement shall be binding on the Association, seller and buyer. SECTION 7 RESTRICTIONS ON USE OF PROPERTY All Owners and Tenants, and all Mortgagees and other secured parties, by their acceptance or assertion of an interest in the Property, or by their occupancy of part or all of a Unit, covenant and agree that, in addition to any other restrictions which may be imposed by the Act, the Governing Documents, or the Rules and Regulations, the occupancy, use, operation, alienation and conveyance of the Property shall be subject to the following restrictions: 7.1. General. The Property shall be owned, conveyed, encumbered, leased, used and occupied subject to the Governing Documents and the Act, as amended from time to time. All covenants, restrictions and obligations set forth in the Governing Documents are in furtherance of a plan for the Property and shall run with the Property and be a burden and benefit to all Owners and Tenants and to any other Person acquiring or owning an interest in the Property, their heirs, personal representatives, successors and assigns. The Property shall be used for private uses, except as otherwise approved by the Board. 7.2. Subdivision or Conversion. Except as permitted by this Declaration, no Unit, nor any part of the Common Elements, may be subdivided, partitioned or converted without the prior written approval of all Owners and all Mortgagees. 129 17 7.3. Permitted Uses and Restrictions. The Property shall be used for (i) vehicle storage, including but not limited to the storage of automobiles, motorcycles, recreational vehicles, all terrain vehicles and snowmobiles, (ii) business-related storage and related office uses permitted by City ordinances or by agreement with the City, and approved by the Board, and (iii) other non-residential uses permitted by City ordinances or by agreement with the City, and approved by the Board; provided that none of the following businesses, trades, occupations or professions, whether carried on for profit or otherwise, shall be conducted, maintained or permitted anywhere on the Property: adult theatre, adult amusement facility, any facility selling, providing or displaying adult-oriented or pornographic materials, liquidation facility, auction house, flea market, sleeping quarters or lodging, housing or raising animals, day care or child care facility, nursing home or nursing facility, any retail use, place of worship or betting establishment. The permitted hours of operation for all Units shall be from 6:00 AM to 10:00 PM daily. Use of any Unit outside of these hours is strictly prohibited, except for emergency access. 7.4. Leasing. Leases of Units shall be permitted, subject to the following conditions: (i) the Tenant’s use shall comply with Section 7.3, (ii) no Unit may be subleased, (iii) a Unit must be leased in its entirety (not in part or by room), (iv) all leases shall be in writing, and (v) all leases shall provide that they are subject to the Governing Documents, the Rules and Regulations and the Act, and that any failure of the Tenant to comply with the terms of such documents shall be a default under the lease. The Owner of the leased Unit shall, upon request of the Board, provide a copy of the signed lease to the Association. 7.5. Parking. Parking should be contained inside of the unit. Any parking directly outside a unit, will be subject to the following standards: (i) Temporary Parking Only – Vehicles, trailers, or equipment may only be parked outside a Unit while Owner is present. (ii) Temporary Parking Location – An Owner must park directly in front of its own Unit(s), and as close as possible to the Unit. (iii) No Extended or Overnight Parking – Exterior parking is strictly limited to permitted hours. Parking overnight is prohibited. (iv) Enforcement – The Association may enforce violations through fines, towing, or other actions at the Owner’s expense. 7.6. Animals. The Board shall have the exclusive authority to prohibit, or to allow and regulate, the keeping of animals on the Property, or to require and enforce removal of animals that exhibit behavioral problems whose owners fail or refuse to comply with pet restrictions. This authority may be exercised so as to permit or prohibit different types or breeds of animals, but those animals which are permitted (if any) shall be limited to common domestic dogs and cats. However, no animal may be bred or kept or maintained for business for business or commercial purposes, anywhere on the Property. The word “animal” shall be interpreted in its broadest sense and shall include all living creatures except humans. Notwithstanding the foregoing, no provision of the Governing Documents, nor any Rule or Regulation, may prohibit 130 18 the keeping of a qualified service dog or similar animal by a person who is handicapped within the meaning of the Fair Housing Amendments Act of 1988 or comparable state law. 7.7. Signs. Signs or other displays of any type may be erected (i) only at locations established by the Declarant or subsequently approved by the Board, (ii) in compliance with City sign ordinances and the design standards established for the Property by the Declarant, and (iii) approved pursuant to Section 8. The design, erection and maintenance of signs shall be subject to the following additional requirements and conditions: 7.7.1. An Owner may erect and post signs within the Owner’s Unit as necessary to direct traffic, identify spaces, and facilitate other internal operations of the Unit. 7.7.2. An Owner, outside whose Unit a sign identifying the Unit is located, shall be responsible for maintaining the sign in good condition and in a manner consistent with the first-class maintenance and design standards applicable to the Property as a whole, except that any common signs or directories identifying the project shall be maintained by the Association. 7.7.3. All signs or other displays shall be subject to prior approval by the Declarant so long as Declarant owns a Unit for sale or has the right to add Additional Real Estate to the Property. 7.8. Exterior Lighting. The location, size, color and design of all lighting fixtures or similar equipment used or shown outside of a Building must be (i) in compliance with City lighting requirements, (ii) consistent with the design standards established for the Property by the Declarant and (iii) approved pursuant to Section 8. 7.9. Outdoor Activities. Outdoor activities on the Property, such as promotional events, gatherings, demonstrations, displays or other activities which have the potential to materially affect any easement or use rights, cause a nuisance or material disturbance, create a safety or health hazard, create material liability for the Association or any Member, obstruct driveways, access roads, or Common Elements, and otherwise violate any provisions of this Declaration or the Association’s Rules and Regulations shall be prohibited. 7.10. Quiet Enjoyment: Interference Prohibited. All Owners and Tenants and their guests shall have a right of quiet enjoyment in their respective Units, subject to the usual and customary sounds, odors or activities commonly associated with occupants such as those located in the Units. Subject to the foregoing, the Property shall be occupied and used in such a manner as will not cause a nuisance, nor unduly restrict, interfere with or impede the reasonable use and quiet enjoyment of the Property by other Owners and Tenants and their guests. 7.11. Compliance with Law. No use shall be made of the Property which would violate any then-existing municipal codes or ordinances, or state or federal laws, nor shall any act or use be permitted which could cause waste to the Property, cause a material increase in insurance rates on the Property, or otherwise cause any unusual liability, health or safety risk, or expense, for the Association or any owner or Tenant. 131 19 7.12. Ponds, Wetlands and Trees. Ponds, marshes, wetland areas, vegetation and trees, whether natural or otherwise, shall be maintained in substantially the same condition as originally existing or established by the Declarant, subject only to (i) changes authorized or made by the Association consistent with all statutes, requirements, rules and regulations imposed on such areas and items by governmental authorities having jurisdiction and (ii) the prior approval by the City or any other governmental authorities, if required. 7.13. Time Shares Prohibited. The time share form of ownership, or any comparable form of lease, occupancy rights, ownership, or right-to-use plans, which has the effect of dividing the ownership or occupancy of a Unit into separate time periods, is prohibited. 7.14. Access to Units. In case of emergency, all Units and Limited Common Elements are subject to entry, without notice and at any time, by an officer or member of the Board, by the Association’s management agents or by any public safety personnel. Entry is also authorized for maintenance purposes under Section 9, and for enforcement purposes under Section 13. 7.15. Occupancy Limits. The maximum occupancy of each Unit shall be determined in accordance with applicable building, fire, and safety codes as established by the City of Orono or other governing authorities. Owners are responsible for ensuring compliance with these limits, and the Association reserves the right to enforce occupancy restrictions as necessary to maintain safety and compliance with local regulations. Specifically, the Code Diagrams in the architectural drawings specify that the: - 20’x40’ units shall have a maximum occupancy of 3, - 24’x46’ units shall have a maximum occupancy of 4, and - 31’x46’ units shall have a maximum occupancy of 5 SECTION 8 ARCHITECTURAL STANDARDS 8.1. Restrictions on Improvements. One of the purposes of this Declaration is to ensure that the Property is kept architecturally attractive and substantially uniform in appearance. Therefore, except as set forth in Section 8.6, the following restrictions and requirements shall apply to improvements to the Property: 8.1.1. No modifications, alterations, improvements, repairs or replacements of any type, temporary or permanent, structural, aesthetic or otherwise (collectively referred to as “improvements”), including but not limited to, any structure, building, addition, deck, patio, fence, wall, enclosure, window, exterior door, antenna or other type of sending or receiving apparatus, sign, flag, display, decoration, color change, shrubbery, material topographical or landscaping change, shall be made, or caused or allowed to be made, by any Owner or Tenant, or their invitees, in any part of the Common Elements, or in any part of the Unit which affects the Common Elements or another Unit, or which is visible from the exterior of the Unit. 8.1.2. The Board may appoint, supervise and disestablish an architectural committee, and specifically delegate to it part or all of the functions which the Board 132 20 exercises under this Section 8, in which case the references to the Board shall refer to the architectural committee where appropriate. The architectural committee shall be subject to the supervision of the Board. 8.1.3. The Board shall establish the criteria for approval of improvements, which shall include and require, at a minimum: 8.1.3.1. substantial uniformity of color, location, type and design in relation to existing Buildings and topography, 8.1.3.2. comparable or better quality of materials as used in any existing improvement on the Property, 8.1.3.3. ease of maintenance and repair, 8.1.3.4. adequate protection of the Property, the Association, Owners and Tenants from liability and liens arising out of the proposed improvements, 8.1.3.5. substantial preservation of other Owners’ sight lines, if material, and 8.1.3.6. compliance with governmental laws, codes and regulations. The Board, or the appointed architectural committee if so authorized by the Board, has the right to establish such additional criteria, architectural or otherwise, as it deems appropriate, and shall be the sole judge of whether such criteria are satisfied. 8.1.4. Approval of improvements which immaterially encroach upon another Unit or the Common Elements shall create an appurtenant easement for such encroachment in favor of the Unit with respect to which the improvements are approved, notwithstanding any contrary requirement in the Governing Documents or the Act. A file of the Board resolutions approving or denying all applications for improvements shall be maintained permanently as a part of the Association’s records. 8.1.5. Interior improvements to a Unit or its Limited Common Elements may be made without approval by the Board, provided that such improvements do not impair the structural or weather-tight integrity of the Common Elements, interfere with utilities or Building operating systems or violate applicable governmental laws, codes or regulations. The Board shall have the authority to approve and implement such reasonable Rules and Regulations as it deems necessary from time to time for the purpose of restricting interior improvements to a Unit or its Limited Common Elements which may impair the structural or weather-tight integrity of the Common Elements, interfere with utilities or Building operating systems or violate applicable governmental laws, codes or regulations. 133 21 To the extent interior improvements to a Unit or its Limited Common Elements involve electrical work, such electrical work must be performed by a licensed electrician. 8.2. Review Procedures. The following procedures shall govern requests for improvements under this Section: 8.2.1. Detailed plans, specifications and related information regarding any proposed improvement, in form and content acceptable to the Board, shall be submitted to the Board and to Declarant (if applicable) at least sixty days prior to the projected commencement of construction. No improvements shall be commenced prior to approval. 8.2.2. The Board and Declarant (if applicable) shall give the Owner written notice of approval or disapproval. If the Board and Declarant (if applicable) fail to give notice of approval or disapproval within sixty days after receipt of (i) said plans and specifications and (ii) all other information requested by the Board and Declarant (if applicable), then approval shall be deemed to be granted; provided, that the improvements are done in accordance with the plans, specifications and related information which were submitted. 8.2.3. If no request for approval is submitted, approval shall be deemed to be denied. 8.3. Remedies for Violations. The Association may undertake any measures, legal, equitable or administrative, to enforce compliance with this Section and shall be entitled to recover from the Owner causing or permitting the violation all attorneys’ and other professional fees and costs of enforcement incurred by the Association, regardless of the type of action taken (if any). Such attorneys’ fees and costs shall be a lien against the Owner’s Unit and a personal obligation of the Owner. In addition, the Association shall have the right to enter the Owner’s Unit and to restore any part of a Building or Unit to its prior condition if any improvements were made in violation of this Section, and the cost of such restoration shall be a personal obligation of the Owner and a lien against the Owner’s Unit. 8.4. Owner Responsibility/Indemnity. The Owner who causes an improvement to be made, regardless of whether the improvement is approved by the Board, shall be responsible for the construction work and any claims, damages, losses or liabilities arising out of the improvements. The Owner shall hold harmless, indemnify and defend the Association, and its officers, directors and committee members, from and against any expenses, claims, damages, losses or other liabilities, including without limitation attorneys’ fees and costs of litigation, arising out of (i) any improvement which violates any governmental laws, codes, ordinances or regulations, (ii) the adequacy of the specifications or standards for construction of the improvements and (iii) the construction of the improvements. 8.5. Exemptions. The requirements set forth in this Section 8 (except Section 8.5) shall not apply to original construction by Declarant or its affiliates in connection with its completion and sale of the Units. 134 22 SECTION 9 MAINTENANCE AND REPAIR 9.1. Association Obligations. Subject to Section 9.2, the Association shall provide for all maintenance, repair or replacement (collectively referred to as “maintenance”) of the Common Elements and Limited Common Elements, including any improvement thereto, subject to the following qualifications or additions: 9.1.1. The Association shall maintain garage doors, garage door hardware, openers, and weather-stripping. 9.1.2. The cost of maintenance, repair or replacement of part or all of a Limited Common Element shall be assessed against the Unit or Units to which the Limited Common Element is allocated in accordance with Section 6.4.1. 9.1.3. The cost of maintenance, repair or replacement of a part of the Common Elements which benefits only a certain Unit or Units, may be assessed against the Unit or Units benefited in accordance with Section 6.4.2. 9.1.4. The Association may, with the approval of a majority of Owners who have authority to cast in excess of fifty percent (50%) of the total votes in the Association in person or by proxy at a meeting called for such purposes, undertake to maintain, repair or replace mechanical, structural or other components within the Units. 9.1.5. The Association may undertake to maintain, repair or replace mechanical, structural or other components within the Units and assess the costs against the Unit if the failure or impairment of the component could result in damage to the Common Elements. or other Units, impair the function of any common Building systems, or create a health or safety hazard. 9.1.6. The Association shall be responsible for incidental damage caused to a Unit or its Limited Common Elements by work undertaken by the Association pursuant to this Section. 9.1.7. If damage is caused to the Common Elements, Limited Common Elements or other Units by an Owner or Tenant, or their guests, or by any condition in the Unit or Limited Common Elements which the Owner or Tenant has caused or allowed to exist, then the Association may repair the damage or correct the condition and assess the cost thereof against the responsible Owner’s Unit. 9.2. Owner Obligations. Each Owner shall, at its expense, undertake the following obligations for maintenance, repair and replacement: 9.2.1. To maintain, repair, and replace the Owner’s Unit. The Units shall be kept in good, clean and sanitary condition and repair. 135 23 9.2.2. To perform its maintenance obligations promptly and in such manner as not to damage the Property, nor unreasonably disturb or cause a hazard to persons occupying or otherwise using the Property. The Board may require that the Owners perform their maintenance obligations in accordance with reasonable standards established by the Board and in a manner consistent with the Declarant’s design plan for the common interest community. 9.2.3. To promptly pay or reimburse the Association for any costs incurred by the Association for the repair of any damage to the Common Elements, Limited Common Elements or other Units, caused by an Owner or Tenant, or their guest, or caused by any condition in the Unit or Limited Common Elements which the Owner or Tenant has allowed to exist. 9.2.4. If an Owner fails or refuses to perform the Owner’s duty to maintain, repair or replace, the Association shall have authority to undertake the necessary work and assess the Owner’s Unit for the cost thereof; provided that reasonable notice and an opportunity to sure the violation shall first be given to the Owner. SECTION 10 INSURANCE 10.1. Association Insurance. The Association shall obtain and maintain the following insurance relating to the Property: 10.1.1. The Association shall, at a minimum, maintain property insurance in broad form covering all risks of physical loss in an amount equal to one hundred percent of the insurable “replacement cost” of the Property, less deductibles; but excluding (i) land, footings, excavation and other items normally excluded from coverage, and (ii) items such as ceilings or wall finishing materials, floor coverings, plumbing, lighting and other interior fixtures, built-in equipment, business equipment, or any other improvement or betterment installed within the Units. The policy or policies shall also cover personal property owned by the Association. The policy or policies shall also contain “Inflation Guard” and “Agreed Amount” endorsements, if reasonably available. The Association may enter into an agreement with a Mortgagee or a guarantor, insurer or servicer of a mortgage, obligating the Association to keep other coverages or endorsements in effect. The Association may also enter into agreements among all Owners as to the allocation of insurance proceeds among their Units. 10.1.2. Commercial general liability insurance covering the use, operation and maintenance of the Common Elements, with minimum limits of one million dollars per occurrence, against claims for death, bodily injury and property damage, and such other risks as are customarily covered by such policies for projects similar in construction, location and use to the Property. The policy shall contain a “severability of interest” endorsement which shall preclude the insurer from denying the claim of an Owner or Tenant because of negligent acts of the Association or other Owners or Tenants. 136 24 10.1.3. Such other types and amounts or insurance as may be determined by the Board to be necessary or desirable, including but not limited to officers and directors’ liability insurance, workers’ compensation insurance, and insurance or fidelity bonds covering dishonest acts by those Persons having control or custody of the Association’s funds. 10.2. Cancellation: Notice of Loss. All policies or property insurance and comprehensive liability insurance maintained by the Association shall provide that the policies shall not be canceled or substantially modified, for any reason, without at least thirty days’ prior written notice to the Association, the insureds and all Mortgagees. 10.3. Conflicts with Act. In the event of a conflict between this Section 10 and the Act, this Section 10 shall control, it being the intention of Declarant that the Association and the Owners shall have authority and discretion to deal with the unique insurance needs associated with the uses of these nonresidential Units and the requirements of Mortgagees. 10.4. Owners’ Insurance/Indemnity. Each Owner shall obtain and maintain the following insurance and provide the described indemnities: 10.4.1. Property insurance insuring any insurable improvement within the Owner’s Unit for the full insurable replacement value of such improvement. 10.4.2. Commercial general liability insurance covering the Owner’s Unit, and the activities of the Owner, and its officers, directors, employees and agents in connection with the Owner’s occupancy, operation, management and use of the Unit, including any additional coverages customarily carried for unique or hazardous activities arising out of a business or activities conducted on the Unit. Said liability insurance shall be in the minimum amounts of (i) $1,000,000 for an accident affecting more than one person in or resulting from one occurrence and (ii) $1,000,000 property damage for each occurrence. Each Owner shall, upon request of the Association or any other Owner, furnish a certificate or certificates of such insurance. 10.4.3. Each Owner shall hold harmless, indemnify and defend the Declarant, other Owners and the Association, and their respective officers, directors and employees, from and against all claims, actions, damages and other liabilities, including attorneys’ fees and costs, arising out of incidents occurring within such Owner’s Unit or arising out of the conduct of the Owner or Tenants of the Unit or their employees, agents, contractors and guests, unless caused by the intentional or negligent act or omission of the party to be indemnified. 10.4.4. The Owner’s insurance shall be primary as against the Association’s insurance for damages to any interior improvement to the Units, and there shall be no right of contribution against the Association’s insurance, with respect to damage or activities within the Owner’s Unit. 137 25 SECTION 11 RECONSTRUCTION, EMINENT DOMAIN AND TERMINATION 11.1. Reconstruction. The obligations and procedures for the repair, reconstruction or disposition of the Property following damage or destruction thereof shall be governed by the Act. Any repair or reconstruction shall be commenced as soon as practicable after the casualty and shall be substantially in accordance with the plans, specifications and design of the Property as initially constructed and subsequently improved. 11.2. Eminent Domain. In the event of a taking of any part of the Property by condemnation or eminent domain, the provisions of the Act shall govern; provided, (i) that notice shall be given as provided in Section 11.4 and 16.4; (ii) that the Association shall be the attorney-in-fact to represent the Owners in any related proceedings, negotiations, settlements or agreements; and (iii) that any awards or proceeds shall be payable to the Association for the benefit of the Owners and the Mortgagees of their Units, as their interests may appear. 11.3. Termination and Liquidation. The termination of the common interest community, and the distribution of any proceeds therefrom, shall be governed by the Act, except that any distributions shall be allocated based upon the value of the Units as unanimously agreed upon by the Owners, or by appraisers agreed upon in writing by a majority of the Owners and Mortgagees, and shall be made to Owners and their Mortgagees as their interests may appear. 11.4. Notice. The Association shall give written notice of any condemnation proceedings or substantial destruction of the Property to the Mortgagees within ten business days after the casualty or first legal notice of condemnation. 11.5. Association’s Authority. In all cases involving reconstruction, condemnation, eminent domain, termination or liquidation of the common interest community, the Association may (i) act on behalf of the Owners in all proceedings, negotiations and settlement of claims, or (ii) delegate the authority to act to an Owner or Owners of the affected Units if the casualty affects fewer than all Units. If such authority is retained and exercised by the Association, then all proceeds shall be payable to the Association to hold and distribute for the benefit of the Owners and their Mortgagees. Mortgagees are entitled to priority for awards and distributions in accordance with the priorities established by the Act and their mortgage loan documents, as their interests may appear. SECTION 12 EASEMENTS The following appurtenant easements and rights are hereby granted, conveyed, dedicated and reserved on, over, under and across the Property, as applicable. 12.1. Access. Each Unit shall be the beneficiary of a nonexclusive easement for access to and from public roadways and walkways on and across those portions of the Common Elements designated for use as roadways, driveways or walkways, as originally constructed, shown on the Plat or otherwise designated by the Association, subject to any restrictions 138 26 authorized by (i) the Governing Documents or the Rules and Regulations, or (ii) any governmental authority. 12.2. Use and Enjoyment. Each Unit shall be the beneficiary of nonexclusive easements for use and enjoyment on and across the Common Elements and any Limited Common Element allocated to the respective Units, subject to any restrictions authorized or imposed by the Governing Documents. 12.3. Structural Support. Each Unit and the Common Elements shall be subject to and the beneficiary of nonexclusive easements for structural support in all walls, columns, joists, girders and other structural components located in or passing through another Unit or other parts of the Building or shared with an adjoining Unit or the Common Elements. 12.4. Encroachments. Each Unit and the Common Elements, and the rights of the Owners and Tenants therein, shall be subject to a nonexclusive easement in favor of the adjoining Units for encroachments caused by the construction, reconstruction, repair, shifting, settlement or movement of any part of the Property, and for any improvement which is added in compliance with Section 8. If there is an encroachment upon another Unit or the Common Elements, as a result of any of the aforementioned causes, an easement shall exist for the encroachment, for the use, enjoyment and habitation of any encroaching Unit or improvement, and for the maintenance thereof. Any improvement added pursuant to Section 8 shall be limited to minor encroachments, and no easement shall exist unless the proposed improvement has been approved and constructed as required by this Declaration. Such easements shall continue for as long as the encroachment exists and shall not affect the marketability of title. 12.5. Maintenance, Repair, Replacement and Reconstruction. Each Unit, and the rights of the Owners and Tenants thereof, and the Common Elements and Limited Common Elements, shall be subject and benefited by a nonexclusive easement in favor of the Association for the maintenance, repair, replacement and reconstruction of the Common Elements, Units and any improvements related thereto, and utilities serving the Units, to the extent necessary to fulfill the Association’s obligations under the Governing Documents. Each Owner shall afford to the Association and its management agents and employees, access at reasonable times and upon reasonable notice, to and through the Unit and its Limited Common Elements for maintenance, repair and replacement; provided that access may be had without notice and at any time in case of emergency. 12.6. Utilities and Services. The Common Elements and the Units shall be subject to and benefited by non-exclusive easements in favor of the Association, the City and all utility companies and other service providers for the installation, use, maintenance, repair and replacement of all utilities, services and common operating systems, such as natural gas, electricity, cable television and other electronic communications, water, sewer, septic systems, wells, and similar services, fire control systems and other common operating systems, and metering and control devices, which exist, which are constructed as part of the development of the Property which are approved by the City, which are approved by the Association under authority contained in the Governing Documents or the Act, or which are described or referred to in the Plat, this Declaration or other recorded instruments. Each Unit, and the rights of the 139 27 Owners and Tenants thereof, shall also be subject to and benefited by a non-exclusive, easement in favor of the other Units, the Common Elements and the Association for all such utilities, services, fire control systems and other common operating systems. Utilities and related services or systems shall be installed, used, maintained and repaired so as not to interfere with the use and quiet enjoyment of the Units by the Owners and Tenants, nor affect the structural or architectural integrity of the Buildings, Units or any Common Element improvement. 12.7. Emergency Access to Units. In case of emergency, all Units and Limited Common Elements are subject to an easement, without notice and at any time, in favor of the Association for access by the Association’s management agents, and in favor of fire, police or other public safety personnel. 12.8. Project Signs. Declarant and the Association shall have a non-exclusive easement and right to erect and maintain temporary and permanent signs and related monuments identifying the common interest community on the Common Elements and on Units owned by the Declarant. Those parts of the Property on which monument signs or any related decorative improvement is located shall be subject to non-exclusive easements in favor of the Association for the continuing use, maintenance, repair and replacement of said signs and any improvements. 12.9. Declarant’s Easements. The Units and Common Elements are subject to exclusive easements in favor of the Declarant for the exercise of its declarant rights as described in the Governing Documents. 12.10. Other Easements. The Property shall be subject to such other easements as may be recorded against the Property by reason of the City’s requirements in connection with the development of the Property. 12.11. Continuation, Scope and Conflict of Easements. The easements set forth in this Section (i) shall run with the land and shall be appurtenant to the benefited Property; (ii) shall supplement and not limit any easements described elsewhere in this Declaration, or otherwise recorded; (iii) shall be permanent, subject only to termination in accordance with the terms of the easement; and (iv) shall include reasonable access to the easement areas over and through the Property for purposes of construction, maintenance, repair, replacement and reconstruction. 12.12. Non-Interference: Impairment Prohibited. All Persons exercising easement rights shall do so in a reasonable manner so as not to materially interfere with the operation of the Property or damage to the Property and shall be financially liable for all costs of repair of any part of the Property which is damaged by the Person’s exercise of the easement rights. No Person shall impair, obstruct or cause damage to any easement area, or any improvement or equipment installed therein. Notwithstanding anything in this Declaration to the contrary, no Owner or Tenant shall be denied reasonable access to his or her Unit or the right to Utility services thereto. 12.13. Benefit of Easements. All easements benefiting a Unit shall benefit the Owners and Tenants of the Unit, and their guests. However, an Owner who has delegated the right to occupy the Unit to an Tenant or Tenants, whether by a lease or otherwise, does not have the use and other easements rights in the Property during such delegated occupancy, except (i) as a guest 140 28 of an Owner or Tenant or (ii) in connection with the inspection of the Unit or recovery of possession of the Unit pursuant to law. SECTION 13 COMPLIANCE AND REMEDIES Each Owner and Tenant, and any other Person owning or acquiring any interest in the Property, shall be governed by and comply with the provisions of the Act, the Governing Documents, the Rules and Regulations, and such amendments thereto as may be made from time to time, and the decisions of the Association. A failure to comply shall entitle the Association to the relief set forth in this Section, in addition to the rights and remedies authorized elsewhere by the Governing Documents or the Act. 13.1. Entitlement to Relief. Legal relief may be sought by the Association, at its discretion, against any Owner, or by an Owner against the Association or another Owner, to enforce compliance with the Governing Documents, the Rules and Regulations, the Act or the decisions of the Association. However, no Owner may withhold any Assessments payable to the Association or take or omit other action in violation of the Governing Documents, the Rules and Regulations or the Act, as a measure to enforce such Owner’s position, or for any other reason. 13.2. Remedies. In addition to any other remedies or sanctions, expressed or implied, administrative or legal, the Association shall have the right (or the obligation if so indicated) to implement any one or more of the following actions against Owners and Tenants and/or their guests, who violate the provisions of the Governing Documents, the Rules and Regulations or the Act: 13.2.1. Commence legal action for damages or equitable relief in any court of competent jurisdiction. 13.2.2. Impose late charges, in an amount determined by the Board in its reasonable discretion, for each Assessment or installment thereof past due more than thirty days and impose interest at the highest rate permitted by law accruing beginning on the first day of the month after the Assessment or installment was due. 13.2.3. In the event of default of more than thirty days in the payment of any Assessment or installment thereof, all remaining installments of Assessments levied against the Unit owned by the defaulting Owner, together with any late payment charges, interest, attorneys’ and other professional fees and costs of collection, may be accelerated by the Board and shall then be payable in full if not paid within ten days after receipt of notice from the Association. 13.2.4. Impose reasonable fines, penalties or charges for each violation of the Act, the Governing Documents or the Rules and Regulations. 13.2.5. Restore any portions of any Common Elements, Unit or Limited Common Elements damaged or altered, or allowed to be damaged or altered, by any Owner or 141 29 Tenant or their guests in violation of the Governing Documents, and to assess the cost of such restoration against the responsible Owners and their Units. 13.2.6. Enter any Unit or Limited Common Element in which a violation or breach of the Governing Documents or the Rules and Regulations exists which materially affects, or is likely to materially affect in the near future, the health or safety of the other Owners or Tenants, or their guests, or the safety or soundness of any other part of the Property or the property of the Owners or Tenants, and to summarily abate and remove, at the expense of the offending Owner or Tenant, any structure, thing or condition in the Unit or Limited Common Elements which is causing the violation; provided, that any improvement which is a part of a Unit may be altered or removed only pursuant to a court order or with the agreement of the Owner. 13.2.7. Foreclose any lien arising under the provisions of the Governing Documents or under law, in the manner provided by the Act and Section 6. 13.3. Rights to Hearing. Before the imposition of any of the remedies authorized by Section 13.2.4, 13.2.5 or 13.2.6, the Board shall, upon written request of the offender, grant to the offender an opportunity for a fair and equitable hearing as contemplated by the Governing Documents and the Act. The offender shall be given notice of the nature of the violation and the right to a hearing, and at least ten days within which to request a hearing. The hearing shall be scheduled by the Board and held within thirty days of receipt of the hearing request by the Board, and with at least ten days prior written notice to the offender. If the offender fails to timely request a hearing or to appear at the hearing, then the right to a hearing shall be waived and the Board may take such action as it deems appropriate. The decision of the Board and the rules for the conduct of hearings established by the Board shall be final and binding on all parties. The Board’s decision shall be delivered in writing to the offender within ten days following the hearing, if not delivered to the offender at the hearing. If the Board delegates the hearing duties described in this Section to a committee, then references in this Section to the Board’s hearing duties shall refer to the committee. 13.4. Lien for Charges, Penalties, Etc. Any charges, fines, expenses, penalties, interest or other impositions under this Section shall be a lien against the Unit of the Owner or Tenant against whom the same are imposed and the personal obligation of such Owner in the same manner and with the same priority and effect as Assessments under Section 6. The lien shall attach as of the date of imposition of the remedy but shall not be final as to violations for which a hearing is held until the Board makes a written decision at or following the hearing. All remedies shall be cumulative, and the exercise of, or failure to exercise, any remedy shall not be deemed a waiver of the Association’s right to pursue any others. 13.5. Costs of Proceeding and Attorneys’ Fees. With respect to any collection measures, or any measures or action, legal, administrative, or otherwise, which the Association takes pursuant to the provisions of the Act, Governing Documents or Rules and Regulations, whether or not finally determined by a court or arbitrator, the Association may assess the Unit owned by the violator with any expenses incurred in connection with such enforcement, including, without limitation, fines or charges previously imposed by the Association, - 142 30 reasonable attorneys’ fees and other professional fees, and interest (at the highest rate allowed by law) on the delinquent amounts owed to the Association. Such expenses shall also include any collection or contingency fees or costs charged to the Association by a collection agency or other Person acting on behalf of the Association in collecting any delinquent amounts owed to the Association by an Owner or Tenant. Such collection or contingency fees or costs shall be the personal obligation of the Owner of the Unit and shall be a lien against such Owner’s Unit. 13.6. Liability for Acts of Owners and Tenants. An Owner shall be liable for the expense of any maintenance, repair or replacement of the Property rendered necessary by such Owner’s acts or omissions, or by that of Tenants or guests in the Owner’s Unit, to the extent that such expense is not covered by the proceeds of insurance carried by the Association or such Owner or Tenant. However, any insurance deductible amount and/or increase in insurance rates of the Association resulting from the Owner’s acts or omissions may be assessed against the Owner responsible for the condition and against his or her Unit. 13.7. Enforcement by Owners. The provisions of this Section shall not limit or impair the independent rights of Owners to enforce the provisions of the Governing Documents, the Rules and Regulations, and the Act as provided therein. 13.8. Pre-litigation Requirement. Any litigation, administrative proceeding or other legal action instituted or intervened in by or in the name of the Association, exclusive of any action (i) to collect Assessments or foreclose Assessment liens, or (ii) to enforce the Governing Documents or the Rules and Regulations, is subject to prior approval by the Owners of Units to which are allocated a majority [in excess of fifty percent (50%)] of the total votes in the Association. Any litigation, administrative proceeding or other legal action instituted or intervened in by or in the name of the Association involving a construction defect claim as defined by Section 515B.1-1 03(11a) of the Act requires compliance with Sections 515B.3- 102(d) and (e), and 515B.4-116(c) of the Act prior to commencement. SECTION 14 DECLARANT RIGHTS Declarant hereby reserves exclusive and unconditional authority to exercise the following declarant rights within the meaning of Section 515B.1-103(33b) of the Act, and other rights described in this Section, for as long as it owns a Unit, or for such shorter period as may be specifically indicated: 14.1. Complete Improvements. To complete all the Buildings, Units and any other improvement indicated on the Plat, or otherwise included in Declarant’s development plans, or authorized by the City or the Declaration, and to make improvements in the Units owned by the Declarant and Common Elements to accommodate the exercise of any declarant rights. 14.2. Relocate Boundaries, Subdivide, Combine, Convert and Alter Units. To relocate boundaries between Units, subdivide, combine and convert Units and to otherwise alter Units owned by it, to the extent permitted by the Act in and accordance with Section 14.8. 143 31 14.3. Marketing Facilities. To construct, operate and maintain a sales office, management office, models, and other development, sales and rental facilities within the Common Elements, and within any Units owned or leased by Declarant from time to time located anywhere on the Property or on the Additional Real Estate. 14.4. Signs. To erect and maintain signs and other sales displays offering the Units for sale or lease, in or on any Unit owned by Declarant and on the Common Elements or on the Additional Real Estate. 14.5. Easements. To have and use easements, for itself, its employees, contractors, representatives, agents, prospective purchasers or other invitees through and over the Common Elements and Limited Common Elements for the purpose of exercising its declarant rights. 14.6. Control of Association. To control the operation and administration of the Association, including without limitation the power to appoint and remove the members of the board pursuant to Section 515B.3-103 of the Act, until the earliest of: (i) voluntary surrender of control by Declarant, (ii) conveyance to Owners other than Declarant of seventy-five percent of the total number of Units authorized to be included in the Property or (iii) the date three years following the date of the first conveyance of a Unit to an Owner other than Declarant. Notwithstanding the foregoing, the Owners other than Declarant shall have the right to nominate and elect not less than thirty-three and one-third percent of the directors at a meeting of the Owners which shall be held within sixty days following the conveyance by Declarant of fifty percent of the total number of Units authorized to be included in the Property. 14.7. Consent to Certain Amendments. Declarant’s written consent shall be required for any amendment to the Governing Documents or Rules and Regulations so long as Declarant owns any Unit for initial sale or has the right to add Additional Real Estate to the Property. 14.8. Relocation of Boundaries or Subdivision, Conversion or Combination of Units. Declarant shall have the following rights and authority pursuant to Section 515B.2-112 of the Act with respect to Units owned by it: (i) to relocate the boundaries of any Units and (ii) to combine Units. Other Owners shall have the right to create additional Units by the subdivision of any Unit owned by them in accordance with Section 515B.2-112 of the Act. 14.9. Additional Real Estate. Declarant hereby expressly reserves the right to add the Additional Real Estate to the Property, by unilaterally executing and recording a supplemental declaration pursuant to Section 515B.2-111 of the Act, subject to the following conditions: 14.9.1 The right of Declarant to add the Additional Real Estate to the common interest community shall terminate ten (10) years after the date of recording of this Declaration or upon earlier express written withdrawal of such right by Declarant or a successor Declarant, unless extended by a vote of the Owners pursuant to Section 515B.2-106(2) of the Act. There are no other limitations on Declarant's rights hereunder, except as may be imposed by law. 144 32 14.9.2 The Additional Real Estate is described in Exhibit C attached hereto. The Additional Real Estate may be added to the Property in parcels consisting of one or platted or un-platted parcels, or portions thereof, and in any sequence. 14.9.3 Declarant has no obligation to add the Additional Real Estate to the Property. If Declarant decides to add the Additional Real Estate to the Property, there are no assurances as to the times at which any part of the Additional Real Estate will be added, the order in which it will be added, the number of Units per phase nor the size of the Units. The Additional Real Estate may be developed by Declarant or its successors in interest for any purpose, subject only to approval by the appropriate governmental authorities. The maximum number of Units that may be created within the Additional Real Estate described as such on the date of this Declaration is approximately 9 Units. All Units created on the Additional Real Estate shall be restricted exclusively to non-residential use. 14.9.4 The Units, Buildings and any other improvement created upon the Additional Real Estate will be compatible with the Units, Buildings and any other improvement which is initially a part of the Property, in terms of general architectural style, quality of construction, principal materials employed in construction, subject to market conditions and governmental and lender requirements. 14.9.5 All covenants and restrictions contained in this Declaration affecting the use, occupancy and alienation of Units shall apply to all Units created on the Additional Real Estate. The statements made in this Section 14.9 shall not apply to any Additional Real Estate which is not added to the Property. 14.10. Other Rights. To have and exercise such other rights as are afforded Declarant under the terms of this Declaration or identified, now or in the future, as special declarant rights in Section 515B.1-103 of the Act. SECTION 15 AMENDMENTS 15.1. Approval Requirements. Except as otherwise provided herein, this Declaration may be amended only by the approval of: 15.1.1. The Board. 15.1.2. Owners of Units to which are allocated at least sixty-seven percent of the total votes in the Association. 15.1.3. Declarant pursuant to Section 14.7. 15.2. Procedures. Approval of the Owners may be obtained in writing or at a meeting of the Association duly held in accordance with the Bylaws. Consent of the Declarant shall be in 145 33 writing. Any amendment shall be subject to any greater requirements imposed by the Act. The amendment shall be effective when recorded as provided in the Act. An affidavit by the Secretary or President of the Association as to the outcome of the vote, or the execution of the foregoing agreements or consents, shall be adequate evidence thereof for all purposes, including without limitation, the recording of the amendment. SECTION 16 MISCELLANEOUS 16.1. Severability. If any term, covenant, or provision of this instrument or any exhibit attached hereto is held to be invalid or unenforceable for any reason whatsoever, such determination shall not be deemed to alter, affect or impair in any manner whatsoever any other portion of this Declaration or exhibits attached hereto. 16.2. Construction. Where applicable, the masculine gender of any word used herein shall mean the feminine or neutral gender, or vice versa, and the singular of any word used herein shall mean the plural, or vice versa. References to the Act, or any section thereof, shall be deemed to include any statutes amending or replacing the Act, and the comparable sections thereof. Any amendment to the Act shall retroactively apply to the Association and the Property, except as expressly prohibited or qualified by the Governing Documents. 16.3. Tender of Claims. In the event that any incident occurs which could reasonably give rise to a demand by the Association against Declarant for indemnification pursuant to the Act, the Association shall promptly tender the defense of the action to its insurance carrier, and give Declarant (i) written notice of such tender, (ii) written notice of the specific nature of the action, and (iii) an opportunity to defend against the action. 16.4. Notices. Unless specifically provided otherwise in the Governing Documents or the Act, all notices required to be given by or to the Association, the Board, the Association officers, or the Owners or Occupants shall be (i) in writing and shall be effective upon hand delivery, or mailing if properly addressed with postage prepaid and deposited in the United States mail, or (ii) by electronic means and shall be effective when sent, as and if authorized by the Bylaws and Minnesota Statutes Chapter 317A; except that registrations pursuant to Section 2.2 of the Bylaws shall be effective upon receipt by the Association. 16.5. Conflicts Among Documents. In the event of any conflict among the provisions of the Act, the Declaration, the Bylaws and any Rules or Regulations, the Act shall control unless it permits one or more of the Governing Documents to control. As among the Declaration, the Bylaws and any Rules and Regulations, the Declaration shall control, and as between the Bylaws and any Rules and Regulations, the Bylaws shall control. 16.6. Duration of Covenants. The covenants, conditions, restrictions, easements, liens and charges contained in this Declaration shall be perpetual, subject only to termination as provided in this Declaration and the Act. 146 34 IN WITNESS WHEREOF, the undersigned has executed this instrument the day and year first set forth in accordance with the requirements of the Act. Orono Garage Condos, LLC a Minnesota limited liability company By: Name: Title: This Instrument Was Drafted By: Chanin Law Firm, P.A. 18171 82nd Place North Maple Grove, Minnesota 55311 (612) 963 7707 ed@chaninlaw.com 147 35 EXHIBIT A TO DECLARATION COMMON INTEREST COMMUNITY NO. _______ ORONO GARAGE CONDOMINIUMS SCHEDULE OF UNITS AND PERCENTAGE INTERESTS IN VOTING RIGHTS, COMMON EXPENSE OBLIGATIONS AND UNDIVIDED INTERESTS IN COMMON ELEMENTS: Unit Number Approximate Square Footage (exclusive of optional mezzanine level) Percentage Interest in Voting Rights, Common Expense Liability and Undivided Interest in Common Elements % % % % % % % % % % TOTAL 100.0% 148 36 EXHIBIT B TO DECLARATION COMMON INTEREST COMMUNITY NO. ________ ORONO GARAGE CONDOMINIUMS UNDERLYING LEGAL DESCRIPTION OF PROPERTY __, HENNEPIN COUNTY, MINNESOTA. 149 37 EXHIBIT C TO DECLARATION COMMON INTEREST COMMUNITY NO. ________ ORONO GARAGE CONDOMINIUMS LEGAL DESCRIPTION OF ADDDITIONAL REAL ESTATE Lots 1 through 12 inclusive, Block 1, Orono Industrial Park including Adjacent Vacant Road; Also the East 460.5 feet of the West 94 Rods of the South Half of the Northeast Quarter of Section 33, Township 118, Range 23 PID No. 3311823130015 (Confirm Legal) 150 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C1.0 C1.0ORONO GARAGE CONDOSSITE PLANCOVER SHEET03/03/2025 24015 LEHMRHSITE PLAN LOT 1, BLOCK 1, CRYSTAL BAY BUSINESS CENTER HENNEPIN COUNTY, STATE OF MINNESOTA SHEET INDEX C1.0 COVER SHEET C2.0 EXISTING SITE AND DEMO PLAN C3.0 PROPOSED SITE PLAN C3.1 PROPOSED UTILITY PLAN C3.2 SANITARY SEWER PLAN AND PROFILE C3.3 STORM SEWER PLAN AND PROFILE C4.0 PROPOSED GRADING & EROSION C4.1-C4.4 DETAILED GRADING PLAN C4.5 DETAILED POND PLAN C5.0 - C5.2 CONSTRUCTION DETAILS CONTACT LIST OWNER ORONO GARAGE CONDOS 5840 CLUB VALLEY ROAD SHOREWOOD, MN 55331 (952) 200-6384 CONTACT: DAVE RAMSEY, ROB PAGE CIVIL ENGINEER HAGSTROM ENGINEERING 219 6TH AVENUE E ALEXANDRIA, MN 56308 320-759-0764 CONTACT: MATT HAGSTROM SITE OLD CRYSTAL BAY RD NWAYZATA BLVD WILLOW DRIVE NSTATE HWY 12 EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 151 OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 TEMPUS ORONO LLC PID: 3311823130020 METRO STORAGE ORONO LLC PID: 3311823130019 WJM PROPERTIES LLC PID: 3311823130015 ORONO PRESERVE RESIDENTIAL DEVELOPMENT ORONO INDUSTRIAL BOULEVARD ST ST ST PROPOSED IMPROVEMENTS SHOWN AS EXISTING EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 22.0' DRAINAGE & UTILITY EASEMENT S89°43'30"E 1,898.43'N00°16'00"E 1,898.43'N 5 5 ° 2 3 ' 0 7 " W 1 , 8 9 8 . 4 3 ' N89°11'02"W 1,898.43'S00°14'12"W 1,898.43'EX. 8" WATER MAIN, T.R. (TYP) EX. 8" WATER STUB, T.R. EX. 8" WATER STUB, T.R. EX. SAN. MH WITH 8" MAIN, T.R. EX. 8" SAN., T.R. (TYP) EX. BOUNDARY (TYP) EX. 60.0' ROW EX. 66.0' ROW EX. STORM SEWER, T.R. (TYP) EX. CULVERT, 41.4 LF T.B.R. EX. BOUNDARY (TYP) EX. FENCE, T.B.R. EX. STORM SEWER STRUCTURES, T.R. (TYP) EX. WALL, T.R. (TYP) EX. FENCE, T.B.R. EX. WALK, T.R. (TYP) EX. CURB & GUTTER, T.R. (TYP) EX. FIRE HYD., T.R. (TYP) EX. FENCE, T.R. (TYP) EX. CURB & GUTTER, 48 LF T.B.R. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C2.0 C2.0ORONO GARAGE CONDOSSITE PLANEXISTING SITE AND DEMO PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' EXISTING PROPERTY BOUNDARY EXISTING RIGHT OF WAY EXISTING LOT EXISTING EASEMENT EXISTING STORM SEWER W/ MANHOLE EXISTING SANITARY SEWER W/ MANHOLE EXISTING WATER MAIN W/ VALVE & HYDRANT EXISTING ELECTRIC EXISTING ELECTRICAL PEDESTAL EXISTING GAS EXISTING TELEPHONE EXISTING CONCRETE EXISTING ASPHALT EXISTING FENCE EXISTING CURB & GUTTER DEMO CULVERT DEMO FENCE DEMO CURB & GUTTER EXISTING TYPICAL TO REMAIN TO BE REMOVED EX. (TYP) T.R. T.B.R. S E NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION, SEE SHEET C4.0. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.SEE SHEET C5.0 - C5.2 FOR CONSTRUCTION DETAILS. ST LEGEND EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 152 OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 TEMPUS ORONO LLC PID: 3311823130020 METRO STORAGE ORONO LLC PID: 3311823130019 WJM PROPERTIES LLC PID: 3311823130015 ORONO PRESERVE RESIDENTIAL DEVELOPMENT ORONO INDUSTRIAL BOULEVARD PROPOSED IMPROVEMENTS SHOWN AS EXISTING EX. 10.0' EASEMENT EX. 10.0' EASEMENT EX. 10.0' EASEMENT EX. 22.0' EASEMENT S89°43'30"E 1,898.43'N00°16'00"E 1,898.43'N 5 5 ° 2 3 ' 0 7 " W 1 , 8 9 8 . 4 3 ' N89°11'02"W 1,898.43'S00°14'12"W 1,898.43'20.0' SETBACK 35.0' SETBACK 35.0' SETBACK 10.0' SETBACK EX. BOUNDARY EX. BOUNDARY EX. 60.0' ROW EX. 66.0' ROW 40.0' 50.0' 50.0'50.0' 20.0'20.0' 4.0' CONCRETE APRON (TYP) 40.0' 240.0' 20.0'20.0' 46.0' 275.0'275.0' 92.0' 92.0' 275.0' 275.0'260.0' 3.0' CONCRETE PAN (TYP) 32.0' R25.0' R20.0' 14.5' ASPHALT 20.0' 20.0' 31.0' 31.0'31.0' 24.0'24.0' 31.0' 24.0' 31.0' 24.0' 20.0' 20.0' PROPOSED IFC TURNAROUND AT ENTRANCE 40.0' 46.0' 11.5' ASPHALT 8.5' ASPHALT 8.5' ASPHALT BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 PROPOSED FENCE PER CITY OF ORONO STANDARDS (TYP) SLIDING GATE W/ ELECTRONIC ACCESS, DESIGNED BY OTHERS PROPOSED FENCE PER CITY OF ORONO STANDARDS (TYP) PROPOSED FENCE PER CITY OF ORONO STANDARDS (TYP)PROPOSED RETAINING WALL 27.5' ASPHALT 11.5' ASPHALT 27.5' ASPHALT 11.5' ASPHALT 27.5' ASPHALT MAIN DRIVE SECTION N.T.S ℄ 10.0'10.0' ASPHALT SECTION PER SHEET C5.0 CONCRETE V-PAN PER SHEET C5.0 2.0% - 4.0%2.0% - 4.0% TIE-IN TO ADJACENT, VARYING SLOPE (TYP) I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C3.0 C3.0ORONO GARAGE CONDOSSITE PLANPROPOSED SITE PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION, SEE SHEET C4.0. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.SEE SHEETS L1.0 - L1.1 FOR DETAILED LANDSCAPE PLANS. 6.SEE SHEETS C5.0 - C5.2 FOR CONSTRUCTION DETAILS. LEGEND EXISTING PROPERTY BOUNDARY EXISTING RIGHT OF WAY EXISTING EASEMENT PROPOSED CONCRETE EXISTING ASPHALT PROPOSED ASPHALT PROPOSED FENCE EXISTING FENCE EXISTING CURB & GUTTER EXISTING TYPICAL EX. (TYP) EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 153 OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129SFORONO INDUSTRIAL BOULEVARD ST ST STWFWFWFWFWFWSSSSSSSFWFW EX. BOUNDARY (TYP) EX. STORM SEWER (TYP) 8" GATE VALVE N: 171,394.94 E: 445,856.86 8" TEE W/ TB N: 171,395.01 E: 445,842.14 8" TEE W/ TB N: 171,395.69 E: 445,700.14 8" GATE VALVE N: 171,395.87 E: 445,663.988" 90° BEND W/ TB & 6" REDUCER N: 171,396.65 E: 445,499.95 CONNECT TO EX. WATER N: 171,400.01 E: 445,842.17 CONNECT TO EX. WATER N: 171,400.69 E: 445,700.16 5.0 LF~8" C900 WATER MAIN 14.7 LF~8" WATER MAIN 137.2 LF~8" WATER MAIN 125.4 LF~8" WATER MAIN 5.0 LF~8" C900 WATER MAIN BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 8" X 6" TEE W/ TB N: 171,396.05 E: 445,625.39 8" X 6" TEE W/ TB N: 171,396.01 E: 445,633.39 8" X 6" TEE W/ TB N: 171,395.42 E: 445,757.14 8" X 6" TEE W/ TB N: 171,395.38 E: 445,765.14 8" X 6" TEE W/ TB N: 171,394.74 E: 445,899.14 8" X 6" TEE W/ TB N: 171,394.70 E: 445,907.14 8" 90° BEND W/ TB & 6" REDUCER N: 171,394.04 E: 446,044.34 8.0 LF~8" WATER MAIN 36.2 LF~8" WATER MAIN 8.0 LF~8" WATER MAIN 30.6 LF~8" WATER MAIN 57.0 LF~8" WATER MAIN 8.0 LF~8" WATER MAIN 77.0 LF~8" WATER MAIN 42.3 LF~8" WATER MAIN METER PIT N: 171,390.24 E: 445,503.95 METER PIT N: 171,389.58 E: 445,620.36 METER PIT N: 171,389.49 E: 445,638.36 METER PIT N: 171,388.94 E: 445,752.11 METER PIT N: 171,388.85 E: 445,770.11 METER PIT N: 171,388.26 E: 445,894.11 METER PIT N: 171,388.18 E: 445,912.11 METER PIT N: 171,387.56 E: 446,040.31 TYPICAL FIRE SERVICE TYPICAL WATER SERVICE SANITARY MAIN (TYP) SANITARY SERVICE (TYP) WET TAP (TYP)WET TAP (TYP) I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C3.1 C3.1ORONO GARAGE CONDOSSITE PLANPROPOSED UTILITY PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' LEGEND EXISTING STORM SEWER, MANHOLE, F.E.S. AND INLET PROPOSED STORM SEWER, MANHOLE, F.E.S. AND INLET EXISTING ROW PROPOSED ROW EXISTING LOT LINE PROPOSED LOT LINE PROPERTY BOUNDARY PROPERTY SETBACK EXISTING EASEMENT PROPOSED EASEMENT PROPOSED SANITARY SEWER W/ MH EXISTING SANITARY SEWER W/ MH PROPOSED UNDERDRAIN AND CLEANOUT PROPOSED WATER LINE, VALVE AND FIRE HYDRANT EXISTING WATER LINE AND VALVE PROPOSED WATER SERVICE W/ METER PROPOSED SANITARY SERVICE EXISTING GAS LINE EXISTING OVERHEAD ELECTRIC EXISTING ELECTRIC EXISTING CABLE TV EXISTING FIBER OPTIC EXISTING TELEPHONE TYPICAL CAUTION! UTILITY CROSSING LOWERING MAY BE REQUIRED EXISTING LIGHT POLE PROPOSED LIGHT POLEWSS NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION, SEE SHEET C4.0. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.ALL UTILITIES WITHIN PROPERTY BOUNDARIES ARE PRIVATE. 6.ALL WATER SERVICES ARE 10 LF, XX" DIAMETER UNLESS OTHERWISE NOTED. 7.ALL FIRE SERVICES ARE 10 LF, 6" DIAMETER W/ GATE VALVE UNLESS OTHERWISE NOTED. 8.ALL WATER MAINS ARE 8" DIAMETER, MAINTAIN POSITIVE GRADE, 8' MIN. COVER. 9.ALL WATER MAINS AND SERVICES SHALL MEET AWWA C900 QUALITY STANDARD. 10.AN ACCESSIBLE BLUE 14 AWG MINIMUM TRACER WIRE SUITABLE FOR DIRECT BURY MUST BE USED 11.SEE SHEET C5.0 - C5.2 FOR CONSTRUCTION DETAILS. TYP EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 154 SFST ST STWFWFWFWFWFWSSSSSSSFWFW EX. BOUNDARY (TYP) 15+249+70 10+00 11+00 12+00 13+00 14+00 15+00PI: 12+55.59S SSMH-1 4' SSMH N: 171,406.55 E: 445,522.19 CONNECT TO EX. SSMH-1 4' SSMH N: 171,410.28 E: 445,777.76 SSMH-2 4' SSMH N: 171,404.18 E: 446,016.19 ORONO INDUSTRIAL BOULEVARD OLD CRYSTALBAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 8" SDR 35 8" SDR 35 EX. 60.0' ROW EX. 66.0' ROW PROP. 6" SANITARY SERVICE W/CO (TYP) BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 8"X6" WYE (TYP) ALIGNMENT NAME: Sanitary 1 PROFILE HORIZONTAL SCALE: 50.00 VERTICAL SCALE: 5.00 GRAPH VERTICAL EXAGGERATION: 10.00 STATION RANGE: 9+00 - 16+00 PROFILE VIEW ELEVATION RANGE: 1005.00 - 1035.00 1005 1010 1015 1020 1025 1030 1035 1005 1010 1015 1020 1025 1030 1035 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 SSMH-1 4' SSMH RIM:1026.07± INV OUT:1014.18 (8" PVC) (E) CUT=11.9± EX. SSMH-1 4' SSMH RIM:1024.56± INV IN:1012.90 (8" PVC) (E) INV IN:1012.90 (8" PVC) (W) INV OUT:1012.70 (8" PVC) (N) CUT=11.9± SSMH-2 4' SSMH RIM:1022.00± INV OUT:1014.09 (8" PVC) (W) CUT=7.9± 255.6 LF~ 8" SDR 35 @ 0.50%238.5 LF~ 8" SDR 35 @ 0.50% PROPOSED GRADE @ SANITARY ℄ EXISTING GROUND @ SANITARY ℄ 2.8' 1.6' EX. 8" WATER APPROX. DEPTH EX. 8" WATER APPROX. DEPTH I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.2C3.2 C3.2ORONO GARAGE CONDOSSITE PLANSANITARY SEWER PLAN AND PROFILE03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 25 50 100 50' LEGEND EXISTING STORM SEWER, MANHOLE, F.E.S. AND INLET PROPOSED STORM SEWER, MANHOLE, F.E.S. AND INLET EXISTING ROW PROPOSED ROW EXISTING LOT LINE PROPOSED LOT LINE PROPERTY BOUNDARY PROPERTY SETBACK EXISTING EASEMENT PROPOSED EASEMENT PROPOSED SANITARY SEWER W/ MH EXISTING SANITARY SEWER W/ MH PROPOSED UNDERDRAIN AND CLEANOUT PROPOSED WATER LINE, VALVE AND FIRE HYDRANT EXISTING WATER LINE AND VALVE PROPOSED WATER SERVICE W/ METER PROPOSED SANITARY SERVICE EXISTING GAS LINE EXISTING OVERHEAD ELECTRIC EXISTING ELECTRIC EXISTING CABLE TV EXISTING FIBER OPTIC EXISTING TELEPHONE EXISTING IRRIGATION CAUTION! UTILITY CROSSING LOWERING MAY BE REQUIRED EXISTING LIGHT POLE PROPOSED LIGHT POLEWSS NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION, SEE SHEET C4.0. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.ALL SANITARY SEWER SERVICES ARE 4" DIAMETER WITH 2% SLOPE AND A STANDARD 1.2' WYE CONNECTION TO THE 8" PRIVATE MAIN UNLESS OTHERWISE NOTED. 6.ALL SANITARY MAIN LINES SHALL MEET ASTM D1785 QUALITY STANDARD. 7.SOLVENT WELDED JOINTS MUST USE ASTM F656 PURPLE PRIMER AND ASTM D2564 CEMENT. 8.SEWER MUST BE INSTALLED BY OPEN-TRENCH ON A CONTINUOUS GRANULAR BED. 9.SEE SHEET C5.0 - C5.2 FOR CONSTRUCTION DETAILS. EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 155 SFST ST STWFWFWFWFWFWSSSSSSSFWFW EX. BOUNDARY (TYP) S ORONO INDUSTRIAL BOULEVARD OLD CRYSTALBAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 10.0' DRAINAGE & UTILITY EASEMENT EX. 22.0' DRAINAGE & UTILITY EASEMENT 20.0' SETBACK EX. 60.0' ROW EX. 66.0' ROW BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 9+70 10+00 11+00 12+00 13+00 14+00 14+83BP: 9+70.00PI: 13+98.26EP: 14+82.58CB-1 4' SD STMH W/ R-3362-L GRATE N: 171,096.83 E: 445,696.75 CB-2 4' SD STMH W/ R-3362-L GRATE N: 171,094.80 E: 445,838.74 CB-3 4' SD STMH W/ R-3362-L GRATE N: 171,092.78 E: 445,980.74 24" DWPP 24" DWPP 36" DWPP PROPOSED 8" SANITARY (TYP) PROPOSED SANITARY MH (TYP) PROPOSED POND. SEE SHEET C4.5. EX. STORM SEWER (TYP) PROPOSED 8" WATER (TYP) EX. 10.00' DRAINAGE & UTILITY EASEMENT PROPOSED FOREBAY. SEE SHEET C4.5. PROPOSED GRADE @ STORM ℄ EXISTING GROUND @ STORM ℄ ALIGNMENT NAME: Storm 1 PROFILE HORIZONTAL SCALE: 50.00 VERTICAL SCALE: 5.00 GRAPH VERTICAL EXAGGERATION: 10.00 STATION RANGE: 9+50 - 15+50 PROFILE VIEW ELEVATION RANGE: 1010.00 - 1035.00 1010 1015 1020 1025 1030 1035 1010 1015 1020 1025 1030 1035 9+50 10+00 11+00 12+00 13+00 14+00 15+00 15+50 142.0 LF~24" DWPP @ 0.50% 142.0 LF~24" DWPP @ 0.50% 22.0 LF~36" DWPP @ 0.50% CB-1 4' SD STMH W/ R-3362-L GRATE RIM:1023.14± INV OUT:1019.64 (24" PVC) (E) CUT=3.5± CB-2 4' SD STMH W/ R-3362-L GRATE RIM:1022.42± INV IN:1018.93 (24" PVC) (W) INV OUT:1018.73 (24" PVC) (E) CUT=3.7± CB-3 4' SD STMH W/ R-3362-L GRATE RIM:1021.71± INV IN:1018.02 (24" PVC) (W) INV OUT:1017.21 (36" PVC) (E) CUT=4.5± I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.2C3.3 C3.3ORONO GARAGE CONDOSSITE PLANSTORM SEWER PLAN AND PROFILE03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 25 50 100 50' LEGEND EXISTING STORM SEWER, MANHOLE, F.E.S. AND INLET PROPOSED STORM SEWER, MANHOLE, F.E.S. AND INLET EXISTING ROW PROPOSED ROW EXISTING LOT LINE PROPOSED LOT LINE PROPERTY BOUNDARY PROPERTY SETBACK EXISTING EASEMENT PROPOSED EASEMENT PROPOSED SANITARY SEWER W/ MH EXISTING SANITARY SEWER W/ MH PROPOSED UNDERDRAIN AND CLEANOUT PROPOSED WATER LINE, VALVE AND FIRE HYDRANT EXISTING WATER LINE AND VALVE PROPOSED WATER SERVICE W/ METER PROPOSED SANITARY SERVICE EXISTING GAS LINE EXISTING OVERHEAD ELECTRIC EXISTING ELECTRIC EXISTING CABLE TV EXISTING FIBER OPTIC EXISTING TELEPHONE TYPICAL CAUTION! UTILITY CROSSING LOWERING MAY BE REQUIRED EXISTING LIGHT POLE PROPOSED LIGHT POLEWSS NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION, SEE SHEET C4.0. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.ALL STORM SEWER SHALL BE PRIVATE ADS DUAL WALL HIGH PERFORMANCE POLYPROPYLENE PIPE. 6.ALL CATCH BASINS SHALL BE PRIVATE 48" SHALLOW DEPTH W/ R-3362 VALLEY GRATE. 7.STORM SEWER MUST BE INSTALLED BY OPEN-TRENCH ON A CONTINUOUS GRANULAR BED. 8.SEE SHEET C5.0 - C5.2 FOR CONSTRUCTION DETAILS. TYP EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 156 OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 WJM PROPERTIES LLC PID: 3311823130015 ORONO PRESERVE DEVELOPMENT ORONO INDUSTRIAL BOULEVARD ST ST ST PROPOSED IMPROVEMENTS SHOWN AS EXISTING EX. BOUNDARY EX. BOUNDARY 1021 1017102310231021 1025 1020 1020 1027 10261028 1028102810261019 1018 10241026 1023. 9 7 1023. 7 7 1023.14 1022.42 1021.71 1021. 6 2 1025. 2 5 1025. 2 5 1024.59 1023. 8 7 1023. 1 7 1023. 1 5 PROPOSED BUILDING 1 FFE = 1025.79 PROPOSED BUILDING 2 FFE = 1026.00 PROPOSED BUILDING 3 FFE = 1025.06 PROPOSED BUILDING 4 FFE = 1024.35 PROPOSED BUILDING 5 FFE = 1023.68 1025.87 ME 1025.34 ME 1025.12 TOC 1025.04 TOC 1020.46 TOW 4.1% 7.3% 5.8% 5.6% 7.3% 5.0% 3.1% 4.7% 7.6% 4.4% 5.6% 4.5% 7.6% 5.2% 4.7%0.5%0.5%0.6%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5% 2.0%12.2%10.0% 10.5% 10.5%10.0%33.3%33.3% 33.3%3.8%10216.1%11.2%3.6%3.4%2.1%3.3%2.1%2.1%2.1%2.1%33.3%1.8%2.1%8.3%7.5%6.9%3.4%2.0%0.1%SF SF SF SF SF IP IP VTC CWA 1 0 2 2 1021 33.3%33.0%2.0%4.0%2.1%4.3%3.6%3.1%3.9%2.3% PROPOSED BUILDING 1 FFE = 1025.12 PROPOSED BUILDING 2 FFE = 1025.33 PROPOSED BUILDING 2 FFE = 1025.33 PROPOSED BUILDING 2 FFE = 1024.66 PROPOSED BUILDING 3 FFE = 1023.72 PROPOSED BUILDING 3 FFE = 1024.39 PROPOSED BUILDING 4 FFE = 1023.67 PROPOSED BUILDING 4 FFE = 1023.01 PROPOSED BUILDING 5 FFE = 1023.01 PROPOSED BUILDING 5 FFE = 1022.34 8" STEP 8" STEP 8" STEP 8" STEP 8" STEP 8" STEP 8" STEP 8" STEP 8" STEP 2.1%2.3% IP IP IP 4.5% 2.7% 3.3% 7.6%10241024 1021 IP HP 1025.33 1019.21 BOW 1020.69 TOW 1018.55 BOW 1021.05 TOW 1018.75 BOW 1021.37 TOW 1018.92 BOW 1021.00 TOW 1019.02 BOW ??? TOW ??? BOW ECB ECB 1026.11 1025.76 1025.30 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.0 C4.0ORONO GARAGE CONDOSSITE PLANPROPOSED GRADING & EROSIONCONTROL PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' GRADING NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.ALL ELEVATIONS ARE FLOWLINE UNLESS OTHERWISE NOTED 4.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 5.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 6.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS PROPOSED SPOT ELEVATION FLOW DIRECTION & GRADE FINISHED FLOOR ELEVATION MATCH EXISTING TOP OF CONCRETE HIGH POINT TOP OF WALL BOTTOM OF WALL LIMITS OF DISTURBANCE SILT FENCE 1,000 LF INLET PROTECTION 5 EA VEHICLE TRACKING CONTROL 1 EA EROSION CONTROL BLANKET 550 SY CONCRETE WASHOUT AREA 1 EA FFE ME TOC HP TOW BOW 1432. 3 1431 1430 1431 1430 2.00% EROSION CONTROL NOTES: 1.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 2.SEE SHEET C5.0 FOR BMP DETAILS AND BMP MAINTENANCE NOTES. 3.THE CONTRACTOR SHALL PERFORM STREET SWEEPING AT THE END OF EACH WORK DAY TO MITIGATE ANY SOIL ON PERIMETER STREETS. 4.THE CONTRACTOR SHALL INSPECT THE BMP'S WEEKLY OR AFTER ANY SIGNIFICANT RAIN EVENT AND REPAIR BMP'S AS REQUIRED. 5.STOCKPILE AND STAGING LOCATION TO BE APPROVED BY ENGINEER. 6.ALL DISTURBED AREAS THAT ARE NOT HARDSCAPED SHALL RECEIVE PERMANENT STABILIZATION PER LANDSCAPE PLAN. 7.SEE SWPPP DOCUMENT BY HAGSTROM ENGINEERING FOR SEEDING, INSPECTION, AND MAINTENANCE REQUIREMENTS. . SF IP VTC CWA ECB EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 157 10251028 1026 PROPOSED BUILDING 1 FFE = 1025.79 PROPOSED BUILDING 2 FFE = 1026.00 1025.79 TOC 1025.71 TOC 1025.92 TOC 1026.00 TOC 1025.12 TOC 1025.04 TOC 1025.25 TOC 1025.33 TOC 1024.66 TOC 1024.58 TOC 1025.25 TOC 1025.33 TOC1.3%2.0%2.0%2.0%12.2%10.0%23.4%10.5%10.0% 4.0% 6.1% 11.2% 5.4%10221025.12 TOC 1025.79 TOC PROPOSED BUILDING 1 FFE = 1025.12 PROPOSED BUILDING 2 FFE = 1025.33 PROPOSED BUILDING 2 FFE = 1025.33 PROPOSED BUILDING 2 FFE = 1024.66 1025.71 TOC1025.09 TOC 1025.92 TOC 1026.00 TOC 1025.25 TOC 1025.33 TOC 1025.33 TOC 1025.25 TOC 1024.64 TOC 1024.66 TOC 8" STEP 8" STEP 8" STEP2.0%10241025.12 TOC 1025.06 TOC 1025.12 TOC 1025.07 TOC 1025.12 TOC 1025.08 TOC 1025.12 TOC 1025.08 TOC 1025.21 TOA 1025.21 TOA 6" STEP 1025.71 TOC 1025.79 TOC 0.7%2.0%1025.79 TOC 1025.71 TOC 1025.79 TOC 1025.71 TOC2.0%2.0%1025.79 TOC 1025.71 TOC 1024.70 1025.20 1025.20 1024.70 1025.201024.50 1024.00 10.5%2.1%2.6%1024.50 1024.00 1025.25 TOC 1025.33 TOC 2.0%2.0%2.0%2.0%2.0%1025.42 TOA 6" STEP 1025.25 TOC 1025.33 TOC 1025.25 TOC 1025.33 TOC 1025.92 TOC 1026.00 TOC 1025.92 TOC 1026.00 TOC 1025.92 TOC 1026.00 TOC 1024.66 TOC 1024.59 TOC 1024.66 TOC 1024.61 TOC 1024.66 TOC 1024.63 TOC 1025.33 TOC 1025.25 TOC 1025.33 TOC 1025.25 TOC1.2%1.2%2.0%0.5%2.0%1024.75 TOA 1024.83 TOA 1025.50 TOA 2.0%6" STEP I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.1 C4.1ORONO GARAGE CONDOSSITE PLANDETAILED GRADING PLANBUILDING 1 & 203/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 5 10 20 10' GRADING NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.ALL ELEVATIONS ARE FLOWLINE UNLESS OTHERWISE NOTED 4.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 5.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 6.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS PROPOSED SPOT ELEVATION FLOW DIRECTION & GRADE 1432. 3 1431 1430 1431 1430 2.00% FINISHED FLOOR ELEVATION MATCH EXISTING TOP OF CONCRETE TOP OF ASPHALT HIGH POINT TOP OF WALL BOTTOM OF WALL FFE ME TOC TOA HP TOW BOW EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 158 PROPOSED BUILDING 3 FFE = 1025.06 1025.06 TOC 1024.98 TOC 1023.64 TOC 1023.72 TOC 1023.72 TOC 1023.64 TOC 1025.06 TOC 1024.98 TOC2.0%2.0%2.0%12.7% 3.6% PROPOSED BUILDING 3 FFE = 1023.72 1024.39 TOC PROPOSED BUILDING 3 FFE = 1024.39 1024.31 TOC 1024.98 TOC 1025.06 TOC 1024.31 TOC 1024.39 TOC 1024.39 TOC 1024.31 TOC 1025.06 TOC 1024.98 TOC 1024.31 TOC 1024.39 TOC 1023.64 TOC 1023.72 TOC 1023.68 TOC 1023.72 TOC 8" STEP 8" STEP2.0%1024.31 TOC 1024.39 TOC 1024.31 TOC 1024.39 TOC 1024.98 TOC 1025.06 TOC 1024.98 TOC 1025.06 TOC2.0%2.0%2.0%2.0%1024.48 TOA 1024.57 TOA 6" STEP6" STEP 1023.81 TOA 1023.89 TOA 1024.39 TOC 1024.31 TOC 1024.39 TOC 1024.31 TOC 1025.06 TOC 1024.98 TOC 1025.06 TOC 1024.98 TOC 2.0%2.0%2.0%2.0%2.0%1024.48 TOA 1024.56 TOA 1023.81 TOA 1023.89 TOA 6" STEP6" STEP 2.0%8" STEP 8" STEP I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.2 C4.2ORONO GARAGE CONDOSSITE PLANDETAILED GRADING PLANBUILDING 303/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 5 10 20 10' GRADING NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.ALL ELEVATIONS ARE FLOWLINE UNLESS OTHERWISE NOTED 4.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 5.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 6.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS PROPOSED SPOT ELEVATION FLOW DIRECTION & GRADE 1432. 3 1431 1430 1431 1430 2.00% FINISHED FLOOR ELEVATION MATCH EXISTING TOP OF CONCRETE TOP OF ASPHALT HIGH POINT TOP OF WALL BOTTOM OF WALL FFE ME TOC TOA HP TOW BOW EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 159 PROPOSED BUILDING 4 FFE = 1024.35 2.0%12.7% 3.4% PROPOSED BUILDING 4 FFE = 1023.67 PROPOSED BUILDING 4 FFE = 1023.01 8" STEP 8" STEP 2.0%1024.35 TOC 1024.27 TOC 1022.93 TOC 1023.01 TOC 2.0%1023.68 TOC 1023.60 TOC 1024.27 TOC 1024.35 TOC 1023.60 TOC 1023.68 TOC 1022.99 TOC 0.6% 1023.60 TOC 1023.68 TOC 1023.60 TOC 1023.68 TOC 1024.27 TOC 1024.35 TOC 1024.27 TOC 1024.35 TOC2.0%2.0%2.0%2.0%1023.77 TOA 1023.85 TOA 6" STEP6" STEP 1023.10 TOA 1023.18 TOA 2.0%1023.01 TOC 1022.93 TOC 1024.35 TOC 1024.27 TOC2.0%2.0%1023.68 TOC 1023.60 TOC 1024.35 TOC 1024.27 TOC 1023.60 TOC 1023.68 TOC 1022.93 TOC 1023.01 TOC 1023.68 TOC 1023.60 TOC 1023.68 TOC 1023.60 TOC 1024.35 TOC 1024.27 TOC 1024.35 TOC 1024.27 TOC 2.0%2.0%2.0%2.0%1023.77 TOA 1023.85 TOA 1023.10 TOA 1023.18 TOA 6" STEP6" STEP 2.0%8" STEP 8" STEP I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.3 C4.3ORONO GARAGE CONDOSSITE PLANDETAILED GRADING PLANBUILDING 403/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 5 10 20 10' GRADING NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.ALL ELEVATIONS ARE FLOWLINE UNLESS OTHERWISE NOTED 4.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 5.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 6.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS PROPOSED SPOT ELEVATION FLOW DIRECTION & GRADE 1432. 3 1431 1430 1431 1430 2.00% FINISHED FLOOR ELEVATION MATCH EXISTING TOP OF CONCRETE TOP OF ASPHALT HIGH POINT TOP OF WALL BOTTOM OF WALL FFE ME TOC TOA HP TOW BOW EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 160 ST1017 10231023 1020PROPOSED BUILDING 5 FFE = 1023.68 1023.68 TOC 1022.34 TOC 2.0%2.0%33.3%33.3%33.3%1021 PROPOSED BUILDING 5 FFE = 1023.01 PROPOSED BUILDING 5 FFE = 1022.34 8" STEP 8" STEP 1023.60 TOC 1022.26 TOC 2.0%1023.01 TOC 1022.93 TOC 1023.60 TOC 1023.68 TOC 1022.93 TOC 1023.01 TOC 1022.26 TOC 2.0%1022.93 TOC 1023.01 TOC 1022.93 TOC 1023.01 TOC 1023.60 TOC 1023.68 TOC 1023.60 TOC 1023.68 TOC2.0%2.0%2.0%2.0%1023.10 TOA 1023.18 TOA 6" STEP6" STEP 1022.43 TOA 1022.51 TOA 2.0%1021.50 1021.501021.501021.501021.50 EXPOSE FOUNDATIONEXPOSE FOUNDATION 1023.60 TOC 1023.68 TOC BOW=1022.00 1022.99 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.4 C4.4ORONO GARAGE CONDOSSITE PLANDETAILED GRADING PLANBUILDING 503/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 5 10 20 10' GRADING NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.ALL ELEVATIONS ARE FLOWLINE UNLESS OTHERWISE NOTED 4.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 5.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 6.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS PROPOSED SPOT ELEVATION FLOW DIRECTION & GRADE 1432. 3 1431 1430 1431 1430 2.00% FINISHED FLOOR ELEVATION MATCH EXISTING TOP OF CONCRETE TOP OF ASPHALT HIGH POINT TOP OF WALL BOTTOM OF WALL FFE ME TOC TOA HP TOW BOW EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 161 STSTST10191018PROPOSED BUILDING 5 FFE = 1023.68 PROPOSED BUILDING 5 FFE = 1023.01 PROPOSED BUILDING 5 FFE = 1022.34 WJM PROPERTIES LLC PID: 3311823130015 MNDOT RIGHT OF WAY PLAT NO 27-129 1023 1 0 2 2 1 0 2 1 1020 101 9 1 0 1 8 10161015101610181023 EX. 22.00' DRAINAGE & UTILITY EASEMENT AA4" SCH 40 PVC CLEANOUT W/ WATERTIGHT CAP RIM=1016.81 INV=1015.35 N: 171,093.28 E: 446,059.81 4" SCH 40 PVC CLEANOUT W/ WATERTIGHT CAP RIM=1016.81 INV=1014.71 N: 171,222.63 E: 446,062.03 4" SCH 40 PVC CLEANOUT W/ WATERTIGHT CAP RIM=1016.81 INV=1015.56 N: 171,093.98 E: 446,018.76 1016EX. 48" RCP FOREBAY. SEE DETAIL THIS SHEET 1 CY CLASS II RIPRAP 129.4 LF ~ 4" SDR35 PERF. PVC @ 0.5% 10.9 LF ~ 4" SDR35 PVC @ 0.5% STORM SEWER. SEE SHEET C3.3. 1023.15 1018.73 1017.47 1017.00 1023.68 1021.50 1021.50 1022.34 1022.090.5%0.5%0.5%0.5%33.3%33.3%33.3%3.8 %10211017 102310231022 102010211021 102010 2 1 101810221020 1022 1018 10211023 1021 33.3%33.3%33.4%28.5%30.5% 33.3%33.3%21.8%8.2%1019 1019 EX. FES INV.= 1014.3 POND BERM (TYP) EMERGENCY SPILLWAY. SEE DETAIL THIS SHEET. 41.1 LF ~ 4" SDR35 PERF. PVC @ 0.5% OUTLET STRUCTURE SEE DETAIL THIS SHEET EXISTING PIPE TO BE REMOVED WITHIN STRUCTURE 62 LF LANDSCAPE WALL 1020.14 TOW 1017.20 BOW 1020.21 TOW 1018.00 BOW 1017.70 TOW 1017.20 BOW EX. 48" RCP EX. STMH WQCV WSEL=1020.87EX. STMH SOUTH SWALE SEE SECTION THIS SHEET NORTH SWALE SEE SECTION THIS SHEET 1021.62 EMERGENCY SPILLWAY N.T.S 2.0'10.0'2.0' EL=1022.0 EL=1021.5 EL=1022.0 WQCV WSEL = 1020.87 MNDOT CATEGORY 90 ROLLED EROSION PREVENTION PRODUCT CONCRETE FOREBAY N.T.S SECTION A-A FILTRATION POND N.T.S. 9.1' POND BOTTOM 1.0' BERM EL=1022.0 MATCH EXISTINGEXISTING GROUND PROPOSED GRADE BOTTOM OF POND EL=1017.0 WQCV WSEL = 1020.87 4.0' SAND AND FILTER MATERIAL 4" PERF. PVC 3:1 MAX UNDERDRAIN DETAIL N.T.S 4"Ø PERFORATED PVC UNDERDRAIN @ 0.5% UNDERDRAIN FLOW DIRECTION 6" MIN. DEPTH MEDIA MIX D 60% COARSE SAND 25% TOPSOIL 15% COMPOST (MnDOT GRADE 2) 4"Ø PVC @ 0.5% 4"Ø STORM CLEANOUT W/ WATERTIGHT CAP 4"Ø STORM CLEANOUT W/ WATERTIGHT CAP 3" #57 STONE, WASHED 2" #8 STONE OUTLET STRUCTURE SOUTH FACE N.T.S 6' X 6' PRECAST BOX W/ REINFORCEMENT BOTTOM OF BOX = 1013.55 7.32' 0.5' 0.5' 7.82' TOP OF BOX = 1020.87 6.0' INLET GRATE (CLOSE MESH) RACK SWIVEL REBAR HINGE IN BACK BOLT DOWN OR LOCK DOWN IN FRONT EX. 48" RCP INV IN & OUT = 1014.47 4" PVC INV IN = 1014.65 OUTLET STRUCTURE 12.0' CLASS II RIPRAP PIPE FLOW CONCRETE HEADWALL TOP EL = 1021.0 BOTTOM EL = 1015.0 0.5' PIPE INV = 1017.0 0.5' INV = 1016.9 MNDOT CATEGORY 70 ROLLED EROSION PREVENTION PRODUCT 4.0' SWALE 10% SLOPE 2-YR DEPTH=0.19' 0.20' SWALE DEPTH MNDOT CL II RIPRAP 4.0' SWALE4% SLOPE 2-YR DEPTH=0.05' 0.08' SWALE DEPTH NORTH SWALE N.T.S SOUTH SWALE N.T.S I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C4.5 C4.5ORONO GARAGE CONDOSSITE PLANDETAILED POND PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20' LEGEND EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY BOUNDARY LOT LINE EXISTING EASEMENT LINE EXISTING 1' AND 5' CONTOURS PROPOSED 1' AND 5' CONTOURS FLOW DIRECTION & GRADE WATER SURFACE ELEVATION TOP OF WALL BOTTOM OF WALL PROPOSED DRAINAGE SWALE WSEL TOW BOW 1411 1410 1411 1410 2.00% NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.INSTALL PERIMETER BMPs PRIOR TO ANY CONSTRUCTION. 3.ALL ELEVATIONS PROVIDED ARE FINISHED GRADE UNLESS OTHERWISE NOTED. 4.SEE SHEETS C5.0 - C5.2 FOR CONSTRUCTION DETAILS. POND NOTES: 1.TO AVOID OVER-COMPACTION OF THE POND, AFTER GRADING THE POND, DO NOT DRIVE HEAVY EQUIPMENT OVER THE POND AREA. 2.THE POND MAY BE UTILIZED AS TEMPORARY SEDIMENTATION BASINS DURING CONSTRUCTION. ALL CONSTRUCTION DEBRIS AND SEDIMENTATION SHALL BE REMOVED FROM POND PRIOR TO FINAL STABILIZATION. 3.REFER TO THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR ORONO GARAGE CONDOS BY HAGSTROM ENGINEERING FOR CONSTRUCTION RELATED BEST MANAGEMENT PRACTICES TO REDUCE SEDIMENT AND EROSION CONTROL. 4.OPERATION AND MAINTENANCE OF THE POND IS REQUIRED FOR LONG-TERM FUNCTIONALITY OF THE POND. PLEASE SEE THE POND OPERATION AND MAINTENANCE PLAN AND CHECKLIST THAT IS INCLUDED IN THE FINAL DRAINAGE REPORT FOR ORONO GARAGE CONDOS BY HAGSTROM ENGINEERING. EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 162 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C5.0 C5.0ORONO GARAGE CONDOSSITE PLANCONSTRUCTION DETAILS03/03/2025 24015 LEHMRHHEAVY DUTY BITUMINOUS PAVEMENT SECTION* N.T.S. 2" WEAR COURSE MIXTURE SPWEA340C 2" NON-WEARING COURSE MIXTURE SPNWA340C 10" AGGREGATE BASE CLASS 5 TACK COAT PER MNDOT 2357 COMPACTED SUBGRADE 3.00' 6" 1" CONCRETE V-PAN DETAIL N.T.S. * PAVEMENT SECTION BASED ON RECOMMENDATION OF GEOTECHNICAL ENGINEER. FINAL APPROVAL OF PAVEMENT SECTION PER OWNER. DEFINITION A DESIGNATED, SHALLOW EXCAVATION WITH A PERIMETER BERM, SILT FENCE, AND VTC, DESIGNED FOR CONCRETE WASHOUT OPERATIONS. PURPOSE TO CONTAIN WASTE FROM CONCRETE TRUCKS, SMALL BATCH CONCRETE MIXERS, PUMP TRUCKS, AND OTHER WASHOUT OPERATIONS. 8'x8' MIN. 3:13:1 9' MIN. 1' MIN. 8'x8' MIN.9' MIN. 3:1 3:1 1' MIN. 2% VEHICLE TRACKING CONTROL. SEE DETAIL VTC. VEHICLE TRACKING CONTROL. SEE DETAIL VTC SILT FENCE AROUND EARTH BERM. SEE DETAIL SF. SILT FENCE AROUND EARTH BERM. SEE DETAIL SF. 3' MIN. EXISTING GRADE COMPACTED EMBANKMENT MATERIAL CONSTRUCTION SIGN (MANDATORY) CONCRETE WASHOUT AREA N.T.S. CWA INSTALL POLY LINER DEFINITION A TEMPORARY SEDIMENT BARRIER PLACED ON-GRADE. PURPOSE TO INCREASE SEDIMENTATION FROM SEDIMENT LADEN RUNOFF AND SLOW THE VELOCITY OF STORM RUNOFF. NOTES 1.SEE DETAIL CS FOR ROCK SOCKS USED IN CURB FLOW LINE. 2.SEE DETAIL IP FOR ROCK SOCKS (CURB SOCK) USED AS ON-GRADE CURB INLET PROTECTION. 3.SEE DETAIL IP-A FOR ROCK SOCKS USED AS SUMP CURB INLET PROTECTION. 4.SEE DETAIL RCS FOR ROCK SOCKS USED AS ROUGH CUT STREET CONTROL. 5.SEE DETAIL CP FOR ROCK SOCKS USED AS CULVERT PROTECTION JOINT DETAIL VARIABLE LENGTH 10" OR 4" WIRE TIE ENDS 3/4" GRAVEL IN 1/4" WIRE MESH 12"12" ANY GAP AT JOINTS SHALL BE FILLED WITH AN ADEQUATE AMOUNT OF 3/4" GRAVEL WRAPPED WITH 1/4" WIRE MESH SECURED TO ENDS OF ROCK SOCK. ROCK SOCK N.T.S. RS EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 163 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C5.1 C5.1ORONO GARAGE CONDOSSITE PLANCONSTRUCTION DETAILS03/03/2025 24015 LEHMRH164 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT C5.0C5.2 C5.2ORONO GARAGE CONDOSSITE PLANCONSTRUCTION DETAILS03/03/2025 24015 LEHMRH165 OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 TEMPUS ORONO LLC PID: 3311823130020 METRO STORAGE ORONO LLC PID: 3311823130019 WJM PROPERTIES LLC PID: 3311823130015 ORONO PRESERVE RESIDENTIAL DEVELOPMENT ORONO INDUSTRIAL BOULEVARD EX. BOUNDARY EX. BOUNDARY 10211017102310231020 1020 PROPOSED BUILDING 1 PROPOSED BUILDING 2 PROPOSED BUILDING 3 PROPOSED BUILDING 4 PROPOSED BUILDING 5 102110.0' GRASS BUFFER PROPOSED TREES (TYP)PROPOSED CONIFERS (TYP) PROPOSED SHRUBS (TYP)PROPOSED PONDNATIVE GRASS (TYP) 10.0' GRASS BUFFER 10.0' GRASS BUFFER NATIVE GRASS (TYP) NATIVE GRASS (TYP) NATIVE GRASS (TYP) PROPOSED CONIFERS (TYP) ROCK (TYP) ROCK (TYP) 8.0' (TYP) 8.0' (TYP) 6.5' (TYP) 8.0' (TYP) 16.0' (TYP) 16.0' (TYP) STAGGER CONIFERS & TREES AS SHOWN (TYP) 16.0' (TYP) 16.0' (TYP) 16.0' (TYP) 16.0' (TYP) RETAINING WALL I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT L1.1L1.0 L1.0ORONO GARAGE CONDOSSITE PLANPROPOSED LANDSCAPE PLAN03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.SEE SHEET C5.0 - C5.2 FOR CONSTRUCTION DETAILS. LEGEND PROPOSED 1' AND 5' CONTOURS PROPOSED TREE PROPOSED SHRUB PROPOSED CONIFER 1431 1430 TREES TYPE CONT QTY Shade Trees 1.5" to 2.0"18 Ornamental 1.0"17 SHRUBS CONT QTY Small Coniferous Shrubs 18" - 24"27 Small Deciduous Shrubs 27 CONIFERS CONT QTY Coniferous Tree 4' - 6'85 GROUND COVERS CODE BOTANICAL / COMMON NAME CONT SPACING QTY NATIVE GRASSES / Filter Strip Mix Shooting Star Native Seed or approved equal Seed 35,550 S.F. ROCK 3/4" River Rock / 3/4" River Rock ---3,100 S.F. GRASS BUFFER Poa pratensis / Kentucky Bluegrass ---5,760 S.F. PLANT_SCHEDULE Large Deciduous Tree 2' - 4'18 18" - 24" TYPE TYPE SUM OF TREES QTY 192 EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 166 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 03/03/2025 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT L1.1L1.1 L1.1ORONO GARAGE CONDOSSITE PLANLANDSCAPE DETAILS03/03/2025 24015 LEHMRHPLANTING NOTES: 1.THE LANDSCAPE CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES WITHIN THE LIMIT OF WORK AND IS RESPONSIBLE FOR ANY DAMAGE AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 2.ALL TREE AND SHRUB LOCATIONS ARE TO BE STAKED ON SITE FOR APPROVAL BY THE CONSULTANT PRIOR TO INSTALLATION. 3.SUBSTITUTIONS: THE CONSULTANT SHALL APPROVE ANY SUBSTITUTION. 4.DO NOT PRUNE PLANTS UNLESS DIRECTED TO DO SO BY THE CONSULTANT. 5.CONTAINER STOCK IS PREFERRED FOR ALL PLANTS. IF CONTAINER STOCK IS NOT AVAILABLE FOR TREES, THEN ALL B&B PLANT MATERIAL SHALL HAVE ALL WIRE, TWINE, OR OTHER CONTAINMENT MATERIAL, EXCEPT FOR 100% HEMP BURLAP, REMOVED FROM THE TRUNK AND ROOT BALL OF THE PLANT PRIOR TO PLANTING. REMOVE THE TOP 2/3 OF THE HEMP BURLAP AFTER PLACING PLANT IN THE PIT. 6.PLANTING SOIL FOR ALL PLANTING AREAS: a.DO NOT STORE BULK MATERIALS NEAR STRUCTURES, OVER EXISTING PLANTING, OVER UTILITIES, WALKWAYS AND PAVEMENTS. a.PROVIDE EROSION CONTROL MEASURES TO PREVENT DISPLACEMENT OF BULK MATERIALS, DISCHARGE INTO WATERWAYS OR SEWERS, AND AIRBORNE DUST. b.PREPARING PLANTING AND SEEDING AREAS; SPREADING SOIL SHALL BE COMPLETED BY THE LANDSCAPE CONTRACTOR AND SUPERVISED BY THE GENERAL CONTRACTOR SO THAT GRADES ARE MET AS NOTED ON THE GRADING PLANS. c.PLANTING SOIL DEPTH SHALL BE A MINIMUM OF SIX (6) INCHES IN ALL LANDSCAPE BEDS. d.ALL PLANTING AREA SOIL SHALL BE 2-WAY (60% SAND, 40% COMPOST) TOPSOIL FROM AN APPROVED SOURCE. PROVIDE A 1-QUART SAMPLE FOR APPROVAL PRIOR TO IMPORTING ANY SOIL. TOPSOIL NOT MEETING INDUSTRY STANDARDS FOR COMPOSITION AND NUTRIENTS SHALL BE REJECTED. e.APPLY 2 INCHES OF APPROVED PLANTING SOIL OVER PREPARED SUBGRADE AND TILL INTO TOP 4 INCHES OF SUBSOIL. INSTALL REMAINING PLANTING SOIL TO A MINIMUM OF 4 INCHES SO THE TOTAL MINIMUM DEPTH OF NEW PLANTING SOIL IN NO LESS THAN 8 INCHES. ROLL AND RAKE SMOOTH. ENSURE NO ROCKS OR OTHER DEBRIS EXCEEDING 3 INCHES IN DIAMETER REMAIN. f.IF PREPARED SOIL OR PREPARED SUBGRADE IS RE-COMPACTED, RESTORE AS DIRECTED BY THE CONSULTANT. 9.INSTALL ROCKS IN ALL PLANTING BEDS TO A DEPTH OF 3 INCHES. 10.ROCKS SHALL NOT BE ABOVE OR MORE THAN 1/2 INCH BELOW ADJOINING SURFACE. MULCH SHALL BE HELD BACK 2-3 INCHES FROM THE STEMS AND TRUNKS OF PLANTS. 11.DURING PLANTING OPERATIONS, KEEP ADJACENT PAVING AREAS CLEAN AND PROTECTED FROM DAMAGE. WORK AREA SHALL BE KEPT CLEAN AND ORDERLY. 12.REMOVE NURSERY TAGS AND STAKES. 13.WARRANTY: INSTALLER AGREES TO WARRANTY PLANTING THAT FAILS IN MATERIALS, WORKMANSHIP OR GROWTH WITHIN A WARRANTY PERIOD OF 12 MONTHS FROM THE DATE OF PLANTING COMPLETION. 14.PLANT SYMBOLS SHALL DICTATE PLANT COUNT. 15.ALL LANDSCAPING SHALL BE PLANTED AND MAINTAINED IN A LIVING CONDITION BY THE CONTRACTOR UNTIL FINAL OWNER ACCEPTANCE. 16.IRRIGATION TO BE DESIGN BUILD BY IRRIGATION CONTRACTOR IF DESIRED BY OWNER. NOT PART OF THIS CONTRACT. 1" = 1'-0" TREE SINGLE STAKE PLANTING SHRUB AREAS. PLANTING AT STAKING DETAILPLANT PIT DETAIL TURF AREAS. PLANTING AT FX-PL-FX-TREE-022 TREE ON SLOPE - UNMODIFIED SOIL 1/2" = 1'-0" Native soil. Round-topped soil berm 4" high x 8" wide above root ball surface shall be centered on the downhill side of the root ball for 240°. Berm shall begin at root ball periphery. Finished grade. Bottom of root ball rests on existing or recompacted soil. SECTION VIEW Original slope should pass through the point where the trunk base meets substrate/soil. Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil. Loosened soil. Dig and turn the soil to reduce the compaction to the area and depth shown. 4" layer of mulch. No more than 1" of mulch on top of root ball. Slope sides of loosened soil. 3x widest dimension of root ball SLOPE 5% (20:1) TO 50% (2:1) 3 EXISTING FIRE HYDRANT LOCATED AT THE MID POINT OF NORTH PROPERTY LINE, TOP NUT OF HYDRANT =1026.02 167 AREA LOCATION SITE LOCATION SHEET INDEX ORONO MINNESOTA ORONO SITE LOCATION ORONO GARAGE CONDOS -BUILDING 1 ROBERT L. PAGE ORONO, MN ABBREVIATIONS AB ANCHOR BOLT AC AIR CONDITIONING ACT ACOUSTICAL TILE AFF ABOVE FINISHED FLOOR AL ALUMINUM ALT ALTERNATE ANCH ANCHOR ARCH ARCHITECTURAL BD BOARD BTWN BETWEEN BLDG BUILDING BM BEAM BRG BEARING BSMT BASEMENT BOT BOTTOM BTU BRITISH THERMAL UNIT C/O CLOSED OPENING CCTV CLOSED CIRCUIT TV CFM CUBIC FEET/MINUTE CJ CONTROL JOINT CLG CEILING CMU CONCRETE MASONRY UNIT CO CLEAN OUT COL COLUMN CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CPT CARPET CT CERAMIC TILE CTR CENTER(ed) CW COLD WATER DEMO DEMOLISH DEPT DEPARTMENT DIA DIAMETER DIM DIMENSION DISP DISPENSER DIV DIVISION DN DOWN DO DITTO DR DOOR EA EACH EL ELEVATION ELEC ELECTRIC(al) EIFS EXT INSUL & FIN SYSTEM EQ EQUAL EQUIP EQUIPMENT EW EACH WAY EWC ELECTRIC WATER COOLER EX EXPOSED EXIST EXISTING EXP EXPANSION EXT EXTERIOR FH FULL HEIGHT FAB FABRICATE(ion)(or) FD FLOOR DRAIN FDN FOUNDATION FE FIRE EXTINGUISHER FFE FINISH FLOOR ELEVATION FIN FINSH (ed) FIX FIXTURE FLR FLOOR FT FOOT FTG FOOTING FUT FUTURE GA GAUGE, GAGE GB GRAB BAR GFI GROUND FAULT INTERRUPT GALV GALVANIZED GL GLOSS, GLAZING GPM GALLONS PER MINUTE GYP BD GYPSUM BOARD HB HOSE BIB HC HOLLOW CORE HDBD HEADBOARD HDCP HANDICAPPED HDWD HARDWOOD HDWR HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL (REBAR) HT HEIGHT HVAC HEAT/VENT & AIR COND HW HOT WATER HYD HYDRANT ID INSIDE DIAMETER IN INCH INSUL INSULATION INT INTERIOR INV INVERT ISOL ISOLATION JOINT JAN JANITOR JST JOIST JT JOINT LAV LAVATORY LB POUND MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MET/MTL METAL MFR MANUFACTURER MH MANHOLE MIN MINIMUM, MINUTE MISC MISCELLANEOUS MO MASONRY OPENING MR MOISTURE RESISTIVE N/A NOT APPLICABLE NIC NOT IN CONTRACT NTS NOT TO SCALE OC ON CENTER OH OVERHEAD OPNG OPENING OPP OPPOSITE ORD OVERFLOW ROOF DRAIN PART PARTITION PART BD PARTICAL BOARD PBLG PLUMBING PLF LBS PER LINEAR FOOT PLAM PLASTIC LAMINATE P PROPERTY LINE or PLATE PLYWD PLYWOOD PP POWER POLE PR PAIR PRV POWER ROOF VENT PSF LBS PER SQUARE FOOT PSI LBS PER SQUARE INCH PT POINT PTS PLYWOOD THIS SIDE PVC POLYVINYL CHOLORIDE QR QUARRY TILE QTY QUANTITY R RADIUS, RISER RA RETURN AIR RD ROOF DRAIN REF REFERENCE REFG REFRIGERATOR REG REGISTER REINF REINFORCE (ing)(ed) REQD REQUIRED RET RETURN REV REVERSED RM ROOM RO ROUGH OPENING ROW RIGHT-OF-WAY RTU ROOF TOP UNIT RV ROOF VENT RWL RAIN WATER LEADER SD SOAP DISPENSER SECT SECTION SF SQUARE FOOTAGE SIM SIMILAR SLNT SEALANT SND SANITARY NAPKIN DISP SNR SANITARY NAPKIN RECPT SPEC SPECIFICATION(s) SQ SQUARE SS SERVICE SINK STL STEEL STRUCT STRUCTURE(al) SYST SYSTEM TB TOWEL BAR TD TOWEL DISPENSER TELE TELEPHONE TEMP TEMPERATURE TFE TOP OF FTG ELEV THRES THRESHOLD TPD TOILET PAPER DISPENSER TRANSF TRANSFER TV TELEVISION TYP TYPICAL UNO UNLESS NOTED OTHERWISE UTL UTILITY VCT VINYL COMPOSITION TILE VAV VARIABLE AIR VOLUME VERT(S) VERTICAL (REBAR) VWC VINYL WALL COVERING VRFY VERIFY W/ WITH W/O WITHOUT WC WATER CLOSET WD WOOD WDW WINDOW WP WATERPROOF(ing) WR WATER RESISTIVE WSCT WAINSCOT WT WEIGHT WWF WELDED WIRE FABRIC L DBL DOUBLE DRAFTING SYMBOLS A200 SHEET NUMBER DISCIPLINE COLUMN GRID SECTION NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER SHEET NUMBER ELEVATION NUMBER INTERIOR ELEVATION NUMBER SHEET NUMBER ELEVATIONS REVISION NUMBER KEYNOTE EXISTING SPOT ELEVATION SPOT ELEVATION WALL OR SURFACE MOUNTED FIRE EXTINGUISHER WALL MOUNTED FIRE EXTINGUISHER CABINET RECESSED FIRE EXTINGUISHER AND CABINET ROOM NAME ROOM NUMBER DOOR NUMBER EXISTING WALL, DOOR, FIXTURE, ETC. TO BE REMOVED EXISTING WALL, DOOR, FIXTURE, ETC. TO REMAIN NEW PARTITION PARTITION OR WALL TYPE CONTROL JOINT A2101 2 1 A101______________1 A500 GR ______________1 A400 ______________1 A201 2 G6XSROOM 100 98'-10 1/2" 100'-0" AHJ AUTHORITY HAVING JURISDICTION L ANGLE AHU AIR HANDLING UNIT FDC YD YARD FIRE DEPARTMENT CONNECTION UNOCC UNOCCUPIED MEMB MEMBRANE T/ TOP OF B/ BOTTOM OF LOC(S) LOCATION(s) SCHED SCHEDULE EF EACH FACE IF INSIDE FACE OF OUTSIDE FACE ADDL ADDITIONAL HR HOUR GENERAL NOTES 1. DRAWINGS SHALL COVER THE FULL EXTENT OF THE PROJECT. 2. CONTRACTOR TO COORDINATE ALL WORK WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, SPECIFICATIONS, DRAWINGS AND SUB-CONTRACTORS. 3. CONTRACTOR SHALL VISIT THE SITE, COMPARE DRAWINGS AND SPECIFICATIONS, AND BE KNOWLEDGEABLE OF OTHER WORK BEING PERFORMED. FAILURE OF CONTRACTOR TO VISIT THE SITE SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO COMPLETE THE CONTRACT WORK IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS WITHOUT ADDITIONAL COST TO OWNER. 4. ALL DIMENSIONS ON ARCHITECTURAL DRAWINGS LOCATING STRUCTURAL ELEMENTS ARE TO CENTERLINE OF STEEL COLUMNS AND STEEL BEAMS, UNLESS NOTED OTHERWISE. 5. ALL DIMENSIONS LOCATING EXTERIOR WALL SYSTEMS ARE TO EXTERIOR FINISH FACE OR TO INTERIOR FINISH FACE, UNLESS NOTED OTHERWISE. 6. ALL PLAN DIMENSIONS ARE TO FACE OF CONCRETE BLOCK OR GYPSUM BOARD OR TOTAL WALL THICKNESS. SEE FINISH PLAN AND/ OR DETAILS FOR FINISH MATERIALS. APPLIED MATERIALS SUCH AS CERAMIC TILE ARE NOT INCLUDED IN TOTAL PARTITION THICKNESS. 7. ALL CHANGES IN FLOOR FINISHES SHALL OCCUR BENEATH DOORS UNLESS NOTED OTHERWISE OR DETAILED OTHERWISE. 8. PROVIDE FIRE-TREATED WOOD BLOCKING AT ALL WALL HUNG ITEMS ON GYPSUM BOARD PARTITIONS, INCLUDING ALL WALL MOUNTED DOOR STOPS. 9. VERIFY ALL DIMENSIONS BEFORE PROCEEDING WITH WORK. NOTIFY ARCHITECT OF ANY ERRORS AND/ OR DISCREPANCY PRIOR TO PROCEEDING WITH WORK. 10. DO NOT SCALE THE DRAWINGS FOR BUILDING PURPOSES. USE PLAN INFORMATION, DIMENSIONS, SHOP DRAWINGS AND FIELD VERIFICATION FOR ANY CONSTRUCTION. MATERIALS SHIM WOOD BLOCKING METAL BOARD INSUL BATT/BLANKET INSUL PLASTER/GROUT GYPSUM BOARD PARTICAL BOARD PLYWOOD WOOD FINISH STONE BRICK CMU (CONCRETE MASONRY UNIT) CONCRETE GRANULAR FILL EARTH FIN FLR EL = 100'-0" US-12US-12 OLD CRYSTAL BAY RD NWAYZATA BLVDWAYZATA BLVD WILLOW DR NPROJECT TEAM OWNER ROBERT L. PAGE PHONE: 952-200-6384 CONTACT: ROBERT PAGE EMAIL: robertlouis.page@gmail.com ARCHITECT:VAA, LLC 2300 BERKSHIRE LANE N, SUITE 200 PLYMOUTH, MN 55441 DIRECT: 763-577-9198 FAX: 763-559-0378 CONTACT: TRAVIS R. BECK, EMAIL: tbeck@vaaeng.com VAA, LLC 2300 BERKSHIRE LANE N, SUITE 200 PLYMOUTH, MN 55441 DIRECT: 763-577-9120 FAX: 763-559-0378 CONTACT: MARK MIELKE EMAIL: mmielke@vaaeng.com STRUCTURAL: HAGSTROM ENGINEERING 219 6TH AVE E ALEXANDRIA, MN 56308 WORK: 320-759-0764 CELL: 720-560-4942 CONTACT: MATTHEW HAGSTROM EMAIL: mhagstrom@hagstromeng.com CIVIL: STRUCTURAL S001 S101 STRUCTURAL NOTES FOUNDATION PLAN ROOF FRAMING PLANS121 S501 FOUNDATION DETAILS S502 FRAMING DETAILS CODE LIFE SAFETY CL100 CL101 CODE DIAGRAM SITE PLAN AND CODE SUMMARY FOUNDATION PLAN ARCHITECTURAL A101 A110 FLOOR AND ROOF PLANS REFLECTED CEILING PLAN EXTERIOR ELEVATIONSA201 A220 BUILDING SECTIONS A301 WALL SECTIONS A601 WALL PARTITION TYPES, DOOR & FRAME ELEVATIONS, and SCHEDULES CIVIL -HAGSTROM ENGINEERING C1.0 C2.0 COVER SHEET EXISTING SITE & DEMO PROPOSED SITE PLANC3.0 C3.1 PROPOSED UTILITY PLAN C4.0 PRELIMINARY GRADING & EROSION CONTROL PLAN C5.0 CONSTRUCTION DETAILS C5.1 CONSTRUCTION DETAILS C5.2 CONSTRUCTION DETAILS G001 COVER SHEET SHEET #SHEET DESCRIPTION 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:30 AMG001 COVER SHEET ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 0 03/03/25 ISSUED FOR CONSTRUCTION MGH HIT AR HI AR HI , NCARB Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 168 FUTURE BUILDING 3 S-1 FUTURE BUILDING 4 S-1 FUTURE BUILDING 5 S-1 BUILDING 2 S-1 BUILDING 1 S-1 BUILDING CODES 2020 MINNESOTA BUILDING CODE (2018 IBC BASE) 2020 MINNESOTA FIRE CODE (2018 IFC BASE) 2020 MINNESOTA ENERGY CONSERVATION CODE 2020 MINNESOTA MECHANICAL CODE 2020 MINNESOTA PLUMBING CODE 2020 NATIONAL ELECTRICAL CODE OSHA 1910 2010 ADA STANDARDS OCCUPANCY: 311.1 S-1 MODERATE-HAZARD STORAGE (MOTOR VEHICLE RELATED OCCUPIANCIES) CONSTRUCTION TYPE: 602.5 TYPE V-B, SPRINKLERED GENERAL BUILDING HEIGHTS: TABLE S-1 OCCUPANCY, TYPE V-B CONSTRUCTION 504.3 ALLOWABLE:60’, 2 STORIES ACTUAL: B1 / B2 24'-1”/ 33'-9”, 1 STORY GENERAL BUILDING AREAS: 506.2 ALLOWABLE (1-STORY):36,000 SF ACTUAL: PHASE I • BUILDING 1 • (40’x 240’)9,600 SF • BUILDING 2 • (40’x 260)10,400 SF • (46’x 275’)12,650 SF 23,050 SF FIRE SEPARATIONS TABLE 508.4 REQUIRED SEPARATION OF OCCUPANCIES S-1 to S-1 = NO RATING REQUIRED FIRE-RESISTANCE RATING REQUIREMENT, TYPE V-B TABLE 601 STRUCTURAL FRAME:0-HOUR EXT BEARING WALLS:0-HOUR INT BEARING WALLS:0-HOUR NONBRG WALLS:FLOOR 0-HOUR CONSTRUCTION:ROOF 0-HOUR CONSTRUCTION:0-HOUR 602.5 TYPE V CONSTRUCTION: STRUCTURAL ELEMENTS, EXTERIOR WALLS AND INTERIOR WALLS ARE OF ANY MATERIALS PERMIITED BY THIS CODE. MAXIMUM AREA OF EXTERIOR WALL OPENINGS TABLE 705.8 X IS GREATER THAN 10' AND LESS THAN 30' FIRE SEPARATION DISTANCE FOR S1 IS 0-HR 718.4.3 DRAFTSTOPPING IS NOT REQUIRED AS CONCEALED SPACE IS FULLY SPRINKLED. FINISHES: TABLE 803.13 FIRE CLASSIFICATIONS FOR FINISHES SPRINKLERED S EXIT ENCL & EXIT PASSAGEWAYS C CORRIDORS C ROOMS and ENCLOSED SPACES C FIRE PROTECTION SYSTEMS: 903.2.9 AUTOMATIC SPRINKLER SYSTEM TO BE PROVIDED IN S-1 OCCUPANCIES WHEN FIRE AREA EXCEEDS 12,000 SF OR AREA IS LOCATED MORE THAN THREE STORIES ABOVE GRADE. TABLE PORTABLE FIRE EXTINGUISHERS FOR CLASS A FIRE HAZARDS 906.3(1)75’MAX TRAVEL DISTANCE TO AN EXTINQUISHER, 11,250 SF MAXIMUM FLOOR AREA FOR EXTINQUISHER. 910.2.(2)SMOKE AND HEAT REMOVAL NOT REQUIRED WHEN PROTECTED BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM. • SPRINKLERS ARE PROVIDED MEANS OF EGRESS: TABLE OCCUPANCY 1004.5 MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT STORAGE = 300 SF (GROSS)/OCCUPANT • SEE CODE DIAGRAMS FOR OCCUPANCY COUNTS 1005.3.2 .15”/OCCUPANT FOR ALL OTHER MEANS OF EGRESS • SEE CODE DIAGRAMS FOR EGRESS WIDTHS PROVIDED TABLE COMMON PATH ALLOWABLE WITH ONE EXIT (SPRINKLERED) 1006.2.1 GROUP S = 75’ • 1 EXITS PROVIDED PER LEVEL TABLE 2 EXITS REQUIRED WHEN OCCUPANT LOADS EXCEED: 1010.1.1 MINIMUM CLEAR WIDTH OF DOOR TO BE 32” 1010.1.3 MAXIMUM PULL OR PUSH FORCE FOR EGRESS DOORS TO BE 5 POUNDS. 1010.1.5 THERE IS TO BE A LANDING EACH SIDE OF A DOOR. LANDING TO BE LEVEL WITH A MAXIMUM SLOPE OF 2-PERCENT. 1010.1.6 LANDING WIDTH TO BE A MINIMUM EQUAL TO THE WIDTH OF THE DOOR. 1010.1.7 MAXIMUM ½-INCH THRESHOLD AT DOORS. 1013.1 EXIT SIGNS TO BE PROVIDED AT EXIT DOORS PER SECTION 1011.1 TABLE S-1 OCCUPANCY SPRINKLERED -MAXIMUM TRAVEL DISTANCE: 1017.2 ALLOWABLE:250’-0” ACTUAL:54’-0” MEANS OF EGRESS ILLUMINATION 1008.2 MEANS OF EGRESS, INCLUDING EXIT DISCHARGE, TO BE ILLUMINATED AT ALL TIMES THE BUILDING IS OCCUPIED. 1008.2.1 MEANS OF EGRESS ILLUMINATION LEVEL TO BE NOT LESS THAN 1 FC AT THE WALK SURFACE. 1008.3.1 EMERGENCY POWER FOR ILLUMINATION • IN THE EVENT O F A POWER SUPPLY FAILURE IN BUILDING REQUIRED TO HAVE TWO OF MORE EXITS; EMERGENCY POWER TO ILLUMINATE THE FOLLOWING: INTERIOR EXIT ACCESS STAIRWAY, INTERIOR AND EXTERIOR STAIRWAYS, EXIT PASSAGE WAYS, EXTERIOR LANDINGS FOR EXIT DOORS 1008.3.4 EMERGENCY POWER SHALL PROVIDE POWER FOR A DURATION OF 90-MINUTE, MINIMUM. 1009.1 ACCESSIBLE SPACES TO BE PROVIDE WITH NOT LESS THAN ONE ACCESSIBLE MEANS OF EGRESS. WHERE MORE THAN ONE MEANS OF EGRESS IS PROVIDED, NOT LESS THAN TWO ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED. SEE SECTION 1103.2.9 FOR AREAS NOT REQUIRED TO BE ACCESSIBLE. EXIT SIGNS 1013.1 EXIT AND EXIT ACCESS DOORS TO BE MARKED WITH APPROVED EXIT SIGN READILY VISIBLE FROM ANY DIRECTION OF TRAVEL. EXIT SIGN PLACEMENT TO BE SUCH THAT NO POINT IN AN EXIT CORRIDOR OR PASSAGEWAY IS MORE THAN 100’OR THE VIEW DISTANCE LISTED FOR THE SIGN, WHICHEVER IS LESS. 1013.3 EXIT SIGNS TO BE INTERNALLY OR EXTERNALLY ILLUMINATED. 1013.5 INTERNALLY ILLUMINATED EXIT SIGNS: SIGN TO BE LISTED AND LABELED IN ACCORDANCE WITH UL 924. BE ILLUMINATED AT ALL TIMES. 1013.6.2 EXIT SIGN ILLUMINATION TO HAVE INTENSITY OF NOT LESS THAN 5 FC (54 LUX) 1013.6.3 EXIT SIGN TO BE ILLUMINATED AT ALL TIMES AND ILLUMINATED FOR A MINIMUM OF 90 MINUTES IN THE CASE OF A LOSS OF POWER. ROOF ASSEMBLIES AND ROOFTOP STRUCTURES TABLE 1505.1 MINIMUM ROOF COVERING CLASS FOR TYPE II B:CLASS C 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:32 AMCL100 CODE DIAGRAM SITE PLAN AND CODE SUMMARY ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1/16" = 1'-0"CL100 SITE PLAN1 CODE SUMMARY NORTH 0 03/03/25 ISSUED FOR CONSTRUCTION MGH Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 169 CODES CODE SYMBOL KEY 2020 MINNESOTA BUILDING CODE -2018 IBC AMENDED 2020 MINNESOTA FIRE CODE -2018 IFC AMENDED 2020 MINNESOTA MECHANICAL CODE -2018 IMC AMENDED 2020 MINNESOTA ELECTRICAL CODE -2020 NFPA 70 AMENDED 2024 MINNESOTA ENERGY CODE w/ ANSI/ ASHRAE/ IES STANDARD 90.1 -2019 2020 MINNESOTA PLUMBING CODE -2018 UPC AMENDED 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN CODE GENERAL NOTES EXIT WIDTH IN INCHES EXIT LOCATION EXIT SIGN w/ EMERGENCY LIGHT FIRE EXTINGUISHER 1 HR WALL w/ 60 MIN FIRE DOOR ASSEMBLY F FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION)S HI-LO DRINKING FOUNTAIND H FIRE HYDRANT PANIC HARDWARE WINDOW EGRESS 1. SEE SHEETS CL100-CL101 FOR APPLICABLE CODES & CODE SYMBOL KEY. 2. SEE SHEET CL100 FOR CODE SUMMARY. 3. CLEAR OPENING WIDTH IS TYPICALLY THE NOMINAL WIDTH MINUS 3 INCHES FOR SINGLE LEAF & MINUS 5 INCHES FOR SINGLE EGRESS PAIR OF DOORS. 1 HR FLOOR SYSTEM 2 HR WALL w/ 90 MIN FIRE DOOR ASSEMBLY PROOM NAME OCCUPANCY CONSTRUCTION TYPE FIRE SUPPRESSION NS: NON SPRINKLERED SP: SPRINKLERED CONDITIONED (COND) OR NON-CONDITIONED (NON-COND) ALARM SYSTEM Y -YES N -NO HAZARDOUS CLASSIFICATION GROUP HAZARDOUS CLASSIFICATION DIVISION HAZARDOUS CLASSIFICATION CLASS OCCUPANY LOAD FACTOR OCCUPANCY LOAD/ UNOCC IF BLANK AREA SPACE S-1 IIB NS N COND 2 2 G 11,567 SF 100 --- 3 HR WALL w/ 180 MIN FIRE DOOR ASSEMBLY W 33 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M FFFFFFFFFFFF33333333333333333333333340'-0"240'-0" 20'-0"20'-0"20'-0"20'-0"40'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 33 FCL101 3______________ X TRAVEL DISTANCE TO EXIT= 54'-0" CL101 2______________ 752 SF 3 OCC UNIT 12 S1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 11 S-1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 10 S-1 V-B SP COND N N N 300Y 760 SF 3 OCC UNIT 9 S-1 V-B SP COND N N N 300Y 760 SF 3 OCC UNIT 8 S-1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 7 S-1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 6 S-1 V-B SP COND N N N 300Y 760 SF 3 OCC UNIT 5 S-1 V-B SP COND N N N 300Y 760 SF 3 OCC UNIT 4 S-1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 3 S-1 V-B SP COND N N N 300Y 764 SF 3 OCC UNIT 2 S-1 V-B SP COND N N N 300Y 674 SF 3 OCC UNIT 1 S-1 V-B SP COND N N N 300Y 69 SF 1 OCC UTILITY S-1 V-B SP COND N N N 300Y EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.1 1.2 EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE 40'-0" CL101 2______________ UNIT 3 S-1 CONC FOOTING - SEE STRUCT, TYP WDW BRG EL 111'-11 1/2" EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE CL101 3______________ 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" UNIT 12 UNIT 11 UNIT 10 UNIT 9 UNIT 8 UNIT 7 UNIT 6 UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1 S-1 S-1 S-1 S-1 S-1 S-1 S-1S-1 S-1 S-1 S-1 S-1 1-HR FIRE RATED WALL/ CEILING CONC SLAB - SEE STRUCT, TYP WDW BRG EL 111'-11 1/2" 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:33 AMCL101 CODE DIAGRAMS MAIN FLOOR AND SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB NORTH 1/8" = 1'-0"CL101 CODE DIAGRAM BUILDING SECTION3 1/8" = 1'-0"CL101 CODE DIAGRAM BUILDING SECTION2 1/8" = 1'-0"CL101 CODE DIAGRAM MAIN FLOOR1 0 03/03/25 ISSUED FOR CONSTRUCTION MGH Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 170 GENERAL NOTES 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. SEE SHEETS CL100 & CL101 FOR CODE DIAGRAMS AND SUMMARY. 3. SEE SHEET A601 FOR WALL & PARTITION SCHEDULES & DOOR SCHEDULE. 4. SEE SHEET A601 FOR DOOR & WINDOW TYPES & ELEVATIONS. PARTITION SYMBOL KEY G6XSA 1 HR S INSULATED WALL OR PARTITION X FIRE RATED CONSTRUCTION MATERIAL THICKNESS -SEE A601 WALL RATING WALL OR PARTITION TYPE: G INTERIOR GYPSUM BOARD PARTITION M MASONRY WALL SW SHAFT WALL W EXTERIOR WALL SYSTEM C CONCRETE WALL MLP METAL LINER PANEL IMP INSULATED METAL PANEL PLAN KEYNOTES# A ONE SIDED WALL OR PARTITION 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M 40'-0"240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" UNIT 12 112 UNIT 11 111 UNIT 10 110 UNIT 9 109 UNIT 8 108 UNIT 7 107 UNIT 6 106 UNIT 5 105 UNIT 4 104 UNIT 3 103 UNIT 2 102 UNIT 1 101 101102103104105106107108109110111112101A102A103A104A105A106A107A108A109A110A111A112A UTILITY 90 90 A220 1______________ A201 1______________ A201 2______________ A201 3______________ A201 4______________ T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" W9S GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 W9S G7XS W9S39 TYP TYP 33 TYP TYP 30 A220 2______________ 100TYP TYP 35 TYP 1 6'-7"3'-0"85 A301 4______________ 7'-5"10'-0"3 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M A220 1______________ A201 1______________ A201 2______________ A201 3______________ A201 4______________4" / 12"4" / 12"4" / 12"4" / 12"4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12"OVERHANG3'-0"40'-0"OVERHANG3'-0"OVERHANG 1'-10 3/4" OVERHANG 1'-10 3/4" 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12"4" / 12" 4" / 12" A220 2______________ 19'-9"40'-8 3/4"39'-3 1/4"40'-8 3/4"39'-3 1/4"40'-8 3/4"19'-9" 9999 79 TYP TYP 85TYP 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:35 AMA101 FLOOR AND ROOF PLANS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1 CONC STOOP, SLOPED - SEE STRUCT 3 CONC APRON - SEE STRUCT 30 HM DOOR & FRAME - PAINTED 33 OH SECTIONAL DOOR SYSTEM 35 METAL THRESHOLD 39 LINE OF OH DOOR ABOVE 79 CONT. RIDGE VENT 85 PREFINISHED METAL GUTTER & DOWNSPOUT SYSTEM 99 ASPHALT SHINGLE ROOF SYSTEM 100 FE - WALL-HUNG 1/8" = 1'-0"A101 FLOOR PLAN1 NORTH NORTH 1/8" = 1'-0"A101 ROOF PLAN2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 171 REFLECTED CEILING GENERAL NOTES ACOUSTICAL CEILING TILE AND SUSPENDED GRID SYSTEM GYPSUM BOARD OR PLASTER CEILING EXPOSED STRUCTURE 2x4 LED LIGHT FIXTURE 1x4 LED LIGHT FIXTURE RECESSED DOWN LIGHT WALL MOUNTED LIGHT FIXTURE 2x2 SUPPLY AIR GRILLE 2x2 RETURN AIR GRILLE 6x2 RETURN AIR GRILLE WALL OR PARTITION TO UNDERSIDE OF DECK 2x4 SUSPENDED LED LIGHT FIXTURE EXIT SIGN SUSPENDED LED STRIP LIGHT FIXTURE 2 HR WALL w/ 2 HR OPENING 1 HR WALL w/ 60 MIN FIRE DOOR ASSEMBLY 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. REFERENCE TO CEILING AND SOFFIT HEIGHTS ARE ABOVE FINISHED FLOOR ELEVATION. 3. LIGHT FIXTURES AND ACT ARE TO BE CENTERED IN BOTH DIRECTIONS WITHIN ROOM OF AREA UNO. 4. SEE ELECTRICAL FOR LOCATION OF LIGHTS NOT SHOWN. 3 HR WALL w/ 3 HR OPENING REFLECTED CEILING PLAN SYMBOL KEY REFLECTED CEILING PLAN KEYNOTES# 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M A220 1______________40'-0"240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" A220 2______________ UNIT 12 112 UNIT 11 111 UNIT 10 110 UNIT 9 109 UNIT 8 108 UNIT 7 107 UNIT 6 106 UNIT 5 105 UNIT 4 104 UNIT 2 102 UNIT 1 101 UTILITY 90 UNIT 3 103 151 TYP 151 85TYP 240TYP 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:37 AMA110 REFLECTED CEILING PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB NORTH 85 PREFINISHED METAL GUTTER & DOWNSPOUT SYSTEM 151 GYP BD CEILING 240 LIGHT 1/8" = 1'-0"A110 REFLECTED CEILING PLAN1 0 03/03/25 ISSUED FOR CONSTRUCTION MGH Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 172 EXTERIOR ELEVATION GENERAL NOTES 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. SEE SECTIONS & DETAILS FOR ADDITIONAL MATERIAL & FINISH INFORMATION. 3. SEE A501 FOR FRAME ELEVATIONS & GLASS TYPES. EXTERIOR ELEVATION KEYNOTES# EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.11.2 EL 124'-1 1/4" ROOF RIDGE A220 1______________ 40'-0" DR 90 4" 12" 4" 12"TYP9'-0"240 TYP 30 TYP TYP85 EQEQ 5 A601 1 A601 TYP TYP 3 A601 TYP 79 TYP EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" DR 112 DR 112A DR 111A DR 111 DR 110 DR 110A DR 109A DR 109 DR 108 DR 108A DR 107A DR 107 DR 106 DR 106A DR 105A DR 105 DR 104 DR 104A DR 103A DR 103 DR 102 DR 102A DR 101A DR 101 A220 2______________ 58 56 57 TYP TYP TYP 78TYP 33 TYP 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 85 TYP 6 A601 TYP 4 A601 TYP 2 A601TYPTYP3'-8"T/ WALL EL 116'-0" 1.1 1.2 EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE A220 1______________ 40'-0" 4" 12" 4" 12" EL 120'-0" T/ WALL EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.A 1.B 1.C 1.D 1.E 1.F 1.G 1.H 1.I 1.J 1.K 1.L 1.M EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 25 T/ OPNGT/ OPNG B/ OPNG EL 115'-0" EL 112'-0" A220 2______________ 40 TYP EL 115'-0"25 25 25 25 25 25 25 25 25 25 25 58 57 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:38 AMA201 EXTERIOR ELEVATIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 30 HM DOOR & FRAME - PAINTED 33 OH SECTIONAL DOOR SYSTEM 40 HM WINDOW SYSTEM 56 HARDIE SMOOTH SURFACE (CHARCOAL) 57 4'x8' STUCCO TEXTURE PANEL (CHARCOAL) 58 FAUX STONE, MISSION POINT - BY VERSETTA 78 ASPHALT SHINGLES (BLACK) 79 CONT. RIDGE VENT 85 PREFINISHED METAL GUTTER & DOWNSPOUT SYSTEM 240 LIGHT 1/8" = 1'-0"A201 NORTH EXTERIOR ELEVATION1 1/8" = 1'-0"A201 EAST EXTERIOR ELEVATION2 1/8" = 1'-0"A201 SOUTH EXTERIOR ELEVATION3 1/8" = 1'-0"A201 WEST EXTERIOR ELEVATION4 0 03/03/25 ISSUED FOR CONSTRUCTION MGH 57 58 58 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 173 EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M EL 99'-4" T/O CONC EL 124'-1 1/4" ROOF RIDGE 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" UNIT 12 112 UNIT 11 111 UNIT 10 110 UNIT 9 109 UNIT 8 108 UNIT 7 107 UNIT 6 106 UNIT 5 105 UNIT 4 104 UNIT 3 103 UNIT 2 102 UNIT 1 101 W9S A220 2______________ GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 GW8 W9S 25 25 25 25 25 25 25 25 25 25 25 25 EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.11.2 EL 124'-1 1/4" ROOF RIDGEA220 1______________ 40'-0" 4" 12" 4" 12" W9S PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER CONC SLAB - SEE STRUCT CONC FTG - SEE STRUCT DORMER, SEE STRUC ______________ A301 2TYP MIR ______________ A301 3 TYP, MIR, SECTION THROUGH DORMER W9S ______________ A301 1TYP, MIR NO DOOR CONT. RIDGE VENT R-49 BLOWN-IN INSULATION TRACKS ARE MOUNTED PARALLEL TO CEILING WDW BRG EL 111'-11 1/2" 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:39 AMA220 BUILDING SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1/8" = 1'-0"A220 BUILDING SECTION1 1/4" = 1'-0"A220 BUILDING SECTION2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 174 EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.1 EL 124'-1 1/4" ROOF RIDGE W10S VENTED VINYL SOFFIT PRE-FIN MTL DRIP & TRIM SIMPSON CLIP - SEE STRUCT DOUBLE 2x PLATE SEE STRUCT PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER CONT SILL PLATE, SEE STRUCT REINF CONCRETE SLAB, SEE STRUCT SHINGLE ROOFING OVER ICE AND WATER SHIELD FIRST 8'-0" AND 3'-0" IN VALLEYS 30lb ROOFING FELT OVER 5/8" OSB 5/8" GYP BD R49 BLOWN-IN INSULATION AND VAPOR BARRIER LP EXTERIOR FINISH TRIM 3'-0" TYPPRE-FIN MTL GUTTER AND DOWNSPOUT, TYP VAPOR BARRIER OVER 6" COMPACTED SAND, TYP 2" RIGID INSULATION, TYP 4" 12"8"CURB, SEE STRUCT DORMER, SEE ALSO STRUCT CONT RIDGE VENT EL 100'-0" T/O CONC T/ WALL EL 116'-0" 1.2 EL 124'-1 1/4" ROOF RIDGE VENTED VINYL SOFFIT PRE-FIN MTL DRIP & TRIM PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER SHINGLE ROOFING OVER ICE AND WATER SHIELD FIRST 8'-0" AND 3'-0" IN VALLEYS 30lb ROOFING FELT OVER 5/8" OSB LP EXTERIOR FINISH TRIM SIMPSON CLIP SEE STRUCT HEADER FRAME SEE STRUCT 5/8" GYP BD 3'-0" TYP PRE FIN MTL INSUL OH DOOR, SEE SCHED 3'-8"4" 12" STONE VENEER LP EXTERIOR FINISH TRIM, RETURN TO DOOR W9S CONT RIDGE VENT TRACKS ARE MOUNTED PARALLEL TO CEILING T/ WALL EL 116'-0" 1.1 EL 99'-4" T/O CONC HEADER FRAME SEE STRUCT VENTED VINYL SOFFIT PRE-FIN MTL DRIP & TRIM SIMPSON CLIP - SEE STRUCT DOUBLE 2x PLATE SEE STRUCT PRE-ENGINEERED ROOF, TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER CONT SILL PLATE, SEE STRUCT REINF CONCRETE SLAB, SEE STRUCT SHINGLE ROOFING OVER ICE AND WATER SHIELD FIRST 8'-0" AND 3'-0" IN VALLEYS 30lb ROOFING FELT OVER 5/8" OSB 5/8" GYP BD R49 BLOWN-IN INSULATION AND VAPOR BARRIER LP EXTERIOR FINISH TRIM 6" 4" 12" W9S CONT RIDGE VENT PROVIDE HOLES IN PLYWOOD FOR VENTING AS REQUIRED RETURN GYP BACK SEALANT AND BACKER SOLID SURFACE SILL, SEALANT AND BACKER CURB, SEE STRUCT 8"FLUSH MOUNT WDW WDW BRG EL 111'-11 1/2" EL 100'-0" T/O CONC 1.A 1/2" PLYWOOD SHEATHING 2x8 WD STUDS 16" OC BATT INSUL (2) LAYERS TYPE X GYP (UL SYSTEM RC-2601) G7XS UTILITY 90 FIRE RATED SEALANT AND BACKER SEALANT AND BACKER CLEAR8'-0"(2) LAYERS TYPE X GYP SEALANT AND BACKER CONC STOOP -SEE STRUCT 2x8 RIM BOARD TREATED 2X BOT PL W/ (1) 1/2" DIA SCREW BOLT W/ 3" EMBED INTO SLAB @ 32" OC SIMPSON H2A CLIP W9S SIMPSON LUS 28 2X8 CONT LEDGER W/ (2) 5/16" DIAX5 1/8" GRK RSS TO WALL STUD DOOR HEADER, BY STRUCT 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:41 AMA301 WALL SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 3/4" = 1'-0"A301 WALL SECTION1 3/4" = 1'-0"A301 WALL SECTION2 3/4" = 1'-0"A301 WALL SECTION3 0 03/03/25 ISSUED FOR CONSTRUCTION MGH 3/4" = 1'-0"A301 SECTION AT UTILITY4 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 175 DOOR SCHEDULE DOOR MAT'L TYPEFIRE RATING A B C D E N WD OAK BIRCH PLAM HM AL/GL FIB DOOR FRAME MAT'L TYPEGLAZING TYPE T TT I IT HM AL WD STL C - 3 HOUR - 1 1/2 HOUR - 1 HOUR - 3/4 HOUR - 20 MINUTE - NO RATING - CLEAR TEMPERED GLASS - TINTED & TEMPERED GLASS - INSULATED - INSULATED TEMPERED - FIRE RATED CERAMIC GLASS - WOOD (AS SPECIFIED) - OAK WOOD - BIRCH WOOD - PLASTIC LAM CLAD - HOLLOW METAL - ALUMINUM & GLASS - FIBERGLASS - HOLLOW METAL - ALUMINUM - WOOD - STEEL HARDWARE GROUP GROUP 1 1.5 PR BB BUTT 1 SET THRESHOLD 1 SET WEATHERSTRIPPING 1 EA SWEEPS 1 ENTRY LOCK, LEVER HANDLE, BRUSHED CHROME FINISH 1 EA. DOOR CLOSER 1 EA WALL STOP GROUP 2 HARDWARE BY DOOR MANUF. A SINGLE PANEL B SECTIONAL OVERHEAD DOOR VISION PANEL (4-THUS) 2"2"SEE SCHED2"SEE SCHED F1 PARTITION & WALL TYPES PARTITION TYPE G7XS 5/8" TYPE 'X' GYP BD 2x6 WD STUD @ 16" OC SOUND BATT INSULATION 5/8" TYPE "X" GYP BD 6 3/4" W9S PARTITION W7S LP SMART SIDE BD BATTEN SIDING WATER & AIR BARRIER 1/2" DENSGLASS SHEATHING 2x6 WD STUD @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE "X" INTERIOR GYP BD PARTITION TYPE W9S (SHEAR WALL) LP SMARTSIDE BD & BATTEN SIDING WATER & AIR BARRIER 1/2" EXTERIOR OSB SHEATHING 3/4" PLYWOOD 2x8 WD STUDS @ 16" OS 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE "X" INTERIOR GYP BD PARTITION TYPE W10S LP SMARTSIDE BD & BATTEN SIDING WATER & AIR BARRIER 1/2" DENSGLASS SHEATHING 2x8 STUDS @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE X INTERIOR GYP BD W10S 7 1/8" 2 . 9 1/8" . 2 PARTITION TYPE G9S 1/2" EXTERIOR OSB SHEATHING 2x8 WD STUD @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE X INTERIOR GYP BD G9S W7S 2 . 8 7/8" G7XS PARTITION TYPE G8S (SHEAR WALL) 5/8" TYPE "X" GYP. BD. 2x8 WD STUD @ 16" OC SOUND BATT INSULATION 5/8" TYPE "X" GYP. BD 8 1/4" 2 GW8 8 3/8" EXTERIOR INTERIOR 1 HOUR WALL SYSTEM UL 305 WINDOW TYPE SCHEDULE FIRE RATING A B C D E N WINDOW FRAME MAT'L TYPE GLAZING TYPE T TT I IT HM AL WD STL C - 3 HOUR - 1 1/2 HOUR - 1 HOUR - 3/4 HOUR - 20 MINUTE - NO RATING - CLEAR TEMPERED GLASS - TINTED & TEMPERED GLASS - INSULATED - INSULATED TEMPERED - FIRE RATED CERAMIC GLASS - HOLLOW METAL - ALUMINUM - WOOD - STEEL VINYL - VINYL DOOR FRAME PER SCHED THRESHOLD BELOW SEALANT & BACKER (BOTH SIDES) 2 2 BUILDING WRAP TO CONTINUE UNDER DOOR FRAME 5/8" GYP BD RETURN w/ CORNER BEAD SHIM AS REQ'D PRE-FIN MTL TRIM EXTERIOR FINISH TRIM - WHITE NOTE: SEE A101 FOR PARTITION TYPE 2 2 2 BUILDING WRAP TO CONTINUE AROUND DOOR FRAME EXTERIOR FINISH TRIM - WHITE WEATHERSTRIP CONT @ PERIMETER OH DR SUPPORT & ANGLE GUIDES CONT BEAD OF SEALANT @ PERIMETER NOTE: SEE A101 FOR PARTITION TYPE T/ OPENING SEE SCHED DOOR & FRAME PER SCHED EXTEND BUILDING WRAP UNDER HEADER PRE-ENG MTL DRIP SEALANT 5/8" GYP BD RETURN w/ CORNER BEAD HEADER FRAME - SEE STRUCT SEALANT w/ BACKER (BOTH SIDES) EXTERIOR FINISH TRIM -WHITE SEALANT, TYP 2 2 2 2 NOTE: SEE A101 FOR PARTITION TYPE HEADER FRAME - SEE STRUCT PRE-FIN METAL TRIM AND DRIP MTL FLASHING WRAP AT HEADER WEATHERSTRIP CONT @ PERIMETER OVERHEAD DOOR TRACK SYSTEM 2 2 2 2 2 EXTEND BUILDING WRAP UNDER HEADER EXTERIOR FINISH TRIM -WHITE SEALANT, TYP T/ OPENING SEE SCHED SPRAY FOAM INSULATION T/ CONC EL= VARIES DOOR & FRAME PER SCHEDULE THRESHOLD SET IN CONT BED OF MASTIC SWEEP PROVIDE WEATHER STRIPPING @ DOOR BTM CONC FOUNDATION - SEE STRUCT WEATHERSTRIP CONT @ PERIMETER MTL FLASHING WRAP AT FRAME OVERHEAD DOOR & DOOR TRACK BOTTOM ASTRAGAL RETAINER OF EXTRUDED ALUMINUM w/ VINYL ASTRAGAL SLOPED CONC APRON -SEE STRUCT CONC SLAB - SEE STRUCT 4'-0"2"EQ 2" F5 SEE SCHED 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. TRAVIS R. BECK, 41400 BUILDING 1 3/3/2025 11:56:43 AMA601 WALL PARTITION TYPES, DOOR & FRAME ELEVATIONS, and SCHEDULES ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB WINDOW FRAME FIRE RATING NOTESTYPE WIDTH HEIGHT ELEV DEPTH MATL GLAZ 25 4'-0" 3'-0" F5 5" DOOR SCHEDULE DOOR FRAME FIRE RATING HDWR GROUP DETAILS NOTESNUMBER LEAF WIDTH LEAF HEIGHT ELEV MATL GLAZ INSULATED ELEV DEPTH MATL GLAZ INSULATED HEAD JAMBS SILL SINGLE LEAF 101 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 102 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 103 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 104 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 105 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 106 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 107 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 108 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 109 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 110 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 111 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 112 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 OVERHEAD 101A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 102A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 103A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 104A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 105A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 106A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 107A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 108A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 109A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 110A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 111A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 112A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 1 1/2" = 1'-0"A601 EXT DOOR JAMB DETAIL1 HM FRAME ELEVATION DOOR ELEVATIONS 1 1/2" = 1'-0"A601 OH DOOR JAMB DETAIL2 1 1/2" = 1'-0"A601 EXT DOOR HEAD DETAIL3 1 1/2" = 1'-0"A601 OH DOOR HEAD DETAIL4 NOTE: SEE A101 FOR PARTITION TYPE 1 1/2" = 1'-0"A601 DOOR SILL DETAIL5 1 1/2" = 1'-0"A601 OH DOOR SILL DETAIL6 NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES INSULAL WINDOW ELEVATION 0 03/03/25 ISSUED FOR CONSTRUCTION MGH FIBER EXPANSION JOINT FIBER EXPANSION JOINT 10 MIL VAPOR RETARDER 10 MIL VAPOR RETARDER R10 RIGID INSUL Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 176 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 ORONO INDUSTRIAL BOULEVARD OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 BLOCK 1 LOT 1 15.9 0.1 0.1 0.3 1.2 4.6 8.3 3.6 1.2 1.5 5.2 14.5 12.1 3.6 1.3 2.1 7.5 9.1 2.5 1.2 3.0 10.2 15.4 6.4 1.8 1.4 4.3 13.1 13.5 4.4 1.4 1.7 6.2 15.2 10.5 3.0 1.0 1.7 5.5 7.7 2.7 0.1 0.2 0.4 1.0 2.7 3.9 2.3 1.1 1.4 3.6 7.2 6.4 2.7 1.2 1.8 4.7 7.9 5.4 2.1 1.2 2.4 6.0 7.9 4.3 1.6 1.4 3.2 7.3 7.4 3.3 1.3 1.6 4.3 8.3 6.3 2.3 1.0 1.4 3.3 4.2 1.9 0.5 0.1 0.1 0.3 0.6 1.1 1.6 1.8 1.3 1.0 1.3 2.2 3.1 2.8 1.7 1.2 1.5 2.5 3.3 2.5 1.5 1.2 1.8 2.9 3.2 2.2 1.3 1.3 2.1 3.2 3.1 1.9 1.2 1.4 2.4 3.4 2.8 1.5 0.9 1.0 1.5 1.7 1.0 0.4 0.1 0.1 0.2 0.5 1.3 2.3 2.5 1.8 1.1 1.1 1.8 2.8 2.7 1.9 1.2 1.3 2.1 2.9 2.5 1.7 1.2 1.5 2.4 2.8 2.2 1.4 1.2 1.7 2.5 2.6 1.9 1.3 1.2 1.9 2.6 2.4 1.6 1.1 1.0 1.3 1.3 0.9 0.5 0.2 0.1 0.1 0.2 0.7 2.6 6.0 6.5 3.2 1.3 1.4 3.6 6.8 5.9 2.6 1.3 1.8 4.4 7.0 4.9 2.1 1.3 2.4 5.6 6.7 3.6 1.5 1.4 3.2 5.9 5.6 2.8 1.3 1.6 3.8 6.4 4.9 2.1 1.1 1.5 2.9 2.9 1.3 0.5 0.2 0.1 0.1 0.2 0.9 3.8 12.2 13.6 5.0 1.5 1.6 5.6 14.3 11.6 3.7 1.3 2.1 7.7 15.4 9.0 2.6 1.3 3.3 11.2 15.0 5.7 1.7 1.6 5.0 12.9 12.0 4.3 1.4 1.8 6.4 15.1 9.7 2.8 1.1 2.1 6.5 6.6 2.0 0.5 0.1 0.1 0.2 0.9 3.8 8.4 4.2 1.1 0.6 1.3 5.3 12.9 12.0 4.3 1.1 0.7 1.8 6.9 13.9 10.4 3.1 0.7 0.3 0.6 2.3 8.2 13.1 9.3 2.7 0.6 0.2 0.3 0.7 2.7 9.2 13.2 8.1 2.2 0.5 0.2 0.2 0.7 2.9 7.8 5.2 1.3 0.3 0.1 0.2 0.7 2.2 3.8 2.5 0.9 0.5 1.1 3.2 6.4 6.0 2.8 0.9 0.6 1.4 4.0 6.9 5.5 2.2 0.7 0.3 0.5 1.7 4.7 7.0 5.2 2.0 0.6 0.2 0.2 0.6 2.0 5.5 7.4 4.9 1.7 0.5 0.2 0.2 0.6 2.0 4.2 3.1 1.0 0.3 0.1 0.2 0.4 0.9 1.3 1.0 0.6 0.4 0.7 1.5 2.3 2.3 1.4 0.7 0.5 0.9 1.8 2.5 2.2 1.2 0.5 0.3 0.4 1.0 2.0 2.6 2.1 1.1 0.5 0.2 0.2 0.5 1.1 2.2 2.8 2.1 1.0 0.4 0.2 0.2 0.4 0.9 1.5 1.2 0.6 0.2 0.1 0.1 0.3 0.4 0.5 0.5 0.4 0.4 0.5 0.7 1.0 0.9 0.7 0.5 0.4 0.6 0.8 1.0 0.9 0.6 0.4 0.3 0.3 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.3 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.3 0.4 0.5 0.5 0.3 0.2 0.1 0.1 0.3 0.5 0.7 0.6 0.4 0.4 0.6 0.9 1.2 1.2 0.8 0.5 0.4 0.6 1.0 1.2 1.1 0.7 0.4 0.3 0.4 0.6 1.0 1.2 1.0 0.7 0.4 0.2 0.2 0.4 0.7 1.1 1.2 1.0 0.6 0.3 0.2 0.2 0.3 0.5 0.6 0.6 0.4 0.2 0.1 0.2 0.5 1.4 2.1 1.5 0.7 0.5 0.9 2.2 3.7 3.3 1.7 0.7 0.5 1.1 2.5 3.8 3.1 1.5 0.6 0.3 0.5 1.2 2.7 3.7 2.9 1.3 0.5 0.2 0.2 0.5 1.3 2.9 3.7 2.6 1.2 0.4 0.2 0.2 0.5 1.2 2.0 1.6 0.7 0.2 0.1 0.2 0.8 2.9 5.7 3.2 1.0 0.5 1.3 4.4 9.3 8.2 3.2 0.9 0.6 1.5 5.2 9.6 7.5 2.6 0.7 0.3 0.5 1.9 6.0 9.2 6.7 2.3 0.6 0.2 0.2 0.6 2.3 6.7 9.3 6.0 1.9 0.5 0.2 0.2 0.6 2.3 5.4 3.8 1.1 0.3 0.1 0.1 0.5 0.4 0.5 0.2 0.1 0.1 0.2 0.3 0.1 0.1 0.1 0.2 0.8 2.9 5.9 3.3 1.0 0.6 1.3 4.6 9.7 8.5 3.2 0.9 0.6 1.6 5.4 10.1 7.7 2.6 0.7 0.3 0.6 2.0 6.4 9.6 6.9 2.3 0.6 0.2 0.3 0.6 2.4 7.1 9.6 6.2 1.9 0.5 0.2 0.2 0.6 2.4 5.7 3.9 1.1 0.3 0.1 0.1 0.2 0.5 1.4 2.2 1.6 0.7 0.5 0.9 2.3 3.9 3.6 1.8 0.8 0.6 1.1 2.6 4.0 3.3 1.6 0.6 0.3 0.5 1.3 2.8 3.9 3.0 1.4 0.5 0.2 0.2 0.5 1.4 3.0 3.9 2.8 1.2 0.4 0.2 0.2 0.5 1.2 2.1 1.7 0.7 0.2 0.1 0.1 0.2 0.3 0.6 0.7 0.6 0.4 0.4 0.6 1.0 1.3 1.3 0.9 0.5 0.5 0.7 1.1 1.3 1.2 0.8 0.4 0.3 0.4 0.7 1.1 1.3 1.1 0.7 0.4 0.2 0.2 0.4 0.7 1.1 1.3 1.1 0.6 0.3 0.2 0.2 0.3 0.5 0.7 0.6 0.4 0.2 0.1 0.1 0.2 0.3 0.5 0.7 0.6 0.4 0.4 0.6 1.0 1.2 1.1 0.8 0.5 0.5 0.6 1.0 1.2 1.1 0.7 0.4 0.3 0.4 0.6 1.0 1.1 1.0 0.6 0.3 0.2 0.2 0.4 0.6 1.0 1.1 0.9 0.6 0.3 0.2 0.2 0.3 0.4 0.6 0.5 0.3 0.2 0.1 0.1 0.2 0.6 1.4 1.9 1.3 0.6 0.5 1.0 2.2 3.4 3.0 1.5 0.7 0.6 1.1 2.3 3.3 2.6 1.3 0.5 0.3 0.5 1.2 2.4 3.1 2.3 1.1 0.5 0.2 0.3 0.5 1.2 2.4 2.9 2.0 0.9 0.4 0.2 0.2 0.4 1.0 1.5 1.2 0.5 0.2 0.1 0.1 0.2 0.8 3.0 5.2 2.8 0.9 0.6 1.4 4.6 8.7 7.2 2.7 0.9 0.6 1.6 5.0 8.5 6.3 2.3 0.7 0.4 0.6 2.0 5.6 7.9 5.5 1.9 0.6 0.2 0.3 0.7 2.3 5.9 7.6 4.7 1.6 0.5 0.2 0.2 0.7 2.2 4.2 2.8 0.9 0.3 0.1 0.1 0.2 0.8 3.7 7.7 3.4 0.9 0.5 1.4 5.7 12.4 9.9 3.2 0.9 0.6 1.8 7.1 13.5 9.3 2.7 0.7 0.4 0.6 2.5 8.7 12.8 8.3 2.4 0.6 0.3 0.3 0.7 3.0 9.9 13.1 7.4 2.0 0.5 0.2 0.3 0.8 3.3 8.2 4.7 1.2 0.3 0.1 0.1 0.1 0.1 0.2 0.9 3.5 6.8 3.3 0.9 0.6 1.6 5.6 11.4 9.1 3.1 0.9 0.7 1.9 6.8 11.9 8.3 2.5 0.7 0.4 0.7 2.5 8.1 11.5 7.6 2.2 0.6 0.2 0.3 0.8 3.0 9.4 11.9 6.8 1.8 0.5 0.2 0.3 0.8 3.1 7.4 4.2 1.0 0.2 0.1 0.1 0.2 0.6 1.7 2.5 1.6 0.7 0.5 1.1 2.8 4.5 3.9 1.9 0.7 0.6 1.3 3.2 4.8 3.7 1.6 0.6 0.4 0.6 1.5 3.6 4.8 3.5 1.5 0.5 0.2 0.3 0.6 1.8 4.0 5.0 3.3 1.3 0.4 0.2 0.2 0.6 1.6 2.8 2.0 0.7 0.2 0.1 0.1 0.2 0.4 0.6 0.8 0.6 0.4 0.4 0.7 1.1 1.5 1.4 0.9 0.5 0.5 0.8 1.3 1.6 1.3 0.8 0.4 0.3 0.4 0.8 1.3 1.6 1.3 0.8 0.4 0.2 0.2 0.4 0.9 1.5 1.7 1.3 0.7 0.3 0.2 0.2 0.4 0.7 0.9 0.7 0.4 0.2 0.1 0.1 0.2 0.3 0.5 0.6 0.5 0.4 0.4 0.6 0.9 1.1 1.0 0.7 0.5 0.4 0.6 0.9 1.1 0.9 0.6 0.4 0.3 0.4 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.4 0.6 0.9 1.0 0.8 0.5 0.3 0.2 0.2 0.3 0.4 0.5 0.4 0.3 0.1 0.1 0.1 0.2 0.6 1.2 1.3 0.8 0.5 0.5 0.9 1.7 2.4 2.0 1.1 0.6 0.5 0.9 1.8 2.4 1.9 1.0 0.5 0.3 0.5 1.0 1.9 2.4 1.7 0.8 0.4 0.2 0.2 0.5 1.0 1.8 2.1 1.5 0.8 0.3 0.2 0.2 0.4 0.8 1.1 0.9 0.4 0.2 0.1 0.1 0.3 1.1 3.0 3.6 1.7 0.6 0.5 1.4 4.0 6.7 5.2 2.1 0.7 0.6 1.5 4.3 6.7 4.7 1.7 0.6 0.3 0.6 1.8 4.9 6.7 4.0 1.3 0.4 0.2 0.3 0.6 2.0 4.8 5.9 3.7 1.3 0.4 0.2 0.2 0.6 1.9 3.2 2.2 0.8 0.2 0.1 0.1 0.3 1.5 5.8 7.6 2.6 0.7 0.6 1.7 6.9 14.4 10.1 2.9 0.8 0.6 2.0 7.8 14.8 9.0 2.4 0.6 0.3 0.6 2.5 9.3 15.1 7.2 1.8 0.5 0.2 0.3 0.7 3.1 10.0 13.2 7.2 1.9 0.5 0.2 0.3 0.8 3.3 8.0 4.5 1.1 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Statistics Description Symbol Avg Max Min Max/Min Avg/Min SITE 1.8 fc 15.9 fc 0.0 fc N/A N/A 10' AFG TYP. W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 A. THE ELECTRICAL EQUIPMENT SHOWN ON THIS SHEET IS DIAGRAMMATICAL IN NATURE AND REPRESENTS APPROXIMATE LOCATIONS IN OR ON SPACE/ROOM/AREA OR EQUIPMENT. CONTRACTOR TO VERIFY THE EXACT LOCATION AND COORDINATE WITH NECESSARY TRADES. GENERAL NOTES: LIGHTING FIXTURE SCHEDULE SYMBOL DESCRIPTION MFR./ CAT. NO.LAMP TYPE INPUT POWER/VOLT REMARKS/ACCESSORIES W1 WET LOCATION -WALL MOUNT LED LITHONIA LIGHTING CAT. NO. WDGE2LEDP240K80CRIVFMVOLTSRMAWSDDBXD LED 15 WATTS (120/277V) Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 44638 DEREK R. SACHS, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR PERMIT ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED.3/3/2025 8:52:38 AME001 SITE PLAN - LIGHTING PHOTOMETRICS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 CTM CTM DRS DRS 1" = 20'-0"E001 SITE PLAN - LIGHTING PHOTOMETRICS1 0 03/03/25 ISSUED FOR PERMIT CTM 03/03/25 ISSUED FOR CONSTRUCTION FOR CONSTRUCTION ISSUED 177 Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2024 - ALL RIGHTS RESERVED.3/3/2025 11:57:23 AMS001 STRUCTURAL NOTES ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS BUILDING 1 STRUCTURAL NOTES 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 178 S SSS SSS SSS SS SS SS 1.1 1.2 40'-0"1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 240'-0" UNIT 100UNIT 101UNIT 102UNIT 103UNIT 104UNIT 105UNIT 106UNIT 107 UNIT 108 UNIT 109UNIT 110UNIT 111 SWB SWB SWA SWA SWB TFE= 96'-0" TFE= 95'-4" SLAB ON GRADE SEE PLAN NOTE 3 IN FLOOR HEATING SYSTEM BY OTHERS 10'-0"CLSLAB JOINT SPACED EQUALLY, TYP SEE 16/S501 S501 1______________ 2x8 STUDS @ 16" OC WHERE HEIGHT EXCEEDS 18'-0" (2) 2x8 @ 16" OC THICKENED SLAB 8'-0"x2'-0"x1'-0" W/ (3) #4 LONGITUDINAL BOT TYP WHERE SHOWN ON PLANS INTERIOR WALLS 2x8 WOOD STUD @ 16" OC, TYP TFE= 96'-0" 2x8 STUDS @ 16" OC WHERE HEIGHT EXCEEDS 18'-0" (2) 2x8 @ 16" OC 2x8 STUDS @ 16" OC 2x8 WOOD STUDS @ 16" OC TFE= 98'-0" TFE= 97'-4" TFE= 97'-4" TFE= 95'-4"TFE= 96'-0" TFE= 95'-4" TYP UNO S501 1______________ T/ SLAB 99'-4" T/ SLAB 100'-0" S501 3______________ S501 2______________ TFE= 96'-0"TFE= 95'-4" S501 1______________ S501 1______________ S501 6______________ SWA THICKENEDSLAB1 1 2 2 2 2 1 2 2 S501 5______________ TYP @ THICKENED SLAB S501 8______________ S501 5______________ TYP @ WALL TYP @ OPENINGCL S501 4______________THICKENEDSLABS501 7______________ 1 4'-0"5 1/4"5'-0" 4'-8 1/2" TYP UNO 8'-2" 4"4" 8'-2" 4'-1"4'-1" T/ STOOP 100'-0" T/ STOOP 99'-4" 4'-8 1/2" TYP 4" 3 3 3 3 3 3 3 3 3 3 3 3 CONCRETE STOOP S501 4______________TYP @ STOOPS CONCRETE APRON TYP BETWEEN STOOPS MAN DOOR CONCRETE STOOP WHERE SHOWN WIDTHS VARY -SEE PLANTYP4'-8"TYP4'-8"1. PROVIDE (2) STUDS AT EACH END OF SHEAR WALL. END STUDS SHALL RECIEVE EDGE NAILING. 2. ALL BLOCKING IN WALLS SHALL MEET OR EXCEED STUD GRADE. 3. PANEL JOINTS SHALL OCCUR AT THE CENTERLINE OF STUDS AND BLOCKING. 4. VERIFY WITH ARCHITECT IF ADDITIONAL LAYERS OF GYP BOARD ARE REQUIRED FOR FINISHES. 5. CONTRACTOR'S OPTION - PROVIDE AT TOP AND SILL PLATE BY ALTERNATE MANUFACTURER THAT MEET OR EXCEED CAPACITY OF CLIPS INDICATED IN SCHEDULE. 6. SEE SHEAR WALL BASE CONNECTION SCHEDULE FOR ANCHORAGE TO SUPPORT MATERIAL. 7. SEE HOLDOWN SCHEDULE FOR HOLDOWN INFORMATION. 8. PROVIDE NAILING AT CLIP ANGLES PER MANUFACTURER'S RECOMMENDATIONS. 9. TOP AND SILL PLATE NAILING SHALL BE STAGGERED WHERE NAILS ARE SPACED AT 2" OC. 10. ALL FASTENERS IN CONTACT WITH TREATED WOODS SHALL BE GALVANIZED. 11. ALL WALLBOARD NAILS INDICATED IN SCHEDULE SHALL BE 0.120" DIA AND HAVE MINIMUM 3/8" HEAD. 12. STAPLES SHALL BE GALVANIZED, 7/16" MINIMUM CROWN WIDTH AND BE INSTALLED PARALLEL TO FRAMING MEMBERS. 13. 6d NAILS MAY BE SUBSTITUTED WITH NO. 6 1 7/8" TYPE S OR W DRYWALL SCREWS. 14. PROVIDE EXTERIOR GYP BOARD WHERE SHEAR WALL IS AN EXTERIOR WALL. 15. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING TO MATCH THE WALL STUD SIZE. 16. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING 2" NOMINAL OR WIDER. 17. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING 3" NOMINAL OR WIDER. STAGGER NAILS. 18. PROVIDE 1 1/2" MINIMUM PENETRATION INTO STUD AT 10d NAIL AND 1 3/8" MINIMUM AT 8d NAIL. 19. STUDS AT ADJOINING PANEL EDGES SHALL BE 3" NOMINAL WIDTH OR GREATER. 20. USED EITHER SPECIFIED CLIP ANGLE OR NAILING AS SPECIFIED BY REFERRING DETAIL. 21. FOR CLIP ANGLE CONNECTION SHEAR WALL NOTES: SHEAR WALL SCHEDULE WALL PANEL FASTENING TOP AND SILL PLATE FASTENING -SEE NOTE 20 EDGE SPACING INTERMEDIATE SUPPORT SPACING MINIMUM FASTENER SIZE 12"8d COMMON OR GALVANIZED BOX NAIL4" 12"6"8d COMMON OR GALVANIZED BOX NAIL SEE NOTE 16, 18 16, 18 SIMPSON OR USP CLIP ANGLE LS90 OR MP9 @ 16" OC COMMON OR FRAMING NAILS 16d @ 4" OR 3" x 0.131 DIAx3" @ 2" 16d @ 3" OR 3" x 0.131 DIAx3" @ 2" ANCHOR FASTENER TO FOUNDATION WALL 5/8" DIA BOLTS @ 24" OC 5/8" DIA BOLTS @ 32" OC WALL PANEL CONSTRUCTION (1) LAYER 15/32" OSB OR PLYWOOD ONE SIDE OF WALL -BLOCKED (1) LAYER 15/32" OSB OR PLYWOOD ONE SIDE OF WALL -BLOCKED WALL TYPE SWA SWB LS90 OR MP9 @ 12" OC 4/S502. FASTENING SCHEDULE CONNECTION FLOOR OR ROOF TRUSSES / JOISTS TO WALL TOP PLATE OR GIRDER (TOENAIL) RIM BOARD TO FLOOR OR ROOF TRUSSES / JOISTS (FACE NAIL) RIM BOARD TO FLOOR OR ROOF TRUSSES / JOISTS (TOENAIL) RIM BOARD TO TOP PLATE (TOENAIL) BLOCKING BETWEEN TRUSSES / JOISTS TO TOP PLATE (TOENAIL) SILL BOTTOM PLATE TO RIM BOARD OR BLOCKING THROUGH SHEATHING (FACE NAIL) TOP PLATE TO STUD (END NAIL) STUD TO SILL / BOTTOM PLATE (END NAIL) STUD TO SILL / BOTTOM PLATE (TOENAIL) DOUBLE STUDS (FACE NAIL) DOUBLE TOP PLATES -TYPICAL (FACE NAIL) DOUBLE TOP PLATES -48" LAP (FACE NAIL) BUILT-UP HEADER, TWO PLY (FACE NAIL) HEADER TO TRIMMER STUDS (TOENAIL) FULL HEIGHT STUDS TO HEADER (TOENAIL) BUILT-UP GIRDER OR BEAM, MULTIPLE PLY (FACE NAIL) BUILT-UP STUD POSTS OR BUILT-UP CORNER STUDS FLOOR AND ROOF SHEATHING WALL SHEATHING FASTENING (3) 8d COMMON OR (3) 0.131"x3" NAILS (3) 10d COMMON OR (4) 0.131"x3" NAILS (6) 8d COMMON OR (6) 0.131"x3" NAILS 8d COMMON @ 6" OC OR 0.131"x3" NAILS @ 6" OC (3) 8d COMMON OR (3) 0.131"x3" NAILS 16d COMMON @ 16" OC OR 0.131"x3" NAILS @ 8" OC (2) 16d COMMON OR (3) 0.131"x3" NAILS (2) 16d COMMON OR (3) 0.131"x3" NAILS (4) 8d COMMON OR (4) 0.131"x3" NAILS 16d COMMON @ 24" OC OR 0.131"x3" NAILS @ 8" OC 16d COMMON @ 16" OC OR 0.131"x3" NAILS @ 12" OC (2) ROWS OF (8) 10d COMMON OR (2) ROWS OF (12) 0.131"x3" NAILS 10d COMMON OR 0.131"x3" NAILS @ 12" OC ALONG EACH EDGE (4) 8d COMMON OR (4) 0.131"x3" NAILS (4) 8d COMMON OR (4) 0.131"x3" NAILS, EACH SIDE 10d COMMON OR 0.131"x3" NAILS @ 12" OC ALONG EACH EDGE, EACH FACE, BETWEEN EACH PLY 16d COMMON @ 24" OC OR 0.131"x3" NAILS @ 16" OC BETWEEN EACH PLY REFER TO GENERAL NOTES, PLANS & DETAILS REFER TO GENERAL NOTES, PLANS & DETAILS NOTES: 1. PROVIDE THE NAILING NOTED IN THIS SCHEDULE UNLESS MORE STRINGENT NAILING IS NOTED ON THE PLANS OR DETAILS. 2. COMMON NAIL SIZES ARE AS FOLLOWS: -8d = 0.131"⌀x2 1/2" -10d = 0.148"⌀x3" -16d = 0.162"⌀x3 1/2" FOUNDATION PLAN NOTES: 1.FOR STRUCTURAL NOTES SEE S001. 2.TOP OF FOOTING ELEVATION (TFE) = 96'-0" TYP AT EXTERIOR UNO. 3.PROVIDE 5" SLAB ON GRADE REINF W/ #4@16" EW TYP UNO. TOP OF SLAB ELEVATION (TSE) = 100'-0" UNO. SEE CIVIL FOR USGS DATUM ELEVATION. 4.FOR TYPICAL BAR BENDING IN REINFORCED CONCRETE 5.FOR TYPICAL WALL AND CORNER REINFORCING 6.S- -S DENOTES STEPPED FOOTING, SEE TYPICAL STEPPED FOOTING DETAIL 11/S501. 7.SEE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR SLAB SLOPES, DRAINS, CURBS, HOUSEKEEPING PADS, JUNCTION BOXES, CONDUIT AND ALL COORDINATING ITEMS TO BE PLACED IN CONCRETE. 8.FOR UTILITIES RUNNING PERPENDICULAR TO FOUNDATIONS & 9.SHEAR WALLS INDICATED ON PLAN BY: 10.AT TYPICAL FLOOR DRAIN SEE AND AT TYPICA TRENCH DRAIN SEE SEE 9/S501 SEE 12/S501 SEE 11/S501 SEE 10/S501 13/S501. 13/S501 15/S501. SHEAR WALL HOLDOWN SCHEDULE ANCHOR BOLT MIN ANCHOR BOLT EMBED TO CONC 3 1/2"HDU2-SDS2.5 HDU4-SDS2.5 SIMPSON HOLDOWNMARK 5/8" DIA ROD 5/8" DIA ROD 3 1/2" POST WIDTH SIMPSON OPTION SSTB16 SSTB16 1. INSTALL HOLDOWN PER MANUFACTURER SPECIFICATIONS. 2. ALL ANCHOR BOLTS TO BE ASTM F1554 GR. 36 (IF MIN. EMBED LISTED IS "-" USE SIMPSON OPTION) 3. WHEN ANCHORING TO CONCRETE, PROVIDE (2) NUTS & (2) WASHERS REF 18/S501 4. PROVIDE OVERSIZED WASHERS AS REQUIRED 5. CENTER ALL HOLDOWNS & ANCHOR IN STEM WALLS 8" 12" 1 2 DTT2Z ----1/2" DIAx5" TITEN HD--3 Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2024 - ALL RIGHTS RESERVED.3/3/2025 11:57:23 AMS101 FOUNDATION PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/8" = 1'-0"S101 FOUNDATION PLAN1 TRUE NORTH BUILDING 1 PLAN 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 179 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" S502 1______________ RIDGE 4:12 SLOPE4:12 SLOPES502 1______________ S502 3______________ S502 2______________ S502 3______________ OVERHANG 2'-0"OVERHANG3'-0"OVERHANG 2'-0"OVERHANG3'-0"H1H1H1H1H1H1H1H1H1H1H1H140'-0"2x OUTRIGGERS @ 24" OC TYP2x OUTRIGGERS @ 24" OC TYPH2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOWSEE ARCHSEE ARCHH2 H2 H2 H2 H2 H2 H2 H2 H2 H2 H2 H2 TYP S502 5______________ S502 2______________TYP @ WALL S502 5______________ S502 5______________ S502 7______________ TYP INTERIOR DEMISING WALL UNO H2 LOWTYP(12.0 K)(20.0 K)(20.0 K)(20.0 K)(12.0 K)ROOF SHEATHING SEE NOTE 9.2.3 ON SHEET S001 TYP @ OPENING 3/4" TO FIRST TRUSS CL 3/4" TO FIRST TRUSS CL TO TRUSS CL 2 7/8" 2x ENGINEERED TRUSSES @ 24" OC, TYP 2x ENGINEERED TRUSSES @ 24" OC, TYP 2x ENGINEERED TRUSSES @ 24" OC, TYP 2x ENGINEERED TRUSSES @ 24" OC, TYP TO TRUSS CL 2 7/8" TO TRUSS CL 2 7/8" ROOF SHEATHING SEE NOTE 9.2.3 ON SHEET S001 TYP AT WALL TYP AT HEADER HEADER SCHEDULE MARK HEADER KING STUDS COMMENTS H1 H2 (3) 1 3/4x18 LVL (3) 2x8 (2) 2x8 (3) 1 3/4x7 1/4 LVL JACK STUDS (1) 2x8 (2) 1 3/4x7 1/4 LVL AT TRIMMER PROVIDE CS20 PER MANUFACTURER SPEC CENTERED BETWEEN HEADER AND TRIMMER STUD 1.1 1.2 1.A1.B1.C1.D1.E1.F1.G1.H1.I1.J1.K1.L1.M 240'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"40'-0"RIDGE 9'-0"KEY PLAN 9 PSF 52 PSF 30 PSF ROOF FRAMING PLAN NOTES: 1. FOR STRUCTURAL NOTES SEE S001. 2. TRUSS BEARING EL/ TOP OF WALL EL=116'-0" 3. FOR TRUSS PROFILES SEE ARCHITECTURAL DRAWINGS. 4. AXIAL LOADS FOR ENGINEERED TRUSS DESIGN ON PLAN (X.X K) ARE ULTIMATE BASED ON 2018 IBC/ASCE 7-16. 5. SHADED REGION INDICATES HAND/OVER FRAMED DORMER ABOVE TYPICAL ROOF TRUSSES & SHEATHING TO PRODUCE DESIRED ROOF PROFILE. Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2024 - ALL RIGHTS RESERVED.3/3/2025 11:57:24 AMS121 ROOF FRAMING PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2024 JML KAZ SJF/AMR BMS 1/8" = 1'-0"S121 ROOF FRAMING PLAN1 TRUE NORTH BUILDING 1 PLAN 1/8" = 1'-0"S121 SNOW LOAD DIAGRAM2 TRUE NORTH PLAN NOTE: 1.BALANCED SNOW LOAD IS 30PSF 2.UNBALANCED TO BE DESIGNED FOR EACH SIDE OF RIDGE. ONE SIDED CONDITION SHOWN FOR CLARITY. 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 180 STANDARD HOOKS AND BENDS TIES AND STIRRUPS LAP SPLICEOFFSET SPLICE CLASS "B" LAP BAR SIZE x #3 #4 #5 #6 #7 #8 #9 22" 30" 36" 44" 66" 74" 84" NOTES FOR STANDARD HOOK AND BENDS FOR TIES AND STIRRUPS 1) 2) 3) d = BAR DIAMETER D= 6 d FOR #3 THRU #8 D= 8 d FOR #9 THRU #11 D= 4 d FOR #3 THRU #5 D D D D D D 90 DIA 2 1/2" MIN 45 DIA 180 DIA 135 DIA90 DIA 6 d #3 THRU #5 12 d #6 THRU #812d CLASS "B" LAP WIRE TIES 4d WIRE TIES "X"3" MIN."X"3" MIN6d1 6 ddLAP SEE LAP SEECONCRETE FDN WALL AND/OR FOOTINGS CORNER BARS TO MATCH SIZE & QUANTITY OF TYP FTG REINF 1 2 SEE PLAN FOR FOOTING REINF TO LAP & MATCH FOOTING REINF 2S D S SDDTFE SEE PLAN TFE SEE PLAN LAP TYP CLASS B GRADE OR SLAB PIPE TRENCH BACKFILL BOTTOM OF FOOTING SHALL NOT BE HIGHER THAN THIS LINE. LOCATE PIPE FARTHER FROM WALL FOOTING OR STEP FOOTINGS AS REQUIREDBENCH 1'-0"1 2 2'-0" MIN NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING, SHEATHING OR OTHERWISE MAINTAINING THE SIDES OF THE EXCAVATION FROM CAVE-IN UNTIL ALL BACKFILL IS COMPLETED FOUNDATION WALL CONTINUE FOOTING REINF ABOVE OPNG WALL FOOTING 1 1 1/2 PIPE NOTES: 1. 2.PIPES DEEPER THAN 8'-0" BELOW FOOTING DO NOT REQUIRE LEAN CONCRETE FILL, PROVIDE TRENCH COMPACTED PER SPEC REQUIREMENTS. DETAIL APPLIES TO PIPES LESS THAN 3'-0" BELOW FOOTING. FOR PIPES MORE THAN 3'-0" BELOW FOOTING BUT LESS THAN 8'-0" PROVIDE LEAN CONCRETE FILL BELOW FOOTING DOWN TO PIPE INVERT ELEVATION. 2" MIN COMPRESSIBLE MATERIAL 6" 1'-0" 6"MIN2"MIN2"T / 4 MINCONSTRUCTION JOINT CONTROL JOINT 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC (GREASE ONE END) CENTERED ON JOINT, FEILD VERIFY SAW CUT JOINT 1/8"x1/4 DEPTH OF SLAB, MAXIMUM 14'-0" OC EACH WAY TSLAB ON GRADE 10 MIL VAPOR BARRIER COMPACTED GRANULAR FILL SLAB ON GRADE COMPACTED GRANULAR FILL NOTE: 1. FOR UNDER SLAB PREP SEE GEOTECHNICAL EVALUATION REPORT 2. CONTRACTOR TO COORDINATE PLACEMENT OF CONSTRUCTION JOINTS AS REQ'D 3. CONTRACTOR TO COORDINATE LOCATION OF VAPOR BARRIER. 4. PROVIDE 6" MIN VAPOR BARRIER LAP PER MANUFACTURER'S DIRECTION 10 MIL VAPOR BARRIER T/ ?? ??? SEE MECH SLOPE WHERE OCCURS SLOPE SEE MECH SLAB FLOOR DRAIN 7" W/ MNFR VERIFY 7"4"5"1'-0" SLOPE SEE MECH S L O P E S E E M E C H T/ ?? ??? TRENCH DRAIN BY MANUFACTURER SLAB (3) #3 CONT #3 BENT BARS @ 12" OC T/O SLAB EXTEND BARS 1'-0" INTO FUTURE SLAB SLAB ON GRADE FUTURE SLAB ON GRADE BY TENANT SHOWN DASHED MIN 1'-0" 8"8"8"8"T/ FOOTING SEE PLAN TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH VENEER SEE ARCH AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ T/ SLAB 100'-0" 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ 1'-0"(3) #4 CONT T/ CURB FIBER EXPANSION JOINT SEE PLANSLABPLYWOOD SHEATHING CLR TYP 3"CLR3"2'-0" T/ FOOTING SEE PLAN T/ SLAB 100'-0" 8" CONCRETE FOUNDATION WALL W/ #4 @ 16" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ (3) #4 CONT #4x2'-6" @ 32" OC DRILLED & EPOXY INTO CONC WALL W/ 4" EMBED 3'-0" 5" CONC APRON SLAB W/ #4 @ 16" OC EA WAY PAVEMENT BY OTHERS T/ CURB SEE PLANSLABPLYWOOD SHEATHING AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH FIBER EXPANSION JOINT 8"8"8"1'-0"CLR TYP 3"CLR3"2'-0" S LO P E D (2) #4xCONT 6 1/2"8" T/ FOOTING SEE PLAN WALL BEYOND @ EXTERIOR DOORS, TYP T/ SLAB 100'-0" 2'-0"1'-0"CLR3"CLR 3" (3) #4 CONT SEE PLANSLAB8"8"8" TYP #4 BENT DOWEL @ 12" OC 8" CONCRETE FOUNDATION WALL W/ #4 @ 16" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ #4x2'-6" @ 32" OC 3'-0" 5" CONC APRON SLAB W/ #4 @ 16" OC EA WAY PAVEMENT BY OTHERS S LO P E D (2) #4xCONT 6 1/2"8" (2) #4xCONT 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC CENTERED ON JOINT 2'-0" 8"8"8" T/ SLAB SEE PLAN T/ FOOTING SEE PLAN TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ 1'-0"CLR3"CLR 3" (3) #4 CONTSEE PLANSLABFIBER EXPANSION JOINT EACH SIDE WALL SHEATHING SEE ARCH & SHEAR WALL SCHEDULE TYP AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ SEE PLAN SEE PLANSLAB7"WALL SHEATHING SEE ARCH STUD WALL SEE PLAN FOR SIZE & SPACING TREATED 2x SILL PLATE W/ 1/2" DIA SCREW BOLTS & WASHER (3" EMBED) @ 32" OC T/ SLAB SEE PLAN SEE PLANSLABWALL SHEATHING SEE ARCH STUD WALL SEE PLAN FOR SIZE & SPACING CONT SILL PLATE W/ 1/2" DIA SCREW BOLT (3" EMBED) @ 32" OC T/ SLAB SEE PLAN CONT SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH & SHEAR WALL SCHEDULE (3) #4 CONT T/ SLAB SEE PLAN T/ FOOTING SEE PLAN 8" CONCRETE FDN WALL W/ #4 @ 32"OC VERT W/ STD HOOK INTO FOOTING PROVIDE #4 @ 12" OC HORIZ FIBER EXPANSION JOINT EACH SIDE T/ SLAB SEE PLAN 2'-0" 8"8"8"1'-0"CLR3"CLR 3" TYP AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ CLR1 1/2"CLR 2" MIN 4 1/2" POST SEE SCHEDULE T/O FDN WALL TREATED BOT PL HOLDOWN ANCHOR SEE SCHEDULE TYP WALL REINFORCEMENT CONC FDN WALL SEE PLAN & SECTIONS EMBED SEE SCHEDULEHOLDOWN SEE SCHEDULE & PLAN T/ FOOTING SEE PLAN WALL BEYOND @ EXTERIOR DOORS TYP T/ SLAB 100'-0" 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC CENTERED ON JOINT NON-FROST SUSCEPTIBLE FILL DOWN TO FROST PAVEMENT BY OTHERS 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12 OC HORIZ 2'-0"1'-0"CLR3"CLR 3"(3) #4 CONT SEE PLANSLAB8"8"8" TYP #4 BENT DOWEL @ 12" OC SLOPED 1'-0"(2) #4xCONT 5" CONC SLAB W/ #4 @ 16" OC EA WAY 8" 4'-0"4" Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:57:25 AMS501 FOUNDATION DETAILS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/01/2025 JML KAZ SJF/AMR BMS 1/2" = 1'-0"S501 TYP BAR BENDING DETAIL9 1 1/2" = 1'-0"S501 TYP CORNER REINF DETAIL10 1/2" = 1'-0"S501 TYP STEPPED FOOTING DETAIL11 1/2" = 1'-0"S501 TYP FTG PARALLEL TO PIPE12 3/4" = 1'-0"S501 TYP FTG PERPENDICULAR TO PIPE13 1" = 1'-0"S501 TYP INTERIOR SLAB JOINTS17 1/2" = 1'-0"S501 TYP FLOOR DRAIN DETAIL14 3/4" = 1'-0"S501 TYP TRENCH DRAIN DETAIL15 3/4" = 1'-0"S501 TYP SLAB INFILL DETAIL16 1/2" = 1'-0"S501 FOUNDATION DETAIL1 1/2" = 1'-0"S501 FOUNDATION DETAIL2 1/2" = 1'-0"S501 FOUNDATION DETAIL3 1/2" = 1'-0"S501 FOUNDATION DETAIL5 1/2" = 1'-0"S501 FOUNDATION DETAIL7 1/2" = 1'-0"S501 FOUNDATION DETAIL8 1/2" = 1'-0"S501 FOUNDATION DETAIL6 BUILDING 1 3/4" = 1'-0"S501 WALL REINFORCING AT HOLDOWN LOCATION DETAIL18 2025 1/2" = 1'-0"S501 FOUNDATION AT CONCRETE STOOP DETAIL4 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 181 STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH SIMPSON H2A HURRICANE TIE BOTH ENDS EACH TRUSS DOUBLE TOP PL VENEER SEE ARCH TRUSS BEARING SEE PLAN PLAN SEE T/O OPENING SEE ARCH HEADER SEE PLAN PLYWOOD SHEATHING ROOF SHEATHING SEE PLAN PROVIDE BLOCKING FOR SHEATHING ATTACHMENT PER &PREENGINEERED ROOF TRUSS BY OTHERS 6/S502 7/S502 SEE PLAN 12 BLOCK REMAINING HEADER CAVITY IN ORDER TO INSTALL STRAP PER HEADER SCHEDULE SIMPSON SDWC15600 @ 18" OC WALL SHEATHING SEE ARCH 2x BLOCKING BY TRUSS SUPPLIER ROOF SHEATHING SEE PLAN ROOF TRUSS SEE PLAN 2x4 OUTRIGGER @ 24" OC, MAX GABLE STARTER TRUSS VENEER SEE ARCH PLAN SEE SISTER 2x6 TO GABLE VERT WEB @ 48" OC MAX W/ 8d NAILS @ 8" OC L50 EA SIDE OF BRACE SIMPSON H2A HURRICANE TIE TYP 2x6 BRACE @ 4'-0" OC 2x6 BLOCKING AT BRACE LOCS TRUSS BEARING SEE PLAN 1 1 (5) 1/4"x3 1/8" GRK RSS FASTEN BLOCKING TO SHEATHING @ 3" OC SIMPSON A34 TYP DOUBLE TOP PL TRUSS BEARING SEE PLAN ROOF SHEATHING SEE PLAN SIMPSON H2A HURRICANE TIE BOTH ENDS EACH TRUSS PREENGINEERED ROOF TRUSS BY OTHERS STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH DOUBLE TOP PL VENEER SEE ARCH PLYWOOD SHEATHING SEE PLAN 12 PROVIDE BLOCKING FOR SHEATHING ATTACHMENT PER &6/S502 7/S502 SIMPSON SDWC15600 @ 32" OC PLAN SEE STUD WALL SEE PLAN FOR SIZE & SPACING ANGLE CONNECTOR SEE SHEAR WALL SCHEDULE FOR SPACING FOR BRACE BLOCKING AND FASTENING SEE ROOF SHEATHING SEE PLAN ROOF TRUSS DOUBLE TOP PL WALL SHEATHING SEE ARCH 2x6 BRACE @ 8'-0" OC TRUSS BEARING SEE PLAN 1 1 PLYWOOD SHEATHING NOTE: SHEATHING MUST CONTINUE TO ROOF SHEATHING FOR SHEAR WALL. 3/S502 WALL SHEATHING SEE ARCH 2x BLOCKING BY TRUSS SUPPLIER ROOF SHEATHING SEE PLAN ROOF TRUSS SEE PLAN 2x4 OUTRIGGER @ 24" OC, MAX GABLE STARTER TRUSS VENEER SEE ARCH PLAN SEE SISTER 2x6 TO GABLE VERT WEB @ 48" OC MAX W/ 8d NAILS @ 8" OC SIMPSON H2A HURRICANE TIE TYP TRUSS BEARING SEE PLAN DOUBLE TOP PL ANGLE CONNECTOR SEE SHEAR WALL SCHEDULE FOR SPACING NAILING SEE FASTENING TABLE ROOF TRUSSES SEE PLAN SEE PLAN 12 TRUSS BEARING SEE PLAN PLYWOOD SHEATHING NAILING TYP SEE FASTENING TABLE ATTACH BLOCKING TO TRUSS TOP CHORD SEE FASTENING TABLE S501 7______________ 2x BLOCKING (4) SIDES & WEB FILLER ATTACH PER FASTENING TABLE PLAN SEE TRUSS BEARING SEE PLAN ROOF SHEATHING 2x FLAT BLOCKING 2x BLOCKING BETWEEN TRUSS WEBS NAILING TYP SEE FASTENING TABLE TRUSS BEARING SEE PLAN ROOF SHEATHING SEE PLAN 2x BLOCKING @ 2'-0" OC CONTINUE MIN (1) TRUSS SPACE EA SIDE OF WALL WALL SHEATHING SEE ARCH STUD WALL SEE PLAN FOR SIZE & SPACING SIMPSON A35 DOUBLE TOP PL ROOF TRUSS Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:57:25 AMS502 FRAMING DETAILS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/2" = 1'-0"S502 ROOF FRAMING DETAIL1 1/2" = 1'-0"S502 ROOF FRAMING DETAIL3 1/2" = 1'-0"S502 ROOF FRAMING DETAIL2 1/2" = 1'-0"S502 ROOF FRAMING DETAIL5 1/2" = 1'-0"S502 ROOF FRAMING DETAIL4 1/2" = 1'-0"S502 ROOF FRAMING DETAIL6 1/2" = 1'-0"S502 ROOF FRAMING DETAIL7 1/2" = 1'-0"S502 ROOF FRAMING DETAIL8 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 182 PROJECT TEAM OWNER ROBERT L. PAGE PHONE: 952-200-6384 CONTACT: ROBERT PAGE EMAIL: robertlouis.page@gmail.com ARCHITECT: AREA LOCATION SITE LOCATION SHEET INDEX ORONO MINNESOTA VAA, LLC 2300 BERKSHIRE LANE N, SUITE 200 PLYMOUTH, MN 55441 DIRECT: 763-577-9120 FAX: 763-559-0378 CONTACT: MARK MIELKE EMAIL: mmielke@vaaeng.com STRUCTURAL: ORONO SITE LOCATION ORONO GARAGE CONDOS -BUILDING 2 ROBERT L. PAGE ORONO, MN ABBREVIATIONS AB ANCHOR BOLT AC AIR CONDITIONING ACT ACOUSTICAL TILE AFF ABOVE FINISHED FLOOR AL ALUMINUM ALT ALTERNATE ANCH ANCHOR ARCH ARCHITECTURAL BD BOARD BTWN BETWEEN BLDG BUILDING BM BEAM BRG BEARING BSMT BASEMENT BOT BOTTOM BTU BRITISH THERMAL UNIT C/O CLOSED OPENING CCTV CLOSED CIRCUIT TV CFM CUBIC FEET/MINUTE CJ CONTROL JOINT CLG CEILING CMU CONCRETE MASONRY UNIT CO CLEAN OUT COL COLUMN CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CPT CARPET CT CERAMIC TILE CTR CENTER(ed) CW COLD WATER DEMO DEMOLISH DEPT DEPARTMENT DIA DIAMETER DIM DIMENSION DISP DISPENSER DIV DIVISION DN DOWN DO DITTO DR DOOR EA EACH EL ELEVATION ELEC ELECTRIC(al) EIFS EXT INSUL & FIN SYSTEM EQ EQUAL EQUIP EQUIPMENT EW EACH WAY EWC ELECTRIC WATER COOLER EX EXPOSED EXIST EXISTING EXP EXPANSION EXT EXTERIOR FH FULL HEIGHT FAB FABRICATE(ion)(or) FD FLOOR DRAIN FDN FOUNDATION FE FIRE EXTINGUISHER FFE FINISH FLOOR ELEVATION FIN FINSH (ed) FIX FIXTURE FLR FLOOR FT FOOT FTG FOOTING FUT FUTURE GA GAUGE, GAGE GB GRAB BAR GFI GROUND FAULT INTERRUPT GALV GALVANIZED GL GLOSS, GLAZING GPM GALLONS PER MINUTE GYP BD GYPSUM BOARD HB HOSE BIB HC HOLLOW CORE HDBD HEADBOARD HDCP HANDICAPPED HDWD HARDWOOD HDWR HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL (REBAR) HT HEIGHT HVAC HEAT/VENT & AIR COND HW HOT WATER HYD HYDRANT ID INSIDE DIAMETER IN INCH INSUL INSULATION INT INTERIOR INV INVERT ISOL ISOLATION JOINT JAN JANITOR JST JOIST JT JOINT LAV LAVATORY LB POUND MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MET/MTL METAL MFR MANUFACTURER MH MANHOLE MIN MINIMUM, MINUTE MISC MISCELLANEOUS MO MASONRY OPENING MR MOISTURE RESISTIVE N/A NOT APPLICABLE NIC NOT IN CONTRACT NTS NOT TO SCALE OC ON CENTER OH OVERHEAD OPNG OPENING OPP OPPOSITE ORD OVERFLOW ROOF DRAIN PART PARTITION PART BD PARTICAL BOARD PBLG PLUMBING PLF LBS PER LINEAR FOOT PLAM PLASTIC LAMINATE P PROPERTY LINE or PLATE PLYWD PLYWOOD PP POWER POLE PR PAIR PRV POWER ROOF VENT PSF LBS PER SQUARE FOOT PSI LBS PER SQUARE INCH PT POINT PTS PLYWOOD THIS SIDE PVC POLYVINYL CHOLORIDE QR QUARRY TILE QTY QUANTITY R RADIUS, RISER RA RETURN AIR RD ROOF DRAIN REF REFERENCE REFG REFRIGERATOR REG REGISTER REINF REINFORCE (ing)(ed) REQD REQUIRED RET RETURN REV REVERSED RM ROOM RO ROUGH OPENING ROW RIGHT-OF-WAY RTU ROOF TOP UNIT RV ROOF VENT RWL RAIN WATER LEADER SD SOAP DISPENSER SECT SECTION SF SQUARE FOOTAGE SIM SIMILAR SLNT SEALANT SND SANITARY NAPKIN DISP SNR SANITARY NAPKIN RECPT SPEC SPECIFICATION(s) SQ SQUARE SS SERVICE SINK STL STEEL STRUCT STRUCTURE(al) SYST SYSTEM TB TOWEL BAR TD TOWEL DISPENSER TELE TELEPHONE TEMP TEMPERATURE TFE TOP OF FTG ELEV THRES THRESHOLD TPD TOILET PAPER DISPENSER TRANSF TRANSFER TV TELEVISION TYP TYPICAL UNO UNLESS NOTED OTHERWISE UTL UTILITY VCT VINYL COMPOSITION TILE VAV VARIABLE AIR VOLUME VERT(S) VERTICAL (REBAR) VWC VINYL WALL COVERING VRFY VERIFY W/ WITH W/O WITHOUT WC WATER CLOSET WD WOOD WDW WINDOW WP WATERPROOF(ing) WR WATER RESISTIVE WSCT WAINSCOT WT WEIGHT WWF WELDED WIRE FABRIC L DBL DOUBLE DRAFTING SYMBOLS A200 SHEET NUMBER DISCIPLINE COLUMN GRID SECTION NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER SHEET NUMBER ELEVATION NUMBER INTERIOR ELEVATION NUMBER SHEET NUMBER ELEVATIONS REVISION NUMBER KEYNOTE EXISTING SPOT ELEVATION SPOT ELEVATION WALL OR SURFACE MOUNTED FIRE EXTINGUISHER WALL MOUNTED FIRE EXTINGUISHER CABINET RECESSED FIRE EXTINGUISHER AND CABINET ROOM NAME ROOM NUMBER DOOR NUMBER EXISTING WALL, DOOR, FIXTURE, ETC. TO BE REMOVED EXISTING WALL, DOOR, FIXTURE, ETC. TO REMAIN NEW PARTITION PARTITION OR WALL TYPE CONTROL JOINT A2101 2 1 A101______________1 A500 GR ______________1 A400 ______________1 A201 2 G6XSROOM 100 98'-10 1/2" 100'-0" AHJ AUTHORITY HAVING JURISDICTION L ANGLE AHU AIR HANDLING UNIT FDC YD YARD FIRE DEPARTMENT CONNECTION UNOCC UNOCCUPIED MEMB MEMBRANE T/ TOP OF B/ BOTTOM OF LOC(S) LOCATION(s) SCHED SCHEDULE EF EACH FACE IF INSIDE FACE OF OUTSIDE FACE ADDL ADDITIONAL HR HOUR GENERAL NOTES 1. DRAWINGS SHALL COVER THE FULL EXTENT OF THE PROJECT. 2. CONTRACTOR TO COORDINATE ALL WORK WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, SPECIFICATIONS, DRAWINGS AND SUB-CONTRACTORS. 3. CONTRACTOR SHALL VISIT THE SITE, COMPARE DRAWINGS AND SPECIFICATIONS, AND BE KNOWLEDGEABLE OF OTHER WORK BEING PERFORMED. FAILURE OF CONTRACTOR TO VISIT THE SITE SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY TO COMPLETE THE CONTRACT WORK IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS WITHOUT ADDITIONAL COST TO OWNER. 4. ALL DIMENSIONS ON ARCHITECTURAL DRAWINGS LOCATING STRUCTURAL ELEMENTS ARE TO CENTERLINE OF STEEL COLUMNS AND STEEL BEAMS, UNLESS NOTED OTHERWISE. 5. ALL DIMENSIONS LOCATING EXTERIOR WALL SYSTEMS ARE TO EXTERIOR FINISH FACE OR TO INTERIOR FINISH FACE, UNLESS NOTED OTHERWISE. 6. ALL PLAN DIMENSIONS ARE TO FACE OF CONCRETE BLOCK OR GYPSUM BOARD OR TOTAL WALL THICKNESS. SEE FINISH PLAN AND/ OR DETAILS FOR FINISH MATERIALS. APPLIED MATERIALS SUCH AS CERAMIC TILE ARE NOT INCLUDED IN TOTAL PARTITION THICKNESS. 7. ALL CHANGES IN FLOOR FINISHES SHALL OCCUR BENEATH DOORS UNLESS NOTED OTHERWISE OR DETAILED OTHERWISE. 8. PROVIDE FIRE-TREATED WOOD BLOCKING AT ALL WALL HUNG ITEMS ON GYPSUM BOARD PARTITIONS, INCLUDING ALL WALL MOUNTED DOOR STOPS. 9. VERIFY ALL DIMENSIONS BEFORE PROCEEDING WITH WORK. NOTIFY ARCHITECT OF ANY ERRORS AND/ OR DISCREPANCY PRIOR TO PROCEEDING WITH WORK. 10. DO NOT SCALE THE DRAWINGS FOR BUILDING PURPOSES. USE PLAN INFORMATION, DIMENSIONS, SHOP DRAWINGS AND FIELD VERIFICATION FOR ANY CONSTRUCTION. MATERIALS SHIM WOOD BLOCKING METAL BOARD INSUL BATT/BLANKET INSUL PLASTER/GROUT GYPSUM BOARD PARTICAL BOARD PLYWOOD WOOD FINISH STONE BRICK CMU (CONCRETE MASONRY UNIT) CONCRETE GRANULAR FILL EARTH FIN FLR EL = 100'-0" US-12US-12 OLD CRYSTAL BAY RD NWAYZATA BLVDWAYZATA BLVD WILLOW DR NHAGSTROM ENGINEERING 219 6TH AVE E ALEXANDRIA, MN 56308 WORK: 320-759-0764 CELL: 720-560-4942 CONTACT: MATTHEW HAGSTROM EMAIL: mhagstrom@hagstromeng.com CIVIL: STRUCTURAL S001 S101 STRUCTURAL NOTES FOUNDATION PLAN ROOF FRAMING PLANS121 S122 ROOF SNOW LOAD PLAN CODE LIFE SAFETY CL100 CL101 CODE DIAGRAM SITE PLAN AND CODE SUMMARY FOUNDATION PLAN ARCHITECTURAL A101 A110 FLOOR AND ROOF PLANS REFLECTED CEILING PLAN EXTERIOR ELEVATIONSA201 A220 BUILDING SECTIONS A301 WALL SECTIONS A601 WALL PARTITION TYPES, DOOR & FRAME ELEVATIONS, and SCHEDULES CIVIL -HAGSTROM ENGINEERING C1.0 C2.0 COVER SHEET EXISTING SITE & DEMO PROPOSED SITE PLANC3.0 C3.1 PROPOSED UTILITY PLAN C4.0 PRELIMINARY GRADING & EROSION CONTROL PLAN C5.0 CONSTRUCTION DETAILS C5.1 CONSTRUCTION DETAILS C5.2 CONSTRUCTION DETAILS G001 COVER SHEET SHEET #SHEET DESCRIPTION S501 FOUNDATION DETAILS S502 FRAMING DETAILS 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:05 PMG001 COVER SHEET ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 0 03/03/25 ISSUED FOR CONSTRUCTION MGH VAA, LLC 2300 BERKSHIRE LANE N, SUITE 200 PLYMOUTH, MN 55441 DIRECT: 763-577-9198 FAX: 763-559-0378 CONTACT: TRAVIS R. BECK, EMAIL: tbeck@vaaeng.com HIT AR HI AR HI , NCARB TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 183 BUILDING 3 S-1 FUTURE BUILDING 4 FUTURE BUILDING 5 BUILDING 2 S-1 BUILDING 1 S-1 BUILDING CODES 2020 MINNESOTA BUILDING CODE (2018 IBC BASE) 2020 MINNESOTA FIRE CODE (2018 IFC BASE) 2020 MINNESOTA ENERGY CONSERVATION CODE 2020 MINNESOTA MECHANICAL CODE 2020 MINNESOTA PLUMBING CODE 2020 NATIONAL ELECTRICAL CODE OSHA 1910 2010 ADA STANDARDS OCCUPANCY: 311.1 S-1 MODERATE-HAZARD STORAGE (MOTOR VEHICLE RELATED OCCUPIANCIES) CONSTRUCTION TYPE: 602.5 TYPE V-B, SPRINKLERED GENERAL BUILDING HEIGHTS: TABLE S-1 OCCUPANCY, TYPE V-B CONSTRUCTION 504.3 ALLOWABLE:60’, 2 STORIES ACTUAL: B1 / B2 24'-1" / 21’-6”, 1 STORY GENERAL BUILDING AREAS: 506.2 ALLOWABLE (1-STORY):36,000 SF ACTUAL: PHASE I • BUILDING 1 • (40’x 240’)9,600 SF • BUILDING 2 • (40’x 260)10,400 SF • (46’x 275’)12,650 SF 23,050 SF FIRE SEPARATIONS TABLE 508.4 REQUIRED SEPARATION OF OCCUPANCIES S-1 to S-1 = NO RATING REQUIRED FIRE-RESISTANCE RATING REQUIREMENT, TYPE V-B TABLE 601 STRUCTURAL FRAME:0-HOUR EXT BEARING WALLS:0-HOUR INT BEARING WALLS:0-HOUR NONBRG WALLS:FLOOR 0-HOUR CONSTRUCTION:ROOF 0-HOUR CONSTRUCTION:0-HOUR 602.5 TYPE V CONSTRUCTION: STRUCTURAL ELEMENTS, EXTERIOR WALLS AND INTERIOR WALLS ARE OF ANY MATERIALS PERMIITED BY THIS CODE. MAXIMUM AREA OF EXTERIOR WALL OPENINGS TABLE 705.8 X IS GREATER THAN 10' AND LESS THAN 30' FIRE SEPARATION DISTANCE FOR S1 IS 0-HR 718.4.3 DRAFTSTOPPING IS NOT REQUIRED AS CONCEALED SPACE IS FULLY SPRINKLED. FINISHES: TABLE 803.13 FIRE CLASSIFICATIONS FOR FINISHES SPRINKLERED S EXIT ENCL & EXIT PASSAGEWAYS C CORRIDORS C ROOMS and ENCLOSED SPACES C FIRE PROTECTION SYSTEMS: 903.2.9 AUTOMATIC SPRINKLER SYSTEM TO BE PROVIDED IN S-1 OCCUPANCIES WHEN FIRE AREA EXCEEDS 12,000 SF OR AREA IS LOCATED MORE THAN THREE STORIES ABOVE GRADE. TABLE PORTABLE FIRE EXTINGUISHERS FOR CLASS A FIRE HAZARDS 906.3(1)75’MAX TRAVEL DISTANCE TO AN EXTINQUISHER, 11,250 SF MAXIMUM FLOOR AREA FOR EXTINQUISHER. 910.2.(2)SMOKE AND HEAT REMOVAL NOT REQUIRED WHEN PROTECTED BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM. • SPRINKLERS ARE PROVIDED MEANS OF EGRESS: TABLE OCCUPANCY 1004.5 MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT STORAGE = 300 SF (GROSS)/OCCUPANT • SEE CODE DIAGRAMS FOR OCCUPANCY COUNTS 1005.3.2 .15”/OCCUPANT FOR ALL OTHER MEANS OF EGRESS • SEE CODE DIAGRAMS FOR EGRESS WIDTHS PROVIDED TABLE COMMON PATH ALLOWABLE WITH ONE EXIT (SPRINKLERED) 1006.2.1 GROUP S = 75’ • 1 EXITS PROVIDED PER LEVEL TABLE 2 EXITS REQUIRED WHEN OCCUPANT LOADS EXCEED: 1010.1.1 MINIMUM CLEAR WIDTH OF DOOR TO BE 32” 1010.1.3 MAXIMUM PULL OR PUSH FORCE FOR EGRESS DOORS TO BE 5 POUNDS. 1010.1.5 THERE IS TO BE A LANDING EACH SIDE OF A DOOR. LANDING TO BE LEVEL WITH A MAXIMUM SLOPE OF 2-PERCENT. 1010.1.6 LANDING WIDTH TO BE A MINIMUM EQUAL TO THE WIDTH OF THE DOOR. 1010.1.7 MAXIMUM ½-INCH THRESHOLD AT DOORS. 1013.1 EXIT SIGNS TO BE PROVIDED AT EXIT DOORS PER SECTION 1011.1 TABLE S-1 OCCUPANCY SPRINKLERED -MAXIMUM TRAVEL DISTANCE: 1017.2 ALLOWABLE:250’-0” ACTUAL:54’-0” MEANS OF EGRESS ILLUMINATION 1008.2 MEANS OF EGRESS, INCLUDING EXIT DISCHARGE, TO BE ILLUMINATED AT ALL TIMES THE BUILDING IS OCCUPIED. 1008.2.1 MEANS OF EGRESS ILLUMINATION LEVEL TO BE NOT LESS THAN 1 FC AT THE WALK SURFACE. 1008.3.1 EMERGENCY POWER FOR ILLUMINATION • IN THE EVENT O F A POWER SUPPLY FAILURE IN BUILDING REQUIRED TO HAVE TWO OF MORE EXITS; EMERGENCY POWER TO ILLUMINATE THE FOLLOWING: INTERIOR EXIT ACCESS STAIRWAY, INTERIOR AND EXTERIOR STAIRWAYS, EXIT PASSAGE WAYS, EXTERIOR LANDINGS FOR EXIT DOORS 1008.3.4 EMERGENCY POWER SHALL PROVIDE POWER FOR A DURATION OF 90-MINUTE, MINIMUM. 1009.1 ACCESSIBLE SPACES TO BE PROVIDE WITH NOT LESS THAN ONE ACCESSIBLE MEANS OF EGRESS. WHERE MORE THAN ONE MEANS OF EGRESS IS PROVIDED, NOT LESS THAN TWO ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED. SEE SECTION 1103.2.9 FOR AREAS NOT REQUIRED TO BE ACCESSIBLE. EXIT SIGNS 1013.1 EXIT AND EXIT ACCESS DOORS TO BE MARKED WITH APPROVED EXIT SIGN READILY VISIBLE FROM ANY DIRECTION OF TRAVEL. EXIT SIGN PLACEMENT TO BE SUCH THAT NO POINT IN AN EXIT CORRIDOR OR PASSAGEWAY IS MORE THAN 100’OR THE VIEW DISTANCE LISTED FOR THE SIGN, WHICHEVER IS LESS. 1013.3 EXIT SIGNS TO BE INTERNALLY OR EXTERNALLY ILLUMINATED. 1013.5 INTERNALLY ILLUMINATED EXIT SIGNS: SIGN TO BE LISTED AND LABELED IN ACCORDANCE WITH UL 924. BE ILLUMINATED AT ALL TIMES. 1013.6.2 EXIT SIGN ILLUMINATION TO HAVE INTENSITY OF NOT LESS THAN 5 FC (54 LUX) 1013.6.3 EXIT SIGN TO BE ILLUMINATED AT ALL TIMES AND ILLUMINATED FOR A MINIMUM OF 90 MINUTES IN THE CASE OF A LOSS OF POWER. ROOF ASSEMBLIES AND ROOFTOP STRUCTURES TABLE 1505.1 MINIMUM ROOF COVERING CLASS FOR TYPE II B:CLASS C 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:07 PMCL100 CODE DIAGRAM SITE PLAN AND CODE SUMMARY ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB CODE SUMMARY 1/16" = 1'-0"CL100 CODE SITE PLAN1 NORTH 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 184 B2 T/ SLAB EL 100'-0" B2 T/WALL EL 116'-0" 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M B2 T/ SLAB 1 EL 99'-4" B2 T/ SLAB 2 EL 98'-8" 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 B2 ROOF RIDGE EL 133'-9" CL101 1______________ T/ MIDD WALL EL 125'-0" 275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" UNIT 35 UNIT 34 UNIT 33 UNIT 32 UNIT 31 UNIT 30 UNIT 29 UNIT 28 UNIT 27 UNIT 26 1-HR RATED WALL SYSTEM S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1 B2 T/ SLAB EL 100'-0" 2.1 2.2 2.3 B2 T/ SLAB 1 EL 99'-4" B2 ROOF RIDGE EL 133'-9" CL101 3______________ T/ MIDD WALL EL 125'-0" 86'-0" 46'-0"40'-0" UNIT 18 UNIT 29 S-1 S-1 WALL HUNG FIRE EXTINGUISHER 2.1 2.2 2.3 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 FFFFFFFFFF33333333333333333333F33F3311'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" 275'-0"F33F33F33F33F33F33F33F33F33F3386'-0"40'-0"46'-0"CL101 3______________ CL101 1______________ 33 33 FF732 SF 3 OCC UNIT 25 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 24 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 23 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 22 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 21 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 20 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 19 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 18 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 17 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 16 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 15 S-1 V-B SP COND N N N 300Y 750 SF 3 OCC UNIT 14 S-1 V-B SP COND N N N 300Y 732 SF 3 OCC UNIT 13 S-1 V-B SP COND N N N 300Y 1,040 SF 4 OCC UNIT 35 S-1 V-B SP COND N N N 300Y 1,046 SF 4 OCC UNIT 34 S-1 V-B SP COND N N N 300Y 1,046 SF 4 OCC UNIT 33 S-1 V-B SP COND N N N 300Y 1,046 SF 4 OCC UNIT 32 S-1 V-B SP COND N N N 300Y 1,046 SF 4 OCC UNIT 31 S-1 V-B SP COND N N N 300Y 1,360 SF 5 OCC UNIT 30 S-1 V-B SP COND N N N 300Y 1,360 SF 5 OCC UNIT 29 S-1 V-B SP COND N N N 300Y 1,360 SF 5 OCC UNIT 28 S-1 V-B SP COND N N N 300Y 1,360 SF 5 OCC UNIT 27 S-1 V-B SP COND N N N 300Y 1,196 SF 4 OCC UNIT 26 S-1 V-B SP COND N N N 300Y 64 SF 1 OCC UTILITY RM S-1 V-B SP COND N N N 300Y 65 SF 1 OCC UTILITY RM S-1 V-B SP COND N N N 300YF33XTRAVEL DISTANCE TO EXIT= 53'-8" X TRAVEL DISTANCE TO EXIT= 70'-5" X TRAVEL DISTANCE TO EXIT= 63'-0" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" 1-HR FIRE WALL SYSTEM CODES CODE SYMBOL KEY 2020 MINNESOTA BUILDING CODE -2018 IBC AMENDED 2020 MINNESOTA FIRE CODE -2018 IFC AMENDED 2020 MINNESOTA MECHANICAL CODE -2018 IMC AMENDED 2020 MINNESOTA ELECTRICAL CODE -2020 NFPA 70 AMENDED 2024 MINNESOTA ENERGY CODE w/ ANSI/ ASHRAE/ IES STANDARD 90.1 -2019 2020 MINNESOTA PLUMBING CODE -2018 UPC AMENDED 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN CODE GENERAL NOTES EXIT WIDTH IN INCHES EXIT LOCATION EXIT SIGN w/ EMERGENCY LIGHT FIRE EXTINGUISHER 1 HR WALL w/ 60 MIN FIRE DOOR ASSEMBLY F FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION)S HI-LO DRINKING FOUNTAIND H FIRE HYDRANT PANIC HARDWARE WINDOW EGRESS 1. SEE SHEETS CL100-CL101 FOR APPLICABLE CODES & CODE SYMBOL KEY. 2. SEE SHEET CL100 FOR CODE SUMMARY. 3. CLEAR OPENING WIDTH IS TYPICALLY THE NOMINAL WIDTH MINUS 3 INCHES FOR SINGLE LEAF & MINUS 5 INCHES FOR SINGLE EGRESS PAIR OF DOORS. 1 HR FLOOR SYSTEM 2 HR WALL w/ 90 MIN FIRE DOOR ASSEMBLY PROOM NAME OCCUPANCY CONSTRUCTION TYPE FIRE SUPPRESSION NS: NON SPRINKLERED SP: SPRINKLERED CONDITIONED (COND) OR NON-CONDITIONED (NON-COND) ALARM SYSTEM Y -YES N -NO HAZARDOUS CLASSIFICATION GROUP HAZARDOUS CLASSIFICATION DIVISION HAZARDOUS CLASSIFICATION CLASS OCCUPANY LOAD FACTOR OCCUPANCY LOAD/ UNOCC IF BLANK AREA SPACE S-1 IIB NS N COND 2 2 G 11,567 SF 100 --- 3 HR WALL w/ 180 MIN FIRE DOOR ASSEMBLY W 33 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:08 PMCL101 CODE DIAGRAMS MAIN LEVEL AND SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1/8" = 1'-0"CL101 CODE DIAGRAM FLOOR PLAN2 1/8" = 1'-0"CL101 CODE DIAGRAM BUILDING SECTION3 1" = 10'-0"CL101 CODE DIAGRAM BUILDING SECTION1 NORTH 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 185 FLOOR PLAN GENERAL NOTES 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. SEE SHEETS CL100 - CL101 FOR CODE DIAGRAMS AND SUMMARY. 3. SEE SHEET A601 FOR WALL & PARTITION SCHEDULES & DOOR SCHEDULE. 4. SEE SHEET A601 FOR DOOR & WINDOW TYPES & ELEVATIONS. PARTITION SYMBOL KEY G6XSA 1 HR S INSULATED WALL OR PARTITION X FIRE RATED CONSTRUCTION MATERIAL THICKNESS -SEE A601 WALL RATING WALL OR PARTITION TYPE: G INTERIOR GYPSUM BOARD PARTITION M MASONRY WALL SW SHAFT WALL W EXTERIOR WALL SYSTEM C CONCRETE WALL MLP METAL LINER PANEL IMP INSULATED METAL PANEL FLOOR PLAN KEYNOTES# A ONE SIDED WALL OR PARTITION 2.1 2.2 2.3 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M A220 1______________ 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 86'-0"40'-0"46'-0"275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" 214A 216A215A 217A 218A 219A 221A 222A 223A 201A202A203A204A205A206A207A208A209A210A211A212A213A 213212211210209208207206205204203202201225 224 223222219218217216215214UNIT 13 201 UNIT 14 202 UNIT 15 203 UNIT 16 204 UNIT 17 205 UNIT 18 206 UNIT 19 207 UNIT 20 208 UNIT 21 209 UNIT 22 210 UNIT 23 211 UNIT 24 212 UNIT 25 213 UNIT 35 214 UNIT 34 215 UNIT 33 216 UNIT 32 217 UNIT 31 218 UNIT 30 219 UNIT 29 220 UNIT 28 221 UNIT 27 222 UNIT 26 223 A201 1______________ 35 30 TYP TYP TYP 39TYP 33TYP A201 2______________ A201 3______________ 100TYP G7S G7S G7S G7S G7S G7S G7S G8S G7S G7S G7S G7S T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" GW6 T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" G7XS G7XS 1G7SG7SG7SG7SG8SG7SG7SG7SG7S W9S UTILITY 225 UTILITY 224 T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 99'-4" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0" T/ FLOOR EL 100'-0"220220A A220 2______________ GW6 W9S W9S W9S A201 4______________GW62213 85TYP A301 3______________ 2.1 2.2 2.3 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M A220 1______________ 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 86'-0"40'-0"46'-0"275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" A201 3______________ A201 1______________ A201 4______________ A201 2______________4 1/2" / 12"SLOPESLOPE4" / 12"4" / 12"4" / 12"4" / 12"4" / 12"4" / 12"4" / 12" 4" / 12"4" / 12"4" / 12"4" / 12" 9999 TYP 85 TYP 79 TYP A220 2______________OVERHANG3'-0"OVERHANG3'-0"4" / 12"4" / 12" SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPESLOPESLOPESLOPESLOPESLOPE 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:09 PMA101 FLOOR AND ROOF PLANS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1 CONC STOOP, SLOPED - SEE STRUCT 3 CONC APRON - SEE STRUCT 30 HM DOOR & FRAME - PAINTED 33 OH SECTIONAL DOOR SYSTEM 35 METAL THRESHOLD 39 LINE OF OH DOOR ABOVE 79 CONT. RIDGE VENT 85 PREFINISHED METAL GUTTER & DOWNSPOUT SYSTEM 99 ASPHALT SHINGLE ROOF SYSTEM 100 FE - WALL-HUNG NORTH NORTH 1/8" = 1'-0"A101 FLOOR PLAN1 1/8" = 1'-0"A101 ROOF PLAN2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 186 REFLECTED CEILING GENERAL NOTES ACOUSTICAL CEILING TILE AND SUSPENDED GRID SYSTEM GYPSUM BOARD OR PLASTER CEILING EXPOSED STRUCTURE 2x4 LED LIGHT FIXTURE 1x4 LED LIGHT FIXTURE RECESSED DOWN LIGHT WALL MOUNTED LIGHT FIXTURE 2x2 SUPPLY AIR GRILLE 2x2 RETURN AIR GRILLE 6x2 RETURN AIR GRILLE WALL OR PARTITION TO UNDERSIDE OF DECK 2x4 SUSPENDED LED LIGHT FIXTURE EXIT SIGN SUSPENDED LED STRIP LIGHT FIXTURE 2 HR WALL w/ 2 HR OPENING 1 HR WALL w/ 60 MIN FIRE DOOR ASSEMBLY 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. REFERENCE TO CEILING AND SOFFIT HEIGHTS ARE ABOVE FINISHED FLOOR ELEVATION. 3. LIGHT FIXTURES AND ACT ARE TO BE CENTERED IN BOTH DIRECTIONS WITHIN ROOM OF AREA UNO. 3 HR WALL w/ 3 HR OPENING REFLECTED CEILING PLAN SYMBOL KEY REFLECTED CEILING PLAN KEYNOTES# 2.1 2.2 2.3 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 A220 1______________ A201 1______________ A201 3______________ A201 2______________ A201 4______________86'-0"40'-0"46'-0"275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" 151151 TYP TYP 153 TYP 33 TYP UNIT 26 223 UNIT 27 222UNIT 29 220 UNIT 30 219 UNIT 31 218 UNIT 32 217 UNIT 33 216 UNIT 34 215 UNIT 35 214 UNIT 28 221 UTILITY UTILITY 224 225 UNIT 13 201 UNIT 14 202 UNIT 15 203 UNIT 16 204 UNIT 17 205 UNIT 18 206 UNIT 19 207 UNIT 20 208 UNIT 21 209 UNIT 22 210 UNIT 23 211 UNIT 25 214 UNIT 24 213 151151 A220 2______________ 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:11 PMA110 REFLECTED CEILING PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB NORTH 33 OH SECTIONAL DOOR SYSTEM 151 GYP BD CEILING 153 VINYL SOFFIT 1/8" = 1'-0"A110 REFLECTED CEILING PLAN1 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 187 EXTERIOR ELEVATION GENERAL NOTES 1. SEE SHEET G001 FOR TYPICAL NOTES. 2. SEE SECTIONS & DETAILS FOR ADDITIONAL MATERIAL & FINISH INFORMATION. 3. SEE A601 FOR FRAME ELEVATIONS & GLASS TYPES. EXTERIOR ELEVATION KEYNOTES# B2 T/ SLAB EL 100'-0" B2 T/WALL EL 116'-0" 2.12.22.3 A220 1______________ B2 ROOF RIDGE EL 133'-9" T/ MIDD WALL EL 125'-0" 86'-0" 46'-0"40'-0" DR 224 DR 225TYP9'-0"EQEQ 4" 12" 4 1/2" 12" 30 240 TYP TYP 1 A601 5 A601 3 A601 B2 T/ SLAB EL 100'-0" B2 T/WALL EL 116'-0" 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M B2 T/ SLAB 1 EL 99'-4" B2 T/ SLAB 2 EL 98'-8" 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 B2 ROOF RIDGE EL 133'-9" T/ MIDD WALL EL 125'-0" 275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" DR 214A DR 214 DR 215 DR 215A DR 216A DR 216 DR 217 DR 217A DR 218A DR 218 DR 219 DR 219A DR 221A DR 222A DR 222 DR 223 DR 223A 4" 12" 4" 12" 4" 12" 4" 12" DR 220 DR 220A 57 56 58 99TYP TYP TYP TYP 4 A601 2 A601 6 A601 A220 2______________ DR 221 4" 12"4" 12" B2 T/WALL EL 116'-0" 2.1 2.2 2.3 B2 T/ SLAB 2 EL 98'-8" A220 1______________ B2 ROOF RIDGE EL 133'-9" T/ MIDD WALL EL 125'-0" 86'-0" 46'-0"40'-0" 4 1/2" 12" 4" 12" B2 T/ SLAB EL 100'-0" B2 T/WALL EL 116'-0" 2.A 2.B 2.C 2.D 2.E 2.F 2.G 2.H 2.I 2.J 2.K 2.L 2.M B2 T/ SLAB 1 EL 99'-4" B2 T/ SLAB 2 EL 98'-8" 2.B1 2.C1 2.D1 2.D2 2.E1 2.F1 2.G1 2.H1 2.I1 2.I2 2.J1 B2 ROOF RIDGE EL 133'-9" 275'-0" 4'-0"20'-0"7'-0"13'-0"17'-9"2'-3"20'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"15'-0"5'-0"19'-0"1'-0"20'-0"3'-0"17'-0"7'-0"13'-0"11'-0" DR 201A DR 202A DR 203A DR 204A DR 205A DR 206A DR 207A DR 208A DR 209A DR 210A DR 211A DR 212A DR 213A DR 201 DR 202 DR 203 DR 204 DR 205 DR 206 DR 207 DR 208 DR 209 DR 210 DR 211 DR 212 DR 213 A220 2______________ 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:13 PMA201 EXTERIOR ELEVATIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 30 HM DOOR & FRAME - PAINTED 56 HARDIE SMOOTH SURFACE (CHARCOAL) 57 4'x8' STUCCO TEXTURE PANEL (CHARCOAL) 58 FAUX STONE, MISSION POINT - BY VERSETTA 99 ASPHALT SHINGLE ROOF SYSTEM 240 LIGHT 1/8" = 1'-0"A201 NORTH EXTERIOR ELEVATION1 1/8" = 1'-0"A201 EAST EXTERIOR ELEVATION2 1/8" = 1'-0"A201 SOUTH EXTERIOR ELEVATION3 1/8" = 1'-0"A201 WEST EXTERIOR ELEVATION4 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TYP TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 188 B2 T/ SLAB EL 100'-0" 2.A2.B2.C2.D2.E2.F2.G2.H2.I2.J2.K2.L2.M B2 T/ SLAB 1 EL 99'-4" B2 T/ SLAB 2 EL 98'-8" 2.B12.C12.D12.D22.E12.F12.G12.H12.I12.I22.J1 B2 ROOF RIDGE EL 133'-9" T/ MIDD WALL EL 125'-0" 275'-0" 11'-0"13'-0"7'-0"17'-0"3'-0"20'-0"1'-0"19'-0"5'-0"15'-0"9'-0"11'-0"20'-0"20'-0"11'-0"9'-0"20'-0"2'-3"17'-9"13'-0"7'-0"20'-0"4'-0" UNIT 33 216 UNIT 34 215 UNIT 35 214 UNIT 32 217 UNIT 31 218 UNIT 30 219 UNIT 29 220 UNIT 28 221 UNIT 27 222 UNIT 26 223 G7S G7S G7S G7S G8S G7S G7S G7S G7S W9S W9S A220 2______________ B2 T/WALL EL 116'-0" 2.1 2.2 2.3 B2 T/ SLAB 1 EL 99'-4" A220 1______________ B2 ROOF RIDGE EL 133'-9" T/ MIDD WALL EL 125'-0" ______________ A301 1 ______________ A301 2 86'-0" 46'-0"40'-0" PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER CONC SLAB - SEE STRUCT CONC FTG - SEE STRUCT HIP SET @ FAUX DORMER, SEE S201 CONT. RIDGE VENT TRACKS ARE MOUNTED PARALLEL TO CEILING UNIT 20 208 UNIT 30 219 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:15 PMA220 BUILDING SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 1/8" = 1'-0"A220 BUILDING SECTION1 1/4" = 1'-0"A220 BUILDING SECTION2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 189 B2 T/WALL EL 116'-0" 2.1 B2 T/ SLAB 1 EL 99'-4" VENTED VINYL SOFFIT, TYP PRE-FIN MTL DRIP & TRIM, TYP SIMPSON CLIP - SEE STRUCT, TYP DOUBLE 2x PLATE SEE STRUCT PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER, TYP REINF CONCRETE SLAB SEE STRUCT SHINGLE ROOFING OVER ICE AND WATER SHIELD FIRST 8'-0" AND 3'-0" IN VALLEYS 30lb ROOFING FELT OVER 5/8" OSB, TYP METAL LINER CEILING PANEL, TYP R49 BLOWN-IN INSULATION, TYP LP EXTERIOR FINISH TRIM, TYP PRE-FIN MTL GUTTER AND DOWNSPOUT, TYP HEADER FRAME, SEE STRUCT W9S 3'-8"STONE VENEER CONT RIDGE VENT PROVIDE HOLES IN PLYWOOD FOR VENTING AS REQUIRED VAPOR BARRIER OVER 6" COMPACTED SAND, TYP 2" RIGID INSULATION, TYP B2 T/WALL EL 116'-0" 2.3 B2 T/ SLAB 1 EL 99'-4" VENTED VINYL SOFFIT, TYP PRE-FIN MTL DRIP & TRIM, TYP PRE-ENGINEERED ROOF TRUSS BY OTHERS, COORDINATE BOTTOM CHORD SLOPE WITH TRUSS SUPPLIER, TYP SHINGLE ROOFING OVER ICE AND WATER SHIELD FIRST 8'-0" AND 3'-0" IN VALLEYS, 30lb ROOFING FELT OVER 5/8" OSB, TYP SIMPSON CLIP SEE STRUCT HEADER FRAME SEE STRUCT METAL LINER CEILING PANEL, TYP DOOR, SEE SCHED W9S 3'-8"STONE VENEER CONT RIDGE VENT PROVIDE HOLES IN PLYWOOD FOR VENTING AS REQUIRED B2 T/ SLAB EL 100'-0" 2.A2.B B2 MEZZANINE 1 EL 112'-2" 1/2" PLYWOOD SHEATHING 2x8 WD STUDS 16" OC BATT INSUL (2) LAYERS TYPE X GYP (UL SYSTEM RC-2601) FIRE RATED SEALANT AND BACKER SEALANT AND BACKER (2) LAYERS TYPE X GYP SEALANT AND BACKER 2x8 RIM BOARD TREATED 2X BOT PL W/ (1) 1/2" DIA SCREW BOLT W/ 3" EMBED INTO SLAB @ 32" OC SIMPSON H2A CLIP SIMPSON LUS 28 2X8 CONT LEDGER W/ (2) 5/16" DIAX5 1/8" GRK RSS TO WALL STUD G7XS UTILITY11'-4 1/4"763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:16 PMA301 WALL SECTIONS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB 3/4" = 1'-0"A301 WALL SECTION1 3/4" = 1'-0"A301 WALL SECTION2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH 3/4" = 1'-0"A301 SECTION AT UTILITY3 TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 190 DOOR SCHEDULE DOOR MAT'L TYPEFIRE RATING A B C D E N WD OAK BIRCH PLAM HM AL/GL FIB DOOR FRAME MAT'L TYPEGLAZING TYPE T TT I IT HM AL WD STL C - 3 HOUR - 1 1/2 HOUR - 1 HOUR - 3/4 HOUR - 20 MINUTE - NO RATING - CLEAR TEMPERED GLASS - TINTED & TEMPERED GLASS - INSULATED - INSULATED TEMPERED - FIRE RATED CERAMIC GLASS - WOOD (AS SPECIFIED) - OAK WOOD - BIRCH WOOD - PLASTIC LAM CLAD - HOLLOW METAL - ALUMINUM & GLASS - FIBERGLASS - HOLLOW METAL - ALUMINUM - WOOD - STEEL HARDWARE GROUP GROUP 1 1.5 PR BB BUTT 1 SET THRESHOLD 1 SET WEATHERSTRIPPING 1 EA SWEEPS 1 ENTRY LOCK, LEVER HANDLE, BRUSHED CHROME FINISH 1 EA. DOOR CLOSER 1 EA WALL STOP GROUP 2 HARDWARE BY DOOR MANUF. A SINGLE PANEL B SECTIONAL OVERHEAD DOOR VISION PANEL (4-THUS) 2"2"SEE SCHED2"SEE SCHED F1 PARTITION & WALL TYPES W9S PARTITION W7S LP SMART SIDE BD BATTEN SIDING WATER & AIR BARRIER 1/2" DENSGLASS SHEATHING 2x6 WD STUD @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE "X" INTERIOR GYP BD PARTITION TYPE W9S (SHEAR WALL) LP SMARTSIDE BD & BATTEN SIDING WATER & AIR BARRIER 1/2" EXTERIOR OSB SHEATHING 2x8 WD STUDS @ 16" OS 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE "X" INTERIOR GYP BD PARTITION TYPE W10S LP SMARTSIDE BD & BATTEN SIDING WATER & AIR BARRIER 1/2" DENSGLASS SHEATHING 2x8 STUDS @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE X INTERIOR GYP BD W10S 7 1/8" . 8 7/8" . 2 PARTITION TYPE G9S 1/2" EXTERIOR OSB SHEATHING 2x8 WD STUD @ 16" OC 3.5" CLOSED CELL FOAM INSULATION 5/8" TYPE X INTERIOR GYP BD G9S W7S 2 . 8 7/8" PARTITION TYPE G8S (SHEAR WALL) 5/8" TYPE "X" GYP. BD. 2x8 WD STUD @ 16" OC SOUND BATT INSULATION 5/8" TYPE "X" GYP. BD 8 1/4" 2 G8S 8 3/8" PARTITION TYPE G7XS 5/8" TYPE 'X' GYP BD 2x6 WD STUD @ 16" OC SOUND BATT INSULATION 5/8" TYPE "X" GYP BD 6 3/4" 2 G7XS EXTERIOR INTERIOR 1 HOUR WALL SYSTEM UL 305 DOOR FRAME PER SCHED THRESHOLD BELOW SEALANT & BACKER (BOTH SIDES) 2 2 BUILDING WRAP TO CONTINUE UNDER DOOR FRAME 5/8" GYP BD RETURN w/ CORNER BEAD SHIM AS REQ'D PRE-FIN MTL TRIM EXTERIOR FINISH TRIM - WHITE NOTE: SEE A101 FOR PARTITION TYPE 2 2 2 BUILDING WRAP TO CONTINUE AROUND DOOR FRAME EXTERIOR FINISH TRIM - WHITE WEATHERSTRIP CONT @ PERIMETER OH DR SUPPORT & ANGLE GUIDES CONT BEAD OF SEALANT @ PERIMETER NOTE: SEE A101 FOR PARTITION TYPE 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED. BUILDING 2 3/3/2025 12:30:18 PMA601 WALL PARTITION TYPES, DOOR & FRAME ELEVATIONS, and SCHEDULES ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 MGH MGH/ DRM/ BCF TRB TRB DOOR FRAME FIRE RATING HDWR GROUP DETAILS NOTESNUMBER LEAF WIDTH LEAF HEIGHT ELEV MATL GLAZ INSULATED ELEV DEPTH MATL GLAZ INSULATED HEAD JAMBS SILL SINGLE LEAF 201 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 202 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 203 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 204 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 205 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 206 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 207 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 208 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 209 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 210 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 211 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 212 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 213 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 214 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 215 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 216 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 217 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 218 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 219 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 220 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 221 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 222 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 223 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 224 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 225 3'-0" 7'-0" A AL --- YES F1 5 7/8" AL --- NO 1 3/A601 1/A601 5/A601 OVERHEAD 201A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 202A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 203A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 204A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 205A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 206A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 207A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 208A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 209A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 210A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 211A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 212A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 213A 14'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 214A 16'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 215A 16'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 216A 16'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 217A 16'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 218A 16'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 219A 20'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 220A 20'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 221A 20'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 222A 20'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 223A 20'-0" 14'-0" B MTL IT YES --- 0" --- --- NO 2 4/A601 2/A601 6/A601 DOOR ELEVATIONSHM FRAME ELEVATION 1 1/2" = 1'-0"A601 EXT DOOR JAMB DETAIL1 1 1/2" = 1'-0"A601 OH DOOR JAMB DETAIL2 0 03/03/25 ISSUED FOR CONSTRUCTION MGH YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO T/ OPENING SEE SCHED DOOR & FRAME PER SCHED EXTEND BUILDING WRAP UNDER HEADER PRE-ENG MTL DRIP SEALANT 5/8" GYP BD RETURN w/ CORNER BEAD HEADER FRAME - SEE STRUCT SEALANT w/ BACKER (BOTH SIDES) EXTERIOR FINISH TRIM -WHITE SEALANT, TYP 2 2 2 2 NOTE: SEE A101 FOR PARTITION TYPE T/ CONC EL= VARIES DOOR & FRAME PER SCHEDULE THRESHOLD SET IN CONT BED OF MASTIC SWEEP PROVIDE WEATHER STRIPPING @ DOOR BTM 1 1/2" = 1'-0"A601 EXT DOOR HEAD DETAIL3 1 1/2" = 1'-0"A601 DOOR SILL DETAIL5 FIBER EXPANSION JOINT 10 MIL VAPOR RETARDER 10 MIL VAPOR RETARDER R10 RIGID INSUL HEADER FRAME - SEE STRUCT PRE-FIN METAL TRIM AND DRIP MTL FLASHING WRAP AT HEADER WEATHERSTRIP CONT @ PERIMETER OVERHEAD DOOR TRACK SYSTEM 2 2 2 2 2 EXTEND BUILDING WRAP UNDER HEADER EXTERIOR FINISH TRIM -WHITE SEALANT, TYP T/ OPENING SEE SCHED SPRAY FOAM INSULATION CONC FOUNDATION - SEE STRUCT WEATHERSTRIP CONT @ PERIMETER MTL FLASHING WRAP AT FRAME OVERHEAD DOOR & DOOR TRACK BOTTOM ASTRAGAL RETAINER OF EXTRUDED ALUMINUM w/ VINYL ASTRAGAL SLOPED CONC APRON -SEE STRUCT CONC SLAB - SEE STRUCT 1 1/2" = 1'-0"A601 OH DOOR HEAD DETAIL4 NOTE: SEE A101 FOR PARTITION TYPE 1 1/2" = 1'-0"A601 OH DOOR SILL DETAIL6 FIBER EXPANSION JOINT TRAVIS R. BECK, 41400 Signature Printed name Date License Number I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Architect 41400 TRAVIS R. BECK, Architect, NCARB 03/03/2025 AIA, NCARB 191 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 ORONO INDUSTRIAL BOULEVARD OLD CRYSTAL BAY ROADMNDOT RIGHT OF WAY PLAT NO 27-129 BLOCK 1 LOT 1 15.9 0.1 0.1 0.3 1.2 4.6 8.3 3.6 1.2 1.5 5.2 14.5 12.1 3.6 1.3 2.1 7.5 9.1 2.5 1.2 3.0 10.2 15.4 6.4 1.8 1.4 4.3 13.1 13.5 4.4 1.4 1.7 6.2 15.2 10.5 3.0 1.0 1.7 5.5 7.7 2.7 0.1 0.2 0.4 1.0 2.7 3.9 2.3 1.1 1.4 3.6 7.2 6.4 2.7 1.2 1.8 4.7 7.9 5.4 2.1 1.2 2.4 6.0 7.9 4.3 1.6 1.4 3.2 7.3 7.4 3.3 1.3 1.6 4.3 8.3 6.3 2.3 1.0 1.4 3.3 4.2 1.9 0.5 0.1 0.1 0.3 0.6 1.1 1.6 1.8 1.3 1.0 1.3 2.2 3.1 2.8 1.7 1.2 1.5 2.5 3.3 2.5 1.5 1.2 1.8 2.9 3.2 2.2 1.3 1.3 2.1 3.2 3.1 1.9 1.2 1.4 2.4 3.4 2.8 1.5 0.9 1.0 1.5 1.7 1.0 0.4 0.1 0.1 0.2 0.5 1.3 2.3 2.5 1.8 1.1 1.1 1.8 2.8 2.7 1.9 1.2 1.3 2.1 2.9 2.5 1.7 1.2 1.5 2.4 2.8 2.2 1.4 1.2 1.7 2.5 2.6 1.9 1.3 1.2 1.9 2.6 2.4 1.6 1.1 1.0 1.3 1.3 0.9 0.5 0.2 0.1 0.1 0.2 0.7 2.6 6.0 6.5 3.2 1.3 1.4 3.6 6.8 5.9 2.6 1.3 1.8 4.4 7.0 4.9 2.1 1.3 2.4 5.6 6.7 3.6 1.5 1.4 3.2 5.9 5.6 2.8 1.3 1.6 3.8 6.4 4.9 2.1 1.1 1.5 2.9 2.9 1.3 0.5 0.2 0.1 0.1 0.2 0.9 3.8 12.2 13.6 5.0 1.5 1.6 5.6 14.3 11.6 3.7 1.3 2.1 7.7 15.4 9.0 2.6 1.3 3.3 11.2 15.0 5.7 1.7 1.6 5.0 12.9 12.0 4.3 1.4 1.8 6.4 15.1 9.7 2.8 1.1 2.1 6.5 6.6 2.0 0.5 0.1 0.1 0.2 0.9 3.8 8.4 4.2 1.1 0.6 1.3 5.3 12.9 12.0 4.3 1.1 0.7 1.8 6.9 13.9 10.4 3.1 0.7 0.3 0.6 2.3 8.2 13.1 9.3 2.7 0.6 0.2 0.3 0.7 2.7 9.2 13.2 8.1 2.2 0.5 0.2 0.2 0.7 2.9 7.8 5.2 1.3 0.3 0.1 0.2 0.7 2.2 3.8 2.5 0.9 0.5 1.1 3.2 6.4 6.0 2.8 0.9 0.6 1.4 4.0 6.9 5.5 2.2 0.7 0.3 0.5 1.7 4.7 7.0 5.2 2.0 0.6 0.2 0.2 0.6 2.0 5.5 7.4 4.9 1.7 0.5 0.2 0.2 0.6 2.0 4.2 3.1 1.0 0.3 0.1 0.2 0.4 0.9 1.3 1.0 0.6 0.4 0.7 1.5 2.3 2.3 1.4 0.7 0.5 0.9 1.8 2.5 2.2 1.2 0.5 0.3 0.4 1.0 2.0 2.6 2.1 1.1 0.5 0.2 0.2 0.5 1.1 2.2 2.8 2.1 1.0 0.4 0.2 0.2 0.4 0.9 1.5 1.2 0.6 0.2 0.1 0.1 0.3 0.4 0.5 0.5 0.4 0.4 0.5 0.7 1.0 0.9 0.7 0.5 0.4 0.6 0.8 1.0 0.9 0.6 0.4 0.3 0.3 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.3 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.3 0.4 0.5 0.5 0.3 0.2 0.1 0.1 0.3 0.5 0.7 0.6 0.4 0.4 0.6 0.9 1.2 1.2 0.8 0.5 0.4 0.6 1.0 1.2 1.1 0.7 0.4 0.3 0.4 0.6 1.0 1.2 1.0 0.7 0.4 0.2 0.2 0.4 0.7 1.1 1.2 1.0 0.6 0.3 0.2 0.2 0.3 0.5 0.6 0.6 0.4 0.2 0.1 0.2 0.5 1.4 2.1 1.5 0.7 0.5 0.9 2.2 3.7 3.3 1.7 0.7 0.5 1.1 2.5 3.8 3.1 1.5 0.6 0.3 0.5 1.2 2.7 3.7 2.9 1.3 0.5 0.2 0.2 0.5 1.3 2.9 3.7 2.6 1.2 0.4 0.2 0.2 0.5 1.2 2.0 1.6 0.7 0.2 0.1 0.2 0.8 2.9 5.7 3.2 1.0 0.5 1.3 4.4 9.3 8.2 3.2 0.9 0.6 1.5 5.2 9.6 7.5 2.6 0.7 0.3 0.5 1.9 6.0 9.2 6.7 2.3 0.6 0.2 0.2 0.6 2.3 6.7 9.3 6.0 1.9 0.5 0.2 0.2 0.6 2.3 5.4 3.8 1.1 0.3 0.1 0.1 0.5 0.4 0.5 0.2 0.1 0.1 0.2 0.3 0.1 0.1 0.1 0.2 0.8 2.9 5.9 3.3 1.0 0.6 1.3 4.6 9.7 8.5 3.2 0.9 0.6 1.6 5.4 10.1 7.7 2.6 0.7 0.3 0.6 2.0 6.4 9.6 6.9 2.3 0.6 0.2 0.3 0.6 2.4 7.1 9.6 6.2 1.9 0.5 0.2 0.2 0.6 2.4 5.7 3.9 1.1 0.3 0.1 0.1 0.2 0.5 1.4 2.2 1.6 0.7 0.5 0.9 2.3 3.9 3.6 1.8 0.8 0.6 1.1 2.6 4.0 3.3 1.6 0.6 0.3 0.5 1.3 2.8 3.9 3.0 1.4 0.5 0.2 0.2 0.5 1.4 3.0 3.9 2.8 1.2 0.4 0.2 0.2 0.5 1.2 2.1 1.7 0.7 0.2 0.1 0.1 0.2 0.3 0.6 0.7 0.6 0.4 0.4 0.6 1.0 1.3 1.3 0.9 0.5 0.5 0.7 1.1 1.3 1.2 0.8 0.4 0.3 0.4 0.7 1.1 1.3 1.1 0.7 0.4 0.2 0.2 0.4 0.7 1.1 1.3 1.1 0.6 0.3 0.2 0.2 0.3 0.5 0.7 0.6 0.4 0.2 0.1 0.1 0.2 0.3 0.5 0.7 0.6 0.4 0.4 0.6 1.0 1.2 1.1 0.8 0.5 0.5 0.6 1.0 1.2 1.1 0.7 0.4 0.3 0.4 0.6 1.0 1.1 1.0 0.6 0.3 0.2 0.2 0.4 0.6 1.0 1.1 0.9 0.6 0.3 0.2 0.2 0.3 0.4 0.6 0.5 0.3 0.2 0.1 0.1 0.2 0.6 1.4 1.9 1.3 0.6 0.5 1.0 2.2 3.4 3.0 1.5 0.7 0.6 1.1 2.3 3.3 2.6 1.3 0.5 0.3 0.5 1.2 2.4 3.1 2.3 1.1 0.5 0.2 0.3 0.5 1.2 2.4 2.9 2.0 0.9 0.4 0.2 0.2 0.4 1.0 1.5 1.2 0.5 0.2 0.1 0.1 0.2 0.8 3.0 5.2 2.8 0.9 0.6 1.4 4.6 8.7 7.2 2.7 0.9 0.6 1.6 5.0 8.5 6.3 2.3 0.7 0.4 0.6 2.0 5.6 7.9 5.5 1.9 0.6 0.2 0.3 0.7 2.3 5.9 7.6 4.7 1.6 0.5 0.2 0.2 0.7 2.2 4.2 2.8 0.9 0.3 0.1 0.1 0.2 0.8 3.7 7.7 3.4 0.9 0.5 1.4 5.7 12.4 9.9 3.2 0.9 0.6 1.8 7.1 13.5 9.3 2.7 0.7 0.4 0.6 2.5 8.7 12.8 8.3 2.4 0.6 0.3 0.3 0.7 3.0 9.9 13.1 7.4 2.0 0.5 0.2 0.3 0.8 3.3 8.2 4.7 1.2 0.3 0.1 0.1 0.1 0.1 0.2 0.9 3.5 6.8 3.3 0.9 0.6 1.6 5.6 11.4 9.1 3.1 0.9 0.7 1.9 6.8 11.9 8.3 2.5 0.7 0.4 0.7 2.5 8.1 11.5 7.6 2.2 0.6 0.2 0.3 0.8 3.0 9.4 11.9 6.8 1.8 0.5 0.2 0.3 0.8 3.1 7.4 4.2 1.0 0.2 0.1 0.1 0.2 0.6 1.7 2.5 1.6 0.7 0.5 1.1 2.8 4.5 3.9 1.9 0.7 0.6 1.3 3.2 4.8 3.7 1.6 0.6 0.4 0.6 1.5 3.6 4.8 3.5 1.5 0.5 0.2 0.3 0.6 1.8 4.0 5.0 3.3 1.3 0.4 0.2 0.2 0.6 1.6 2.8 2.0 0.7 0.2 0.1 0.1 0.2 0.4 0.6 0.8 0.6 0.4 0.4 0.7 1.1 1.5 1.4 0.9 0.5 0.5 0.8 1.3 1.6 1.3 0.8 0.4 0.3 0.4 0.8 1.3 1.6 1.3 0.8 0.4 0.2 0.2 0.4 0.9 1.5 1.7 1.3 0.7 0.3 0.2 0.2 0.4 0.7 0.9 0.7 0.4 0.2 0.1 0.1 0.2 0.3 0.5 0.6 0.5 0.4 0.4 0.6 0.9 1.1 1.0 0.7 0.5 0.4 0.6 0.9 1.1 0.9 0.6 0.4 0.3 0.4 0.6 0.9 1.0 0.9 0.6 0.3 0.2 0.2 0.4 0.6 0.9 1.0 0.8 0.5 0.3 0.2 0.2 0.3 0.4 0.5 0.4 0.3 0.1 0.1 0.1 0.2 0.6 1.2 1.3 0.8 0.5 0.5 0.9 1.7 2.4 2.0 1.1 0.6 0.5 0.9 1.8 2.4 1.9 1.0 0.5 0.3 0.5 1.0 1.9 2.4 1.7 0.8 0.4 0.2 0.2 0.5 1.0 1.8 2.1 1.5 0.8 0.3 0.2 0.2 0.4 0.8 1.1 0.9 0.4 0.2 0.1 0.1 0.3 1.1 3.0 3.6 1.7 0.6 0.5 1.4 4.0 6.7 5.2 2.1 0.7 0.6 1.5 4.3 6.7 4.7 1.7 0.6 0.3 0.6 1.8 4.9 6.7 4.0 1.3 0.4 0.2 0.3 0.6 2.0 4.8 5.9 3.7 1.3 0.4 0.2 0.2 0.6 1.9 3.2 2.2 0.8 0.2 0.1 0.1 0.3 1.5 5.8 7.6 2.6 0.7 0.6 1.7 6.9 14.4 10.1 2.9 0.8 0.6 2.0 7.8 14.8 9.0 2.4 0.6 0.3 0.6 2.5 9.3 15.1 7.2 1.8 0.5 0.2 0.3 0.7 3.1 10.0 13.2 7.2 1.9 0.5 0.2 0.3 0.8 3.3 8.0 4.5 1.1 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Statistics Description Symbol Avg Max Min Max/Min Avg/Min SITE 1.8 fc 15.9 fc 0.0 fc N/A N/A 10' AFG TYP. W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 A. THE ELECTRICAL EQUIPMENT SHOWN ON THIS SHEET IS DIAGRAMMATICAL IN NATURE AND REPRESENTS APPROXIMATE LOCATIONS IN OR ON SPACE/ROOM/AREA OR EQUIPMENT. CONTRACTOR TO VERIFY THE EXACT LOCATION AND COORDINATE WITH NECESSARY TRADES. GENERAL NOTES: LIGHTING FIXTURE SCHEDULE SYMBOL DESCRIPTION MFR./ CAT. NO.LAMP TYPE INPUT POWER/VOLT REMARKS/ACCESSORIES W1 WET LOCATION -WALL MOUNT LED LITHONIA LIGHTING CAT. NO. WDGE2LEDP240K80CRIVFMVOLTSRMAWSDDBXD LED 15 WATTS (120/277V) Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 44638 DEREK R. SACHS, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR PERMIT ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2025 - ALL RIGHTS RESERVED.3/3/2025 8:52:38 AME001 SITE PLAN - LIGHTING PHOTOMETRICS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/25 CTM CTM DRS DRS 1" = 20'-0"E001 SITE PLAN - LIGHTING PHOTOMETRICS1 0 03/03/25 ISSUED FOR PERMIT CTM 03/03/25 ISSUED FOR CONSTRUCTION FOR CONSTRUCTION ISSUED 192 Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2024 - ALL RIGHTS RESERVED.3/3/2025 11:48:44 AMS001 STRUCTURAL NOTES ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS BUILDING 2 STRUCTURAL NOTES 2025 2 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 193 SS S S SS SS SS SS SS SSSSSS2.B 2.B 2.C2.D2.E2.F 2.F 2.G2.H2.I2.J2.K2.L 2.L 2.3 2.2 2.1 24'-0"24'-0"24'-0"24'-0"24'-0"31'-0"31'-0"31'-0"31'-0" 2.A 2.A 4'-0" 275'-0" 27'-0"4'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"11'-0" TFE= 96'-0" TFE= 96'-0" TFE= 96'-0" DOUBLE 2x10 WOOD STUDS @ 16" OC OR 1 1/2"x9 1/4" LSL @ 16" OC OR 1 3/4"x9 1/4" LVL @ 16" OC DOUBLE 2x10 STUDS @ 16" OC TFE= 95'-4" SWB SWB UNIT 135 UNIT 134 UNIT 133 UNIT 132 UNIT 131 UNIT 129 UNIT 128 UNIT 127 UNIT 126 UNIT 113 UNIT 114 UNIT 115UNIT 116UNIT 117UNIT 118UNIT 119UNIT 120UNIT 121UNIT 122UNIT 123UNIT 124UNIT 125 SWA SWA SWA SWA SWA SWA SWB SWB SWC SLAB ON GRADE SEE PLAN NOTE 3 IN FLOOR HEATING SYSTEM BY OTHERS 10'-0"THICKENED SLAB 8'-0"x2'-0"x1'-0" TYP WHERE SHOWN ON PLAN 13'-0"THICKENED SLAB 8'-0"x2'-0"x1'-0" W/ (3) #4 LONGITUDINAL BOT TYP & #4 @ 12" OC TRANSVERSE TYP WHERE SHOWN ON PLAN SLAB JOINT SPACED EQUALLY, TYP 2x8 WOOD STUD AT 16" OC TYP CLCLS501 1______________ S501 1______________ S501 8______________ TYP @ THICKENED SLAB S501 9______________ TYP @ NON SHEAR WALL DEMISING WALL S501 7______________ S501 10______________ S501 6______________ TYP @ WALL TYP @ OPENING T/ SLAB 99'-4" TYP @ THICKENED SLAB TYP @ NON SHEAR WALL DEMISING WALL T/ SLAB 99'-4" S501 1______________ S501 1______________ UNIT 13040'-0"46'-0"86'-0"2.K1 2.J1 2.I2 2.I1 2.H1 2.G1 2.F1 2.E1 2.D2 2.D1 2.C1 2.B1 S S TFE= 95'-4" T/ SLAB 100'-0" TFE= 96'-4" T/ SLAB 100'-0" TFE= 97'-0" TFE= 96'-4" CONCRETE APRON CONCRETE APRON TYP BETWEEN STOOPS TFE= 95'-4" TFE= 96'-4" TFE= 97'-0" TFE= 96'-0" S501 6______________OR 1 3/4"x9 1/4" LVL @ 16" OC 2x10 @ 16" OC WHERE HEIGHT EXCEEDS 20'-0" (2) 2x10 @ 16" OC(2) 2x10 @ 16" OCOR 1 3/4"x9 1/4" LVL @ 16" OC2x10 @ 16" OC WHERE HEIGHT EXCEEDS 20'-0"S501 2______________ S501 7______________OR 1 3/4"x9 1/4" LVL @ 16" OC 2x10 @ 16" OC WHERE HEIGHT EXCEEDS 20'-0" (2) 2x10 @ 16" OC(2) 2x10 @ 16" OCOR 1 3/4"x9 1/4" LVL @ 16" OC2x10 @ 16" OC WHERE HEIGHT EXCEEDS 20'-0"S501 7______________ TYP @ OPENING TYP @ WALL THICKENED SLABS501 2______________THICKENED SLABS501 7______________ S501 9______________ 275'-0" DOUBLE 2x8 @ 16" OC 2x8 @ 16" OC S501 7______________ SWB DOUBLE 2x8 @ 16" OC 2x8 @ 16" OC S501 8______________ DOUBLE 2x10 STUDS @ 16" OC TFE= 96'-4" 8x8 PSL 8x8 PSLTYP4'-8"8x8 PSL 8x8 PSL 8x8 PSL 8x8 PSL 8x8 PSL 8x8 PSL 8x8 PSL 8x8 PSL CL THICKENED SLAB CL THICKENED SLAB S501 8______________ SIM THICKENED SLAB 9'-0"x2'-0"x1'-0" TYP WHERE SHOWN ON PLAN CL THICKENED SLAB CL THICKENED SLABTHICKENED SLAB CL F5 6" 6" FTG 1'-0" FTG 1'-0"CLTHICKENED SLABCLTHICKENED SLABCL CL S501 5______________8'-4"4"4"4'-0" TFE= 96'-4" TFE= 97'-0" SIM TFE= 95'-4" TFE= 96'-4" TFE= 95'-4" TFE= 95'-4"TFE= 96'-0" TFE= 96'-0" TFE= 97'-0" TFE= 96'-0" SIM SIM F5 TFE= 96'-4" F5 TFE= 97'-0" 1 1 1 1 1 1 1 1 11'-10 1/8"15'-3 5/8" CL 11 3'-9 1/2"8'-4 1/2"8'-2 1/4"8'-3 1/2" TYP 4"TYP 4" 3'-9 1/2"8'-2 1/4" 1 1 1 TFE= 95'-4" S501 5______________ AT SLAB STEP 2 2 1 2 2 2 2 2 2 2 22222222 S501 10______________ AT SLAB STEP 222222222222 S501 5______________ 8'-2 3/4" TYP 4" TYP 4" CONCRETE STOOP TYP @ STOOPS 8'-2"3'-9 1/2"4'-1"4'-1"3'-9 1/2"8'-2"8'-2"4'-11 1/2" TYP @ STOOPS TYP4'-0"TYP4'-0"CLCL 11'-10 1/8"11'-10 1/8" CLCL 11'-10 1/8"11'-10 1/8" SEE 19/S501 2 1 THICKENED SLABTHICKENED SLABTHICKENED SLABTHICKENED SLABTHICKENED SLAB MAN DOOR CONCRETE STOOP WHERE SHOWN WIDTHS VARY -SEE PLAN MAN DOOR CONCRETE STOOPS WHERE SHOWN WIDTHS VARY -SEE PLAN CONCRETE APRON TYP BETWEEN STOOPS 2 2 2 2 1 FASTENING SCHEDULE CONNECTION FLOOR OR ROOF TRUSSES / JOISTS TO WALL TOP PLATE OR GIRDER (TOENAIL) RIM BOARD TO FLOOR OR ROOF TRUSSES / JOISTS (FACE NAIL) RIM BOARD TO FLOOR OR ROOF TRUSSES / JOISTS (TOENAIL) RIM BOARD TO TOP PLATE (TOENAIL) BLOCKING BETWEEN TRUSSES / JOISTS TO TOP PLATE (TOENAIL) SILL BOTTOM PLATE TO RIM BOARD OR BLOCKING THROUGH SHEATHING (FACE NAIL) TOP PLATE TO STUD (END NAIL) STUD TO SILL / BOTTOM PLATE (END NAIL) STUD TO SILL / BOTTOM PLATE (TOENAIL) DOUBLE STUDS (FACE NAIL) DOUBLE TOP PLATES -TYPICAL (FACE NAIL) DOUBLE TOP PLATES -48" LAP (FACE NAIL) BUILT-UP HEADER, TWO PLY (FACE NAIL) HEADER TO TRIMMER STUDS (TOENAIL) FULL HEIGHT STUDS TO HEADER (TOENAIL) BUILT-UP GIRDER OR BEAM, MULTIPLE PLY (FACE NAIL) BUILT-UP STUD POSTS OR BUILT-UP CORNER STUDS FLOOR AND ROOF SHEATHING WALL SHEATHING FASTENING (3) 8d COMMON OR (3) 0.131"x3" NAILS (3) 10d COMMON OR (4) 0.131"x3" NAILS (6) 8d COMMON OR (6) 0.131"x3" NAILS 8d COMMON @ 6" OC OR 0.131"x3" NAILS @ 6" OC (3) 8d COMMON OR (3) 0.131"x3" NAILS 16d COMMON @ 16" OC OR 0.131"x3" NAILS @ 8" OC (2) 16d COMMON OR (3) 0.131"x3" NAILS (2) 16d COMMON OR (3) 0.131"x3" NAILS (4) 8d COMMON OR (4) 0.131"x3" NAILS 16d COMMON @ 24" OC OR 0.131"x3" NAILS @ 8" OC 16d COMMON @ 16" OC OR 0.131"x3" NAILS @ 12" OC (2) ROWS OF (8) 10d COMMON OR (2) ROWS OF (12) 0.131"x3" NAILS 10d COMMON OR 0.131"x3" NAILS @ 12" OC ALONG EACH EDGE (4) 8d COMMON OR (4) 0.131"x3" NAILS (4) 8d COMMON OR (4) 0.131"x3" NAILS, EACH SIDE 10d COMMON OR 0.131"x3" NAILS @ 12" OC ALONG EACH EDGE, EACH FACE, BETWEEN EACH PLY 16d COMMON @ 24" OC OR 0.131"x3" NAILS @ 16" OC BETWEEN EACH PLY REFER TO GENERAL NOTES, PLANS & DETAILS REFER TO GENERAL NOTES, PLANS & DETAILS NOTES: 1. PROVIDE THE NAILING NOTED IN THIS SCHEDULE UNLESS MORE STRINGENT NAILING IS NOTED ON THE PLANS OR DETAILS. 2. COMMON NAIL SIZES ARE AS FOLLOWS: -8d = 0.131"⌀x2 1/2" -10d = 0.148"⌀x3" -16d = 0.162"⌀x3 1/2" FOUNDATION PLAN NOTES: 1.FOR STRUCTURAL NOTES SEE S001. 2.TOP OF FOOTING ELEVATION (TFE) = 96'-0" TYP AT EXTERIOR UNO. 3.PROVIDE 5" SLAB ON GRADE REINF W/ #4@16" EW TYP UNO. TOP OF SLAB ELEVATION (TSE) = 100'-0" UNO. SEE CIVIL FOR USGS DATUM ELEVATION. 4.FOR TYPICAL BAR BENDING IN REINFORCED CONCRETE SEE 10/S501. 5.FOR TYPICAL WALL AND CORNER REINFORCING SEE 6.S- -S DENOTES STEPPED FOOTING, SEE TYPICAL STEPPED FOOTING DETAIL 12/S501. 7.SEE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR SLAB SLOPES, DRAINS, CURBS, HOUSEKEEPING PADS, JUNCTION BOXES, CONDUIT AND ALL COORDINATING ITEMS TO BE PLACED IN CONCRETE. 8.FOR UTILITIES RUNNING PERPENDICULAR TO FOUNDATIONS SEE 9.SHEAR WALLS INDICATED ON PLAN BY: 10.AT TYPICAL FLOOR DRAIN SEE 16/S501 AND AT TYPICAL TRENCH DRAIN 17/S501 SEE 12/S501 SEE 11/S501 SEE 13/S501 SEE 15/S501SEE 14/S501 & SEE 17/S501. SEE 16/S501 SHEAR WALL HOLDOWN SCHEDULE ANCHOR BOLT MIN ANCHOR BOLT EMBED TO CONC 3 1/2"HDU8-SDS2.5 SIMPSON HOLDOWNMARK 7/8" DIA ROD POST WIDTH SIMPSON OPTION SSTB28 1. INSTALL HOLDOWN PER MANUFACTURER SPECIFICATIONS. 2. ALL ANCHOR BOLTS TO BE ASTM F1554 GR. 36. (IF MIN. EMBED LISTED IS "-" USE SIMPSON OPTION) 3. WHEN ANCHORING TO CONCRETE, PROVIDE (2) NUTS & (2) WASHERS REF 4. PROVIDE OVERSIZED WASHERS AS REQUIRED 5. CENTER ALL HOLDOWNS & ANCHOR IN STEM WALLS 6. AT DOUBLE AND PSL PROVIDE ADD'L #4 VERT BAR IN FOUNDATION WALL AT EA HOLDOWN ((4) TOTAL PER PSF) REF -1 2 DTT2Z ---1/2" DIAx5" TITEN HD 20/S501 1 7/S501 1. PROVIDE (2) STUDS AT EACH END OF SHEAR WALL. END STUDS SHALL RECIEVE EDGE NAILING. 2. ALL BLOCKING IN WALLS SHALL MEET OR EXCEED STUD GRADE. 3. PANEL JOINTS SHALL OCCUR AT THE CENTERLINE OF STUDS AND BLOCKING. 4. VERIFY WITH ARCHITECT IF ADDITIONAL LAYERS OF GYP BOARD ARE REQUIRED FOR FINISHES. 5. CONTRACTOR'S OPTION - PROVIDE AT TOP AND SILL PLATE BY ALTERNATE MANUFACTURER THAT MEET OR EXCEED CAPACITY OF CLIPS INDICATED IN SCHEDULE. 6. SEE SHEAR WALL BASE CONNECTION SCHEDULE FOR ANCHORAGE TO SUPPORT MATERIAL. 7. SEE HOLDOWN SCHEDULE FOR HOLDOWN INFORMATION. 8. PROVIDE NAILING AT CLIP ANGLES PER MANUFACTURER'S RECOMMENDATIONS. 9. TOP AND SILL PLATE NAILING SHALL BE STAGGERED WHERE NAILS ARE SPACED AT 2" OC. 10. ALL FASTENERS IN CONTACT WITH TREATED WOODS SHALL BE GALVANIZED. 11. ALL WALLBOARD NAILS INDICATED IN SCHEDULE SHALL BE 0.120" DIA AND HAVE MINIMUM 3/8" HEAD. 12. STAPLES SHALL BE GALVANIZED, 7/16" MINIMUM CROWN WIDTH AND BE INSTALLED PARALLEL TO FRAMING MEMBERS. 13. 6d NAILS MAY BE SUBSTITUTED WITH NO. 6 1 7/8" TYPE S OR W DRYWALL SCREWS. 14. PROVIDE EXTERIOR GYP BOARD WHERE SHEAR WALL IS AN EXTERIOR WALL. 15. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING TO MATCH THE WALL STUD SIZE. 16. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING 2" NOMINAL OR WIDER. 17. BLOCK ALL PANEL EDGES WITH WOOD BLOCKING 3" NOMINAL OR WIDER. STAGGER NAILS. 18. PROVIDE 1 1/2" MINIMUM PENETRATION INTO STUD AT 10d NAIL AND 1 3/8" MINIMUM AT 8d NAIL. 19. STUDS AT ADJOINING PANEL EDGES SHALL BE 3" NOMINAL WIDTH OR GREATER. 20. USED EITHER SPECIFIED CLIP ANGLE OR NAILING AS SPECIFIED BY REFERRING DETAIL. 21. FOR CLIP ANGLE CONNECTION SHEAR WALL NOTES: SHEAR WALL SCHEDULE WALL PANEL FASTENING TOP AND SILL PLATE FASTENING -SEE NOTE 20 EDGE SPACING INTERMEDIATE SUPPORT SPACING MINIMUM FASTENER SIZE 12"8d COMMON OR GALVANIZED BOX NAIL4" 12"6"8d COMMON OR GALVANIZED BOX NAIL SEE NOTE 16, 18 16, 18 SIMPSON OR USP CLIP ANGLE LS90 OR MP9 @ 16" OC COMMON OR FRAMING NAILS 16d @ 2" OR 3" x 0.131 DIAx3" @ 2" 16d @ 3" OR 3" x 0.131 DIAx3"@ 2" ANCHOR FASTENER TO FOUNDATION WALL 5/8" DIA BOLTS @ 24" OC 5/8" DIA BOLTS @ 32" OC WALL PANEL CONSTRUCTION (1) LAYER 15/32" OSB OR PLYWOOD ONE SIDE OF WALL -BLOCKED (1) LAYER 15/32" OSB OR PLYWOOD ONE SIDE OF WALL -BLOCKED WALL TYPE SWA SWB LS90 OR MP9 @ 12" OC SEE 4/S502 PAD FOOTINGS SCHEDULE MARK SIZE REINFORCING COMMENTS F5 5'-0"x5'-0"x1'-0"(6) #6 EW TOP & BOT Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:48:45 AMS101 FOUNDATION PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/8" = 1'-0"S101 FOUNDATION PLAN1 TRUE NORTH BUILDING 2 PLAN 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 194 2.B 2.B 2.C2.D2.E2.F 2.F 2.G2.H2.I2.J2.K2.L 2.L 2.3 2.2 2.1 2.A 2.A 40'-0"46'-0"275'-0" 24'-0"24'-0"24'-0"24'-0"24'-0"31'-0"31'-0"31'-0"31'-0"27'-0"4'-0" RIDGE OVERHANG3'-0"OVERHANG3'-0"OVERHANG 2'-0" OVERHANG 2'-0"OVERHANG2'-0"S502 2______________4.5:12 SLOPE4:12 SLOPES502 1______________ S502 1______________ H1H1 H4H4H4H4H4H3 S502 2______________ OVERHANG 2'-0"2x OUTRIGGERS @ 24" OC2x OUTRIGGERS @ 24" OCOVERHANG2'-0"2.K1 2.J1 2.I2 2.I1 2.H1 2.G1 2.F1 2.E1 2.D2 2.D1 2.C1 2.B1 86'-0"11'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"4'-0" OVERHANG 2'-0" 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP S502 3______________ H2 LOCS H3 H3 H3 H3H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW TYP @ OPENING H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOW H2 LOWH1 H1 H1 H1 H1 H1 H1 H1 H1 H1 H1 (22.0 K)(22.0 K)(37.0 K)(37.0 K)(42.0 K)(45.0 K)(25.0 K)(42.0 K)(45.0 K)(20.0 K)2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP 2x ENGINEERED WOOD TRUSSES @ 24" OC, TYP S502 9______________ 3/4" ROOF SHEATHING SEE NOTE 9.2.3 ON SHEET S001 3/4" ROOF SHEATHING SEE NOTE 9.2.3 ON SHEET S001 S502 3______________ S502 5______________ S502 5______________ S502 2______________ S502 5______________ S502 8______________ TYP INTERIOR DEMISING WALL S502 5______________ S502 5______________ TYP @ WALL S502 3______________ S502 3______________ TYP ALONG RIDGE H5H53/4" TO FIRST TRUSS 3/4" TO FIRST TRUSS 3/4" TO FIRST TRUSS 3/4" TO FIRST TRUSS TYP @ OPENING TYP @ WALL SEE ARCHSEE ARCHTO TRUSS 2 7/8" TO TRUSS 2 7/8" 275'-0" TO TRUSS 2 7/8" CLCLCL H2 LOW FAUX DORMER SEE ARCH FAUX DORMER SEE ARCH FAUX DORMER SEE ARCH FAUX DORMER SEE ARCH FAUX DORMER SEE ARCH FAUX DORMER SEE ARCH HEADER SCHEDULE MARK H1 H2 H3 H4 HEADER (3) 1 3/4"x18" LVL (4) 1 3/4"x18" LVL KING STUDS KING STUDS COMMENTS (6) 2x8 (4) 2x8 H5 (3) 2x8 (2) 2x10 (1) 2x10 (3) 2x8 (3) 1 3/4"x18" LVL (2) 2x8 (1) 2x8 (5) 2x8 (3) 2x8 (3) 1 3/4"x7 1/4" LVL (2) 1 3/4"x7 1/4" LVL AT TRIMMER PROVIDE CS20 PER MANUFACTURER SPEC CENTERED BETWEEN HEADER AND TRIMMER STUD WHERE NO ROOM FOR TRIMMER FASTEN TO JAMB STUDS OF ADJACENT JAMB WITH CONCEALED SIMPSON HANGER. ADD ADD'N JAMB WHERE THIS OCCURS ROOF FRAMING PLAN NOTES: 1. FOR STRUCTURAL NOTES SEE S001. 2. TRUSS BEARING EL/ TOP OF WALL EL=116'-0" 3. FOR TRUSS PROFILES SEE ARCHITECTURAL DRAWINGS. 4. AXIAL LOADS FOR ENGINEERED TRUSS DESIGN ON PLAN (X.X K) ARE ULTIMATE BASED ON 2018 IBC/ASCE 7-16. 5. SHADED REGION INDICATED HAND/OVER FRAMED DORMER ABOVE TYPICAL ROOF TRUSSES & SHEATHING TO PRODUCE DESIRED ROOF PROFILE. Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:48:46 AMS121 ROOF FRAMING PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR MDM 1/8" = 1'-0"S121 ROOF FRAMING PLAN1 TRUE NORTH BUILDING 2 PLAN 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 195 2.B 2.B 2.C2.D2.E2.F 2.F 2.G2.H2.I2.J2.K2.L 2.L 2.3 2.2 2.1 2.A 2.A2.K1 2.J1 2.I2 2.I1 2.H1 2.G1 2.F1 2.E1 2.D2 2.D1 2.C1 2.B1 40'-0"46'-0"275'-0" 24'-0"24'-0"24'-0"24'-0"24'-0"31'-0"31'-0"31'-0"31'-0"27'-0"4'-0"86'-0"11'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"4'-0"12'-0"275'-0" KEY PLAN 9 PSF 52 PSF 30 PSF Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:48:46 AMS122 ROOF SNOW LOAD PLAN ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/8" = 1'-0"S122 SNOW LOAD DIAGRAM1 NOTE: 1.BALANCED SNOW LOAD IS 30 PSF. 2.UNBALANCED TO BE DESIGNED FOR EACH SIDE OF RIDGE. ONE SIDED CONDITION SHOWN FOR CLARITY. TRUE NORTH BUILDING 2 PLAN RIDGE 2025 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 196 STANDARD HOOKS AND BENDS TIES AND STIRRUPS LAP SPLICEOFFSET SPLICE CLASS "B" LAP BAR SIZE x #3 #4 #5 #6 #7 #8 #9 22" 30" 36" 44" 66" 74" 84" NOTES FOR STANDARD HOOK AND BENDS FOR TIES AND STIRRUPS 1) 2) 3) d = BAR DIAMETER D= 6 d FOR #3 THRU #8 D= 8 d FOR #9 THRU #11 D= 4 d FOR #3 THRU #5 D D D D D D 90 DIA 2 1/2" MIN 45 DIA 180 DIA 135 DIA90 DIA 6 d #3 THRU #5 12 d #6 THRU #812d CLASS "B" LAP WIRE TIES 4d WIRE TIES "X"3" MIN."X"3" MIN6d1 6 ddLAP SEE LAP SEECONCRETE FDN WALL AND/OR FOOTINGS CORNER BARS TO MATCH SIZE & QUANTITY OF TYP FTG REINF 1 2 SEE PLAN FOR FOOTING REINF TO LAP & MATCH FOOTING REINF 2S D S SDDTFE SEE PLAN TFE SEE PLAN LAP TYP CLASS B GRADE OR SLAB PIPE TRENCH BACKFILL BOTTOM OF FOOTING SHALL NOT BE HIGHER THAN THIS LINE. LOCATE PIPE FARTHER FROM WALL FOOTING OR STEP FOOTINGS AS REQUIRED BENCH 1'-0"1 2 2'-0" MIN NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING, SHEATHING OR OTHERWISE MAINTAINING THE SIDES OF THE EXCAVATION FROM CAVE-IN UNTIL ALL BACKFILL IS COMPLETED FOUNDATION WALL CONTINUE FOOTING REINF ABOVE OPNG WALL FOOTING 1 1 1/2 PIPE NOTES: 1. 2.PIPES DEEPER THAN 8'-0" BELOW FOOTING DO NOT REQUIRE LEAN CONCRETE FILL, PROVIDE TRENCH COMPACTED PER SPEC REQUIREMENTS. DETAIL APPLIES TO PIPES LESS THAN 3'-0" BELOW FOOTING. FOR PIPES MORE THAN 3'-0" BELOW FOOTING BUT LESS THAN 8'-0" PROVIDE LEAN CONCRETE FILL BELOW FOOTING DOWN TO PIPE INVERT ELEVATION. 2" MIN COMPRESSIBLE MATERIAL 6" 1'-0" 6"MIN2"MIN2"T / 4 MINCONSTRUCTION JOINT CONTROL JOINT 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC (GREASE ONE END) CENTERED ON JOINT, FEILD VERIFY SAW CUT JOINT 1/8"x1/4 DEPTH OF SLAB, MAXIMUM 14'-0" OC EACH WAY TSLAB ON GRADE 10 MIL VAPOR BARRIER COMPACTED GRANULAR FILL SLAB ON GRADE COMPACTED GRANULAR FILL NOTE: 1. FOR UNDER SLAB PREP SEE GEOTECHNICAL EVALUATION REPORT 2. CONTRACTOR TO COORDINATE PLACEMENT OF CONSTRUCTION JOINTS AS REQ'D 3. CONTRACTOR TO COORDINATE LOCATION OF VAPOR BARRIER. 4. PROVIDE 6" MIN VAPOR BARRIER LAP PER MANUFACTURER'S DIRECTION 10 MIL VAPOR BARRIER T/ SLAB ??? SEE MECH SLOPE WHERE OCCURS SLOPE SEE MECH SLAB FLOOR DRAIN 7" W/ MNFR VERIFY 7"4"5"1'-0" SLOPE SEE MECH S L O P E S E E M E C H T/ SLAB ??? TRENCH DRAIN BY MANUFACTURER SLAB (3) #3 CONT #3 BENT BARS @ 12" OC T/O SLAB EXTEND BARS 1'-0" INTO FUTURE SLAB SLAB ON GRADE FUTURE SLAB ON GRADE BY TENANT SHOWN DASHED MIN 1'-0" 8"8"8"8"T/ FOOTING SEE PLAN TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH VENEER SEE ARCH AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ T/ SLAB 100'-0" 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ 1'-0"(3) #4 CONT T/ CURB FIBER EXPANSION JOINT SEE PLANSLABPLYWOOD SHEATHING CLR TYP 3"CLR3"2'-0" TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH (3) #5 CONT T/ SLAB SEE PLAN T/ FOOTING SEE PLAN 10" CONCRETE FDN WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FOOTING & #4 @ 12" OC HORIZSEE PLANSLABFIBER EXPANSION JOINT EACH SIDE AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ 3'-0"1'-0"CLR3"1'-1"10"1'-1" TYP CLR 3" 2'-0" 8"8"8" T/ SLAB SEE PLAN T/ FOOTING SEE PLAN TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ1'-0"CLR3"CLR 3" (3) #4 CONTSEE PLANSLABFIBER EXPANSION JOINT EACH SIDE WALL SHEATHING SEE ARCH & SHEAR WALL SCHEDULE TYP AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ SEE PLAN SEE PLANSLAB7"WALL SHEATHING SEE ARCH OMIT AT SIM STUD WALL SEE PLAN FOR SIZE & SPACING OMIT AT SIM TREATED 2x SILL PLATE W/ 1/2" DIA SCREW BOLTS & WASHER (3" EMBED) @ 32" OC OMIT AT SIM T/ SLAB SEE PLAN SEE PLANSLABWALL SHEATHING SEE ARCH STUD WALL SEE PLAN FOR SIZE & SPACING CONT SILL PLATE W/ 1/2" DIA SCREW BOLT (3" EMBED) @ 32" OC T/ SLAB SEE PLAN CLR1 1/2"CLR 2" MIN 4 1/2" POST SEE SCHEDULE T/O FDN WALL TREATED BOT PL HOLDOWN ANCHOR SEE SCHEDULE TYP WALL REINFORCEMENT CONC FDN WALL SEE PLAN & SECTIONS EMBED SEE SCHEDULEHOLDOWN SEE SCHEDULE & PLAN T/ FOOTING SEE PLAN WALL BEYOND @ EXTERIOR DOORS TYP T/ SLAB 100'-0" 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC CENTERED ON JOINT SAND OR GRAVEL PAVEMENT BY OTHERS 8" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12 OC HORIZ AT SIM: 10" CONC FOUNDATION WALL 2'-0"1'-0"CLR3"CLR 3"(3) #4 CONT SEE PLANSLAB8" AT SIM: 10" 8" 8" TYP #4 BENT DOWEL @ 12" OC SLOPED 1'-0"(2) #4xCONT 5" CONC SLAB W/ #4 @ 16" OC EA WAY 8" 4'-0"4" 7"10"7"8"T/ FOOTING SEE PLAN TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH VENEER SEE ARCH AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ T/ SLAB 100'-0" 10" CONCRETE FOUNDATION WALL W/ #4 @ 32" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ 1'-0"(3) #4 CONT AT SIM: (4) #4 CONT T/ CURB FIBER EXPANSION JOINT SEE PLANSLABPLYWOOD SHEATHING CLR TYP 3"CLR3"AT SIM: 3'-0" 2'-0" CONT SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH & SHEAR WALL SCHEDULE (3) #4 CONT T/ SLAB SEE PLAN T/ FOOTING SEE PLAN 8" CONCRETE FDN WALL W/ #4 @ 32"OC VERT W/ STD HOOK INTO FOOTING PROVIDE #4 @ 12" OC HORIZ FIBER EXPANSION JOINT EACH SIDE T/ SLAB SEE PLAN 2'-0" 8"8"8"1'-0"CLR3"CLR 3" TYP AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ T/ FOOTING SEE PLAN T/ SLAB 100'-0" 8" CONCRETE FOUNDATION WALL W/ #4 @ 16" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ (3) #4 CONT #4x2'-6" @ 32" OC DRILLED & EPOXY INTO CONC WALL W/ 4" EMBED 3'-0" 5" CONC APRON SLAB W/ #4 @ 16" OC EA WAY PAVEMENT BY OTHERS T/ CURB SEE PLANSLABPLYWOOD SHEATHING AT TOP OF WALL PROVIDE (2) #4 CONT HORIZ TREATED 2x SILL PLATE W/ 1/2" DIA ANCHOR BOLTS & WASHER (8" EMBED) @ 32" OC TYP UNO AT SHEAR WALLS SEE SHEAR WALL SCHEDULE STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH FIBER EXPANSION JOINT 8"8"8"1'-0"CLR TYP 3"CLR3"2'-0" S LO P E D (2) #4xCONT 6 1/2"8" T/ FOOTING SEE PLAN WALL BEYOND @ EXTERIOR DOORS, TYP T/ SLAB 100'-0" 2'-0"1'-0"CLR3"CLR 3" (3) #4 CONT SEE PLANSLAB8"8"8" TYP #4 BENT DOWEL @ 12" OC 8" CONCRETE FOUNDATION WALL W/ #4 @ 16" OC VERT W/ STD HOOK INTO FTG PROVIDE #4 @ 12" OC HORIZ #4x2'-6" @ 32" OC 3'-0" 5" CONC APRON SLAB W/ #4 @ 16" OC EA WAY PAVEMENT BY OTHERS S EE C IV IL (2) #4xCONT 6 1/2"8" (2) #4xCONT 1/2" DIAx2'-0" SMOOTH DOWELS @ 16" OC CENTERED ON JOINT Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:48:47 AMS501 FOUNDATION DETAILS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/2" = 1'-0"S501 TYP BAR BENDING DETAIL11 1 1/2" = 1'-0"S501 TYP CORNER REINF DETAIL12 1/2" = 1'-0"S501 TYP STEPPED FOOTING DETAIL13 1/2" = 1'-0"S501 TYP FTG PARALLEL TO PIPE14 3/4" = 1'-0"S501 TYP FTG PERPENDICULAR TO PIPE15 1" = 1'-0"S501 TYP INTERIOR SLAB JOINTS19 1/2" = 1'-0"S501 TYP FLOOR DRAIN DETAIL16 3/4" = 1'-0"S501 TYP TRENCH DRAIN DETAIL17 3/4" = 1'-0"S501 TYP SLAB INFILL DETAIL18 1/2" = 1'-0"S501 FOUNDATION DETAIL1 1/2" = 1'-0"S501 FOUNDATION DETAIL6 1/2" = 1'-0"S501 FOUNDATION DETAIL7 1/2" = 1'-0"S501 FOUNDATION DETAIL8 1/2" = 1'-0"S501 FOUNDATION DETAIL9 3/4" = 1'-0"S501 WALL REINFORCING AT HOLDOWN LOCATION DETAIL20 2025 1/2" = 1'-0"S501 EXIT FOUNDATION DETAIL5 1/2" = 1'-0"S501 FOUNDATION DETAIL2 1/2" = 1'-0"S501 FOUNDATION DETAIL10 1/2" = 1'-0"S501 FOUNDATION DETAIL3 1/2" = 1'-0"S501 FOUNDATION DETAIL4 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 197 STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH SIMPSON H2A HURRICANE TIE BOTH ENDS EACH TRUSS DOUBLE TOP PL VENEER SEE ARCH TRUSS BEARING SEE PLAN T/O OPENING SEE ARCH HEADER SEE PLAN PLYWOOD SHEATHING ROOF SHEATHING SEE PLAN PROVIDE BLOCKING FOR SHEATHING ATTACHMENT PER & PREENGINEERED ROOF TRUSS BY OTHERS SEE PLAN 12 6/S502 7/S502 PLAN SEE WALL SHEATHING SEE ARCH 2x BLOCKING BY TRUSS SUPPLIER ROOF SHEATHING SEE PLAN ROOF TRUSS SEE PLAN 2x4 OUTRIGGER @ 24" OC, MAX GABLE STARTER TRUSS VENEER SEE ARCH PLAN SEE SISTER 2X6 TO GABLE VERT WEB @ 48" OC MAX W/ 8d NAILS @ 8" OC L50 EA SIDE OF BRACE SIMPSON H2A HURRICANE TIE TYP 2x6 BRACE @ 4'-0" OC 2x6 BLOCKING AT BRACE LOCS TRUSS BEARING SEE PLAN 1 1 (5) 1/4"x3 1/8" GRK RSS FASTEN BLOCKING TO SHEATHING @ 3" OC SIMPSON A34 TYP DOUBLE TOP PL STUD WALL SEE PLAN FOR SIZE & SPACING ANGLE CONNECTOR SEE SHEAR WALL SCHEDULE FOR SPACING FOR BRACE BLOCKING AND FASTENING SEE ROOF SHEATHING SEE PLAN ROOF TRUSS DOUBLE TOP PL WALL SHEATHING SEE ARCH 2x6 BRACE @ 8'-0" OC TRUSS BEARING SEE PLAN 1 1 PLYWOOD SHEATHING NOTE: SHEATHING MUST CONTINUE TO ROOF SHEATHING FOR SHEAR WALL. 3/S502 S502 7______________ NAILING SEE FASTENING TABLE ROOF TRUSSES SEE PLAN TRUSS BEARING SEE PLAN PLYWOOD SHEATHING NAILING TYP SEE FASTENING TABLE ATTACH BLOCKING TO TRUSS TOP CHORD SEE FASTENING TABLE 2x BLOCKING (4) SIDES & WEB FILLER ATTACH PER FASTENING TABLE SEE PLAN 12 PLAN SEE TRUSS BEARING SEE PLAN ROOF SHEATHING 2x FLAT BLOCKING 2x BLOCKING BETWEEN TRUSS WEBS NAILING TYP SEE FASTENING TABLE PLYWOOD SHEATHING TRUSS BEARING SEE PLAN STUD WALL SEE PLAN FOR SIZE & SPACING WALL SHEATHING SEE ARCH DOUBLE TOP PL VENEER SEE ARCH PLYWOOD SHEATHING SIMPSON H2A HURRICANE TIE BOTH ENDS EACH TRUSS ROOF SHEATHING SEE PLAN ROOF TRUSS SEE PLAN PREENGINEERED ROOF TRUSS BY OTHERS SEE PLAN 12 PROVIDE BLOCKING FOR SHEATHING ATTACHMENT PER &6/S502 7/S502 PLAN SEE STUD WALL SEE PLAN FOR SIZE & SPACING SEE PLAN 12 BEARING SEE PLAN TRUSS PLYWOOD SHEATHING ROOF SHEATHING SEE PLAN WALL SHEATHING SEE ARCH ROOF TRUSS ANGLE CONNECTOR SEE SHEAR WALL SCHEDULE FOR SPACING TRUSS SUPPLIER TO SUPPLY TRUSS BLOCKING FOR 150 PLF (ULTIMATE) WALL SHEATHING SEE ARCH 2x BLOCKING BY TRUSS SUPPLIER ROOF SHEATHING SEE PLAN ROOF TRUSS SEE PLAN 2x4 OUTRIGGER @ 24" OC, MAX GABLE STARTER TRUSS VENEER SEE ARCH PLAN SEE SISTER 2x6 TO GABLE VERT WEB @ 48" OC MAX W/ 8d NAILS @ 8" OC SIMPSON H2A HURRICANE TIE TYP TRUSS BEARING SEE PLAN DOUBLE TOP PL ANGLE CONNECTOR SEE SHEAR WALL SCHEDULE FOR SPACING TRUSS BEARING SEE PLAN ROOF SHEATHING SEE PLAN 2x BLOCKING @ 2'-0" OC CONTINUE MIN (1) TRUSS SPACE EA SIDE OF WALL WALL SHEATHING SEE ARCH STUD WALL SEE PLAN FOR SIZE & SPACING SIMPSON A35 DOUBLE TOP PL ROOF TRUSS Signature Printed name Date License Number Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. 41957 MARK D. MIELKE, P.E. 763.559.9100 www.vaaeng.com2300 Berkshire Lane N, Suite 200 Plymouth, MN 55441 VAA, LLC DRAWING NO:PROJECT NO: DRAWING TITLE: CLIENT: PROJECT: SCALE: FOR CONSTRUCTION ISSUED Date Plotted:AS NOTED DATE: DESIGNED: DRAWN: ISSUE/REVISIONDATENO. BY CHECKED: APPROVED: NOTICE: THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, DETAILS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE EXCLUSIVE PROPERTY OF VAA, LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC. COPYRIGHT VAA, LLC 2023 - ALL RIGHTS RESERVED.3/3/2025 11:48:48 AMS502 FRAMING DETAILS ORONO GARAGE CONDOS 430 OLD CRYSTAL BAY RD ORONO, MN 55356 ROBERT L. PAGE 5840 CLUB VALLEY RD SHOREWOOD, MN 55331 240776 03/03/2025 JML KAZ SJF/AMR BMS 1/2" = 1'-0"S502 ROOF FRAMING DETAIL1 1/2" = 1'-0"S502 ROOF FRAMING DETAIL3 1/2" = 1'-0"S502 ROOF FRAMING DETAIL5 1/2" = 1'-0"S502 ROOF FRAMING DETAIL6 1/2" = 1'-0"S502 ROOF FRAMING DETAIL7 1/2" = 1'-0"S502 ROOF FRAMING DETAIL2 1/2" = 1'-0"S502 ROOF FRAMING DETAIL9 2025 1/2" = 1'-0"S502 ROOF FRAMING DETAIL4 1/2" = 1'-0"S502 ROOF FRAMING DETAIL8 0 03/03/25 ISSUED FOR CONSTRUCTION SJF 03/03/2025 198 199 200 Orono Garage Storage Trip Generation Review Page | 1 Date: February 28th, 2025 To: Rob Page, Dave Ramsey From: Katie Schmidt, PE (MN PE License #47147) Re: Trip Generation Memo – Orono Garage Storage, Orono, MN Per your request, SSTS LLC has conducted a trip generation estimate for the proposed Orono Garage Condo Development (Proposed Project) in the City of Orono, Hennepin County, MN. The Proposed Project is located north of Highway 12 and on the east side of Old Crystal Bay Rd. Orono Industrial Blvd is proposed to be constructed with the site for access. 85 garage condo units are planned that measure approximately 45’x 30’. Garage condos are larger storage units where customers typically store boats, vehicles, trailers and recreational vehicles. The adjacent Figure 1 shows the location. Figure 2, Site Plan, depicts the site layout and access location. Trip Generation Traffic data for the unique Garage Condo land use is not specifically included in the Institute of Transportation Engineer’s Trip Generation Manual1, which is a standard industry reference used by public agencies to estimate trips generated by specific land uses. Investigation shows the “Mini- Warehouse” use (ITE Land Use Code 151) is a similar use with units that are generally smaller than the proposed Garage Condos but can accommodate a vehicle. For comparison purposes the volume of vehicle trips generated by the Proposed Project considering “Mini-Warehouse” designation has been estimated for the AM and PM peak hour of operations and on a daily basis per ITE’s Trip Generation Manual. Table 1 summarizes the trip generation estimates. Table 1 - Trip Generation for Mini-Warehouse The Proposed Project is estimated to generate the following: •2 new trips (1 entering and 1 exiting) during the morning peak hour of operations, •2 new trips (1 entering and 1exiting) during the evening peak hour of operations, and •15 daily trips. Site generated traffic is anticipated to be extremely low and will have a negligible impact on existing traffic operations. 1 Trip Generation Manual, Institute of Transportation Engineers (ITE), 11th Edition Trips Generated: Enter Exit Enter Exit Mini-W arehouse 151 85 units 1 1 1 1 15 1 1 1 1 2Totals 2 15 PM Peak Weekday ADT Land Use ITE Land Use Code Size AM Peak Figure 1. Project Location 201 Orono Garage Storage Trip Generation Review Page | 2 For comparison purposes, the trip generation potential of a 128,000 SF light industrial building was investigated as this would be the size and type of use that would be likely for this parcel. Table 2 summarizes the trip generation estimates for a light industrial building per ITE’s Trip Generation Manual. Table 2 - Trip Generation for Light Industrial A general light industrial use for the site is estimated to generate over 100 peak hour trips and 623 daily trips. In summary, the number of vehicle trips anticipated to be generated by the Proposed Project is extremely low, approximately one new vehicle trip every 30 minutes during the peak hour, and impacts to existing traffic operations will be minimal. If the site were to be developed into a light industrial building the trip generation potential increases to over 100 trips for the peak hours and 623 daily trips. Please contact Katie Schmidt at katie@s2traffic.com with any questions. Figure 2. Site Plan Trips Generated: Enter Exit Enter Exit General Light Industrial 110 128,000 s.f.101 15 18 84 623 101 15 18 84 102Totals 116 623 PM Peak Weekday ADT Land Use ITE Land Use Code Size AM Peak 202 MNDOT RIGHT OF WAY PLAT NO 27-129 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 ORONO INDUSTRIAL BOULEVARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT EX5EX1 EX1ORONO GARAGE CONDOSSITE PLANFIRE CIRCULATION EXHIBIT03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20'P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:39:26 PM, 1:1, LEH203 MNDOT RIGHT OF WAY PLAT NO 27-129 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 ORONO INDUSTRIAL BOULEVARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT EX5EX2 EX2ORONO GARAGE CONDOSSITE PLANFIRE CIRCULATION EXHIBITPARTIALLY OBSTRUCTED03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20'P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:39:36 PM, 1:1, LEH204 MNDOT RIGHT OF WAY PLAT NO 27-129 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 ORONO INDUSTRIAL BOULEVARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT EX5EX3 EX3ORONO GARAGE CONDOSSITE PLANCAMPER CIRCULATION EXHIBIT03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20'P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:39:52 PM, 1:1, LEH205 MNDOT RIGHT OF WAY PLAT NO 27-129 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 ORONO INDUSTRIAL BOULEVARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT EX5EX4 EX4ORONO GARAGE CONDOSSITE PLANBOAT TRAILER CIRCULATION EXHIBIT03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20'P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:42:49 PM, 1:1, LEH206 MNDOT RIGHT OF WAY PLAT NO 27-129 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 ORONO INDUSTRIAL BOULEVARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT EX5EX5 EX5ORONO GARAGE CONDOSSITE PLANFIRE & PARKED CAR CIRCULATION EXHIBIT03/03/2025 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 10 20 40 20'P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:43:03 PM, 1:1, LEH207 OLD CRYSTAL BAY ROAD MNDOT RIGHT OF WAY PLAT NO 27-129BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5TEMPUS ORONO LLCPID: 3311823130020METRO STORAGEORONO LLCPID: 3311823130019WJM PROPERTIES LLCPID: 3311823130015ORONO PRESERVERESIDENTIALDEVELOPMENTORONO INDUSTRIAL BOULEVARD12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273747576777879808182838485P:\24015_Orono Car Condo's\CAD\Exhibits\24015_Planning Commission Exhibits.dwg, 3/3/2025 1:11:34 PM, 1:30, LEH **For illustration purposesand each owner willmanage the parking fortheir space**For illustration purposes and each owner will manage the parking for their spaceINTERNAL PARKING ILLUSTRATION 56208 Picture and Examples of other Garage Condo Projects 03/17/2025 Planning Commission Review 209 Eagan 210 Medina 211 Corcoran 212 Cottage Grove 213 Houlton 214 Minnetrista 215 Rogers 216 Shakopee 217 Glencoe Drive Lane 218 Glencoe Drive Lane 219 Park Place Drive Lane 220 Park Place- Drive Lane Corner 221 222 ORONO INDUSTRIAL BOULEVARD OLD CRYSTAL BAYROADBLOCK 1 LOT 1 MNDOT RIGHT OF WAY PLAT NO 27-129 TEMPUS ORONO LLC PID: 3311823130020 METRO STORAGE ORONO LLC PID: 3311823130019 WJM PROPERTIES LLC PID: 3311823130015 ORONO PRESERVE RESIDENTIAL DEVELOPMENT EX. BOUNDARY EX. BOUNDARY 10261025 1024 1022 102110201024102510241 0 2 3 1021 1024 10251026 102610261026 1026102610251025 1023 1020 PROPOSED BUILDING 1 PROPOSED BUILDING 2 PROPOSED BUILDING 3 PROPOSED BUILDING 4 PROPOSED BUILDING 5 102410.0' GRASS BUFFER PROPOSED TREES (TYP)PROPOSED CONIFERS (TYP) PROPOSED SHRUBS (TYP)PROPOSED PONDNATIVE GRASS (TYP) 10.0' GRASS BUFFER 10.0' GRASS BUFFER NATIVE GRASS (TYP) NATIVE GRASS (TYP) NATIVE GRASS (TYP) PROPOSED CONIFERS (TYP) ROCK (TYP) ROCK (TYP) 8.0' (TYP) 8.0' (TYP) 8.0' (TYP) 8.0' (TYP) 16.0' (TYP) 16.0' (TYP) STAGGER CONIFERS & TREES AS SHOWN (TYP) 16.0' (TYP) 16.0' (TYP) 16.0' (TYP) 16.0' (TYP) I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 09/18/2024 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT L1.1L1.0 NOT FOR CONSTRUCTIONL1.0ORONO GARAGE CONDOSSITE PLANPROPOSED LANDSCAPE PLAN09/18/2024 24015 LEHMRH0 SCALE: 1" = ORIGINAL GRAPHIC SCALE 15 30 60 30' NOTES: 1.CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER WITH ANY DISCREPANCIES. 2.CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONSTRUCTION STAKING. 3.INSTALL PERIMETER BMP'S PRIOR TO ANY CONSTRUCTION. 4.ALL TREES AND TREE ROOT ZONES OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED. 5.SEE SHEET C5.0 FOR CONSTRUCTION DETAILS. LEGEND PROPOSED 1' AND 5' CONTOURS PROPOSED TREE PROPOSED SHRUB PROPOSED CONIFER 1431 1430 TREES TYPE CONT QTY Shade Trees 1.5" to 2.0"18 Ornamental 1.0"17 SHRUBS CONT QTY Small Coniferous Shrubs 18" - 24"27 Small Deciduous Shrubs 27 CONIFERS CONT QTY Coniferous Tree 4' - 6'85 GROUND COVERS CODE BOTANICAL / COMMON NAME CONT SPACING QTY NATIVE GRASSES / Filter Strip Mix Shooting Star Native Seed or approved equal Seed 35,550 S.F. ROCK 3/4" River Rock / 3/4" River Rock ---3,100 S.F. GRASS BUFFER Poa pratensis / Kentucky Bluegrass ---5,760 S.F. Large Deciduous Tree 2' - 4'18 18" - 24" TYPE TYPE SUM OF TREES QTY 192 P:\24015_Orono Car Condo's\CAD\CD's\24015_L1.0-Proposed Landscape Plan.dwg, 9/30/2024 10:35:28 AM, 1:1, LEH223 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SIGNATURE: __________________________________________TYPED OR PRINTED NAME: MATTHEW R. HAGSTROM DATE: 09/18/2024 LICENSE NUMBER: 50731 Designed By:Date: Job No.: FOR AND ON BEHALF OF HAGSTROM ENGINEERING PLLC Checked By:811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL GOPHER STATE ONE CALL BENCHMARK:ByDateDescription of RevisionsNo.Sheet of D C B A 54321 219 6TH AVENUE EAST ALEXANDRIA, MN 56308 P.320.759.0764 WWW.HAGSTROMENG.COM HAGSTROM ENGINEERING CIVIL ENGINEERS | LAND CONSULTANTS CAUTION: IF THIS SHEET IS NOT 24"X36" IT IS A REDUCED PRINT L1.1L1.1 NOT FOR CONSTRUCTIONL1.1ORONO GARAGE CONDOSSITE PLANLANDSCAPE DETAILS09/18/2024 24015 LEHMRHPLANTING NOTES: 1.THE LANDSCAPE CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES WITHIN THE LIMIT OF WORK AND IS RESPONSIBLE FOR ANY DAMAGE AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 2.ALL TREE AND SHRUB LOCATIONS ARE TO BE STAKED ON SITE FOR APPROVAL BY THE CONSULTANT PRIOR TO INSTALLATION. 3.SUBSTITUTIONS: THE CONSULTANT SHALL APPROVE ANY SUBSTITUTION. 4.DO NOT PRUNE PLANTS UNLESS DIRECTED TO DO SO BY THE CONSULTANT. 5.CONTAINER STOCK IS PREFERRED FOR ALL PLANTS. IF CONTAINER STOCK IS NOT AVAILABLE FOR TREES, THEN ALL B&B PLANT MATERIAL SHALL HAVE ALL WIRE, TWINE, OR OTHER CONTAINMENT MATERIAL, EXCEPT FOR 100% HEMP BURLAP, REMOVED FROM THE TRUNK AND ROOT BALL OF THE PLANT PRIOR TO PLANTING. REMOVE THE TOP 2/3 OF THE HEMP BURLAP AFTER PLACING PLANT IN THE PIT. 6.PLANTING SOIL FOR ALL PLANTING AREAS: a.DO NOT STORE BULK MATERIALS NEAR STRUCTURES, OVER EXISTING PLANTING, OVER UTILITIES, WALKWAYS AND PAVEMENTS. a.PROVIDE EROSION CONTROL MEASURES TO PREVENT DISPLACEMENT OF BULK MATERIALS, DISCHARGE INTO WATERWAYS OR SEWERS, AND AIRBORNE DUST. b.PREPARING PLANTING AND SEEDING AREAS; SPREADING SOIL SHALL BE COMPLETED BY THE LANDSCAPE CONTRACTOR AND SUPERVISED BY THE GENERAL CONTRACTOR SO THAT GRADES ARE MET AS NOTED ON THE GRADING PLANS. c.PLANTING SOIL DEPTH SHALL BE A MINIMUM OF SIX (6) INCHES IN ALL LANDSCAPE BEDS. d.ALL PLANTING AREA SOIL SHALL BE 2-WAY (60% SAND, 40% COMPOST) TOPSOIL FROM AN APPROVED SOURCE. PROVIDE A 1-QUART SAMPLE FOR APPROVAL PRIOR TO IMPORTING ANY SOIL. TOPSOIL NOT MEETING INDUSTRY STANDARDS FOR COMPOSITION AND NUTRIENTS SHALL BE REJECTED. e.APPLY 2 INCHES OF APPROVED PLANTING SOIL OVER PREPARED SUBGRADE AND TILL INTO TOP 4 INCHES OF SUBSOIL. INSTALL REMAINING PLANTING SOIL TO A MINIMUM OF 4 INCHES SO THE TOTAL MINIMUM DEPTH OF NEW PLANTING SOIL IN NO LESS THAN 8 INCHES. ROLL AND RAKE SMOOTH. ENSURE NO ROCKS OR OTHER DEBRIS EXCEEDING 3 INCHES IN DIAMETER REMAIN. f.IF PREPARED SOIL OR PREPARED SUBGRADE IS RE-COMPACTED, RESTORE AS DIRECTED BY THE CONSULTANT. 9.INSTALL ROCKS IN ALL PLANTING BEDS TO A DEPTH OF 3 INCHES. 10.ROCKS SHALL NOT BE ABOVE OR MORE THAN 1/2 INCH BELOW ADJOINING SURFACE. MULCH SHALL BE HELD BACK 2-3 INCHES FROM THE STEMS AND TRUNKS OF PLANTS. 11.DURING PLANTING OPERATIONS, KEEP ADJACENT PAVING AREAS CLEAN AND PROTECTED FROM DAMAGE. WORK AREA SHALL BE KEPT CLEAN AND ORDERLY. 12.REMOVE NURSERY TAGS AND STAKES. 13.WARRANTY: INSTALLER AGREES TO WARRANTY PLANTING THAT FAILS IN MATERIALS, WORKMANSHIP OR GROWTH WITHIN A WARRANTY PERIOD OF 12 MONTHS FROM THE DATE OF PLANTING COMPLETION. 14.PLANT SYMBOLS SHALL DICTATE PLANT COUNT. 15.ALL LANDSCAPING SHALL BE PLANTED AND MAINTAINED IN A LIVING CONDITION BY THE CONTRACTOR UNTIL FINAL OWNER ACCEPTANCE. 16.IRRIGATION TO BE DESIGN BUILD BY IRRIGATION CONTRACTOR IF DESIRED BY OWNER. NOT PART OF THIS CONTRACT. 1" = 1'-0" TREE SINGLE STAKE PLANTING SHRUB AREAS. PLANTING AT STAKING DETAILPLANT PIT DETAIL TURF AREAS. PLANTING AT FX-PL-FX-TREE-022 TREE ON SLOPE - UNMODIFIED SOIL 1/2" = 1'-0" Native soil. Round-topped soil berm 4" high x 8" wide above root ball surface shall be centered on the downhill side of the root ball for 240°. Berm shall begin at root ball periphery. Finished grade. Bottom of root ball rests on existing or recompacted soil. SECTION VIEW Original slope should pass through the point where the trunk base meets substrate/soil. Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil. Loosened soil. Dig and turn the soil to reduce the compaction to the area and depth shown. 4" layer of mulch. No more than 1" of mulch on top of root ball. Slope sides of loosened soil. 3x widest dimension of root ball SLOPE 5% (20:1) TO 50% (2:1) 3 P:\24015_Orono Car Condo's\CAD\CD's\24015_L1.0-Proposed Landscape Plan.dwg, 9/30/2024 10:35:15 AM, 1:1, LEH224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 H:\ORNO\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\Orono Garage Condos\Orono Garage Condos_PrelimPlan.docx October 29, 2024 City of Orono Attn: Adam Edwards 2750 Kelley Parkway Orono, MN 55356 RE: Preliminary Plans Orono Garage Condos Engineering Review #1 Dear Adam: As requested, we have completed an engineering review of the documents submitted for the above referenced project. Following are my comments for your consideration: 1. Proposed improvements will require the installation of stormwater runoff management practices to meet Minnehaha Creek Watershed District and NPDES requirements for runoff treatment. The following should be considered regarding stormwater management: a. Not enough information has been provided to determine if the proposed design is adequate. A complete Stormwater Management Plan for the site meeting MCWD and NPDES requirements should be provided for review. b. Per MCWD requirements, the proposed stormwater runoff management system must provide rate control and volume control for the new and fully reconstructed impervious surfaces. For complete MCWD requirements, please refer to the following link: Regulations - Minnehaha Creek Watershed District (MCWD) c. Per NPDES requirements, the water quality volume must be treated, calculated as 1” times the sum of the new and fully reconstructed impervious surfaces. If infiltration is prohibited as outlined by NPDES requirements, a wet sedimentation basin or filtration basin may be utilized. For complete NPDES requirements, please refer to the following links: https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf d. The permanent best management practice chosen (infiltration, filtration, or wet sedimentation) must meet the design requirements outlined in the MCWD and NPDES permits. e. Per City requirements to track TMDLs and reduce loads to meet required Waste Load Allocations, the calculations for Total Suspended Solids (TSS) and Total Phosphorus (TP) loading should be included in the report. 2. The sanitary sewer capacity provided to the site is sufficient to support the development. 3. The water main capacity provided to the site is sufficient to support the development. 240 Preliminary Plans Orono Garage Condos Page 2 H:\ORNO\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\Orono Garage Condos\Orono Garage Condos_PrelimPlan.docx 4. Final Plans should include the following: a. Site Plan b. Grading, Drainage, and Erosion Control Plan c. Utility Plan d. Street Construction Plan e. Landscape and Restoration Plan f. SWPPP meeting NPDES requirements g. City Standard Details 5. The applicant will be required to obtain the following permits and provide a copy of any approvals required prior to Final Plat approval: a. MPCA Sanitary Sewer Extension Permit b. MDH Water Main Extension Permit c. Minnehaha Creek Watershed District (MCWD) d. NPDES General Construction Permit 6. The applicant will be required to submit a Maintenance Agreement for all stormwater management structures and facilities. The agreement must define maintenance responsibilities following completion of project, specify types and frequencies of inspection and maintenance activities, designate who will conduct inspection and maintenance activities, and outline reporting requirements. The Agreement should be recorded with the County per the City’s approval process. 7. Drainage and Utility Easements should be provided as follows: a. Over all stormwater management facilities used to meet regulatory requirements, including access routes. b. All swales, structures, and piping providing drainage for multiple properties. c. 5’ along all side lot lines, unless adjacent to Development boundary. d. 10’ along all front lot lines, rear lot lines, and adjacent to Development boundary. 8. Additional comments may be forthcoming once a complete Stormwater Management Plan is provided. If you have any questions or comments, please contact me to discuss. Sincerely, Bolton & Menk, Inc. Robert E. Bean, Jr., P.E. Water Resources Engineer 241 From:James VanEyll To:Laura Oakden Subject:RE: Garage Condo- Date:Thursday, March 13, 2025 8:50:28 AM Attachments:image001.png image002.png image003.png Hi Laura, I reviewed the attachments. They must add the hydrant inside their fenced-in area near the southeast corner. It can be a private hydrant but we will need an easement to this location for the water and sewer department to test and flush the hydrant. Thanks James Van Eyll, Fire Chief ORONO FIRE DEPARTMENT jvaneyll@oronomn.gov 952.249.4600 (Main) 952.249.4631 (Office) 952.367.6447 (Mobile) Office: 2700 Kelley Parkway, Orono, MN 55356 www.Oronomn.gov From: Laura Oakden <loakden@oronomn.gov> Sent: Wednesday, March 12, 2025 9:54 PM To: James VanEyll <jvaneyll@oronomn.gov> Subject: Garage Condo- James Please look at the attached plans and let me know what you think. In the civil set there is a identified fire lane turn around and in the maneuverability plan there is a access diagram. Can you take a look and let me know tomorrow you comments please Laura Oakden Community Development Director City of Orono Direct: 952-249-4602 2750 Kelley Parkway, Orono, MN 55356 www.oronomn.gov 242 243 Angie & Dan Complin 2830 Goldenrod Way Orono, MN 55356 January 28, 2025 Planning Commission City of Orono 2750 Kelley Parkway Orono, MN 55356 Dear Members of the Planning Commission, We hope this letter finds you well. We are writing to share our thoughts on the proposed garage condominium development at 430 Old Crystal Bay Road which is across the street from our home. As residents, we want to express our appreciation for the vision behind this project. The plans to redevelop the site into a more functional and attractive space are encouraging, especially given the current state of the property. While we are supportive of this project and its potential benefits, we kindly ask the Commission and the developers to consider a few aspects that could help ensure the development is a positive addition to our neighborhood. 1. Noise Management: As parents of two young children, maintaining a quiet and peaceful environment is important to our family, particularly during our children’s nap and bedtimes. We kindly ask that noise levels be carefully managed during construction and operations, with consideration for timing that minimizes disruptions to residents, especially those with young children. 2. Lighting Design: After reviewing the photometric study, we understand that lighting is a critical component of the project for safety and functionality. However, we would be grateful if measures could be taken to limit light spillover into nearby homes, such as shielded, downward-facing fixtures. This would help preserve the calm, natural character of the neighborhood, especially at night. 3. Landscaping: We were pleased to see the proposed landscape plan includes a variety of trees and plantings. The addition of evergreens, in particular, is wonderful as they will provide year-round greenery and privacy. We would respectfully encourage the planting of mature trees to quickly restore the natural buffer between the development and nearby homes that was lost when the original ~30 foot evergreens were removed by the owner. 244 4. Traffic Impact: With the addition of multiple units, there may be an increase in traffic flow in the area. If not already completed, a traffic study could provide insights into any potential impacts and ensure the neighborhood and nearby walking trails remain safe and accessible for everyone, especially children. 5. Construction Communication: We understand construction is a necessary part of progress and appreciate the care that goes into planning such projects. Having a clear timeline and regular communication from the developers would help residents prepare for any disruptions and maintain a positive relationship throughout the process. 6. Community Engagement: Finally, we want to encourage the developers to consider engaging with nearby residents directly to share updates and gather feedback. A collaborative approach could help address any remaining concerns and ensure the project is truly a win-win for everyone involved. Thank you for your time and for the care you bring to planning developments like this one. We believe this project has the potential to be a wonderful improvement for our community, and we appreciate your consideration of these thoughts as you move forward. Please don’t hesitate to reach out if further discussion would be helpful. Warm regards, Angie & Dan Complin Angie.complin@gmail.com Dan.complin@gmail.com 245 From:Bill Bruning To:Laura Oakden Subject:Garage Condo Proposal Date:Monday, February 10, 2025 7:25:50 PM Hello Ms. Oakden, With regards to the Garage Condo Proposal, we wish that this permit NOT be approved. Our concerns are the additional air, light and noise pollution this facility will bring to our area resulting in diminished quality of life and diminished property value. A brief history. We moved to Orono 31 years ago. Before purchasing our house we visited Orono City Hall asking where the highway 12 bypass was to be constructed. We were shown four routes, on record for 50 years, and chose our home’s location based on the information Orono provided. Nine months later, a fifth route was suddenly presented and approved by Orono, placing the highway next to our house. This required the elimination of the majority of trees in our area as well as our neighbor’s house, a new bridge was torn down and replaced with a larger lighted bridge, railroad was moved closer to our house, etc., all bringing 10 years of construction and 20+ years of highway noise. Orono’s mayor at that time told us not to address MnDOT with our concerns. Last year, Orono constructed a new public works facility by our house bringing additional traffic noise and all night lighting. Orono has made it challenging to be residents. We ask that Orono not add to those challenges with the construction of this garage condo facility. Thank you, Bette and Bill Bruning 315 Silver Meadow Dr. Orono 246 Date: March 17, 2025 Item: 7.1 Presenter: Laura Oakden, Community Development Director Section: Other Items Title: Appoint a Vice Chair 1.Purpose: To appoint a Vice Chair to the Planning Commission 2.Background: The Planning Commission has maintained a chair and a vice chair to the commission. The chair is responsible for calling the meeting to order, calling for motions and adjournment of the meeting. The vice chair assumes these responsibilities if the chair is absent from a meeting. In January 2025 the City Council appointed Commissioner Bollis as the chair and Commissioner Kirchner as the vice chair of the Planning Commission. Commissioner Kirchner has resigned from the commission. The commission should discuss and recommend appointment of a new Vice Chair for the remainder of the year. 3.Staff Recommendation: Make a recommendation to appoint a new vice chair. 4.Planning Commission Action Requested: Motion to nominate and appoint a new vice chair. AGENDA ITEM 247 Sign I n ! NAME 1. 0 a fA 14C 3 PLANNING COMMISSION y � Vs ADDRESS Date: r S' t.rc 11eh-I c N PoA5 PRESENT TO SPEAK FOR: ITEM # PUBLIC COMMENT 6* MJTL 64b 741P 1:1 7. ❑ s. ❑ 9. ❑ 10. ❑ 11. ❑ 12. ❑ Be ❑ 14. ❑ 15. ❑ assistive listening device available upon request