Loading...
HomeMy WebLinkAboutResolution 7564 Pre Plat 485 Orono Orchard Rd S iiL0�0 CITY OF ORONO RESOLUTION OF THE CITY COUNCIL -% G& NO. 7564 `ikESHO A RESOLUTION APPROVING THE PRELIMINARY PLAT FOR "SKY BLUE WATERS" FILE NO. LA25-000001 WHEREAS, Tom Bray(the"Developer") on behalf of Edward H. Hamm Jr., Trustee of "Amendment and Restatement of Trust of Edward H Hamm dated October 10th 1995", who is the owner of the property addressed 485 Orono Orchard Road South and legally described within Exhibit A (the "Property"); WHEREAS on January 6, 2025, the Developer applied for Preliminary Plat approval to subdivide the Property into two buildable lots; and WHEREAS, as part of the preliminary plat review, the Developer requested the City terminate the Declaration of Subdivision Covenants dated July 9, 1999 and recorded in the office of the Hennepin County Recorder on April 14, 2000, as Document No. 7285795 (the"Declaration"); and WHEREAS, after due published and mailed notice in accordance with Minnesota Statutes 462.358 et. seq. and the City of Orono Zoning and Subdivision Codes, on February 18, 2025, the Orono Planning Commission held a public hearing for the application at which time all persons desiring to be heard concerning the application were given the opportunity to speak thereon; and WHEREAS, on February 18, 2025, the Planning Commission reviewed the application and recommended by a vote of 6 to 1 that the City Council grant preliminary plat approval and terminate the Declaration, as applied; and WHEREAS, the City Council reviewed the proposal at a regular meeting held on March 10, 2025, and hereby makes the following findings with regards to this application: FINDINGS Al.This application was reviewed as Zoning File LA25-000001. A2.The Property is guided in the 2040 Orono Community Management Plan (CMP) for Rural Residential, 1 unit per 2 acres. The proposal involves the creation of 2 lots at 0.11 units per acre. The northern lot provides future subdivision opportunities; the project provides the opportunity to meet the CMP goals with a future subdivision. Staff finds the proposed plan brings the site closer to conformance of the CMP and meets the intent of the density goals at this time. A3.The proposal is consistent with surrounding development. 1 :suoglpuoo 6ulnnollol ay;o;;oafgns `a ;Ig14x3 se o;ejeq pegoe14e 9ZOZ/tZ/1.0 uo paslnaj pue tZOZ/£Z/Z l peep 6uuaau16u3 apung Aq 6u!Mwp/Aemns;eld tieu!w11aad ay;Jed uolslnlpgns;oi-Z a JoJ Ieno,Jddy;eld /Jeulw!Isad • pue :;ueo11ddy ay;Aq pel}ey;uawnoop „s;ueuenoa uolslnlpgng �o uogeaeloaa:o uogeulwJal„ ay;o;6ulpi000e uogejeloaa ay;jo uogeulwJa;ay;jo le/middy • :6u!MoIIoj ay;s;uW6 Agway ouap jo Alp p ay;Jo Ilounoa 40 ay; ienoge pe ou s6ulpul;ay;;o ejow Jo auo uodn peseq;ey; `a3A10832111.38 `3210d3213H1 `MON SNOI11ON00 aNH `S213a210 `SNOISll3NOO ]enadde Jo} papino,Jd uaaq sey;uewnoop uogeu!WJa;y •uoneaeloea ay;jo uogeu!WJa;6upenbeJ s1 JOUMO ay; `awl;sly; 'vsnw ay; u1 pepnloul uaaq souls seq Apado,jd eta 'ysnvi ay; my;lM;ou seen Apedoid ay; y6noy;Ie suogoauuoo J9MeS aaay;penoidde A4!O ay;`s6u1p11nq 6ugslxe ay;9AJ9S o;pue `6u111ej 9JOM swe sAs ogdeS 6ugslxe ay; '6661. uI •Janes'41a Aq !Dames AI;uaJJno s1 Apedo,Jd ay; 'uogejeloaa ay;6ulpJe6aei 6 Pi •awg sly;;e;aw;S xod pue y;nog peoel pJegOJQ ouap uo s;ulod sseooe 6ugslxe ay;Aq peiues eq o;enuguoo Illnn s;o1 ay;lo goes o;ssaooy 'OW •uleweJ o;pesodad we s;uewenadwl pue s6uIp11nq 6ugslxe IIV'6V *Rs uo pagguapl Jo panuasgo 9J9M saglunwwoo;veld wei oN *seam pueuem pue suMel peule;ulew ay;uaann;aq sadols AI;sow uo a;ls ay;jo same Z Ala;ewlxoJdde Janoo s;saJoj pooMsseq eldew pue :sessea6}in; pannow pue saoepns snolnJedwl y;IM padolanap s1 swoe Z•g 'puel;eM jo sane Z•Z 'seam pa;englno Jo pa;ueld Jo same el, Ala;ewlxoJdde jo s;slsuoo Apadojd aloe-E'6Z ayl '9V *(wail);awls xod 6uole y;p!M ul ;sal cite aney IIIM pue same;au g•Z eq o;pesodoid sl Z;o1 •q •(;ua;);aal;S xo3 6uo1e ylp!M u1 ;aa;00£ pue peod pi.egaio oUOJQ uo e6e;ua; Jo;as;00E`6 Ala;ewlxoadde any IIIM;1 :same;au g g 6 eq o; pesodoid s1 (y}iou) 6 ;o1 •e •spiepue;s;o!J;slp 6uluoz wnwlulw ay;;saw s;ol pesodoid ayl ;01 a gepllnq Mau auo swan prom mid pesodoid ayl'Ly •elgeP1lnq 'tip eq o;pwePlsuoo s1 puei ay;Jo sane 611, teem IB;o; u1 swoe 9 6'EZ sl a;Is ay'I(la;ewlxoadde jo ewe Ie;o;e sule;uoo Apedoad syl'9V gaol 00Z 10 1141:!M101 wnwlulw e pue same Z jo ewe ;ol wnwlulw e ssnnbei 40WWM `;o1J4s!a Ieguaplsad !Bind Allwed el6u1S 8 I.-2121 pauoz s1 Apedo,id au•gy •sllaM Aiddns JeleM a;en!Jd pue Jamas 40 1-111M penes eq IIIM pue VSnw ay; u!y;1M ps;eool s1 Apadoid ayl•yy A41, TIDMf1OD AID Mil 3O NOI1f fOS3/1 ON0210 ±10 AZID °kO g.0Ar0 CITY OF ORONO RESOLUTION OF THE CITY COUNCIL NO. 7564 ikESHOo. B1.Lot Standards. Any proposed improvements must meet all setbacks requirements of the Zoning Code. B2.Drainage and Utility Easements. On the final plat, Drainage and Utility Easements shall be dedicated to the public 10 feet along all exterior property lines, and 5 feet either side of interior property lines, except such easements shall be increased to accommodate drainage where required, subject to City staff approval. If applicable, Drainage Easements shall be granted over any stormwater facilities required by the Minnehaha Creek Watershed District; the Drainage Easements shall be shown on the Plat. B3.Development Fees. *Final fee amounts will be provided at the time of Final Plat. a. Park Dedication Fee. The subdivision is subject to the standard Park Dedication Fee requirement. Absent the need for a land dedication, the project will be subject to the City's Park Dedication Fee at the time of Final Plat. This fee is determined by the fair market value of the land being subdivided. The Hennepin County Assessor will be consulted to determine the market value of the land to establish the amount of the fee. The developer is proposing two building sites or one (1) new lot. The Park Fee for this development will be approximately $8,168*. b. Stormwater and Drainage Trunk Fee. The development is subject to the Stormwater and Drainage Trunk Fee, as established in the City's Official Fee Schedule at the time of Final Plat approval. Currently, based on the 2025 Fee Schedule, the development of a property within a 2- acre residential zone requires payment of$8,060 per each new lot and as proposed, the Developer will be subject to payment of a SWDT fee for one new lot or$8060.00*. B4.City Engineer Approval. Approval of the plat is subject to recommendations of City Engineer Adam Edwards. B5.Plans and Specifications. The plans and specifications submitted for review and approval by the City and other appropriate jurisdictions prior to approval of the Final Plat. B6.Expiration. Authorities granted by this resolution run with the Property not with the Owners, but are permissive only and must be exercised by filing a Final Plat application within one year of the date of Council approval, or the preliminary plat approvals will expire on that date. 3 �� O CITY OF ORONO RESOLUTION OF THE CITY COUNCIL �, �G•� No. 7564 7kESHp_ FINAL SUBMITTALS The following list of final submittals must be submitted to the Community Development Department at least four(4) weeks prior to the regularly scheduled Council meeting (on the second and fourth Mondays of the month). The required submittals are as follows: C1.Record plat drawings in the form of(1) to-scale digital copy; two (2) mylar copies (one copy for the City's records and one for filing with Hennepin County); and one (1) copy reduced to 1" = 200'. Drawing to include: a. Lot lines platted per preliminary plat survey/drawing by Sunde Engineering dated 01/24/2025 attached hereto as Exhibit B, except as modified herein. b. Dedication of Drainage and Utility Easements 10' along exterior property lines and 5' along the interior property line, with exceptions and additions as noted herein. c. Dedication of Drainage Easements over all drainageways. d. Naming of plat. C2.Legal documents required: a. Title opinion addressed to the City or a title insurance policy in favor of the City. All owners, mortgage holders or others with property interest indicated therein shall sign the plat and all other documents affected by such interest. b. The Developer must provide certified copies of all recorded easements currently affecting the Property. C3.Plat approval fees to be paid: Total due: $19,528.00** Final Plat development fees will be determined by the official fee schedule at the time of Final Plat review. a. Final plat fee: $800.00 b. Park Dedication Fee: $8,168** c. Stormwater and Drainage Trunk Fee: $ 8,060.00** d. Final Plat Escrow: $2,500.00 4 et RESOLUTION CITY OF ORONO RESOLUTION OF THE CITY COUNCIL ' r, . �� NO. 7564 kESH04 C4.This Approval shall be effective until March 10, 2026 per the provisions of Zoning Code Section 82- 116. If Final Plat Approval is not granted by that date, the terms and conditions of this resolution shall be null and void. The City Council at its sole discretion may extend this effective period. ADOPTED by the Orono City Council on this 10th day of March, 2025. ATTEST: 4 CITY OF ORONO: �W I Christine Lusian, City rip Bob Tunheim, Mayor 5 Existing Legal Description (Per Stewart Title Guaranty Company as issued by Trademark Title Services, Inc. Commitment for Title Insurance Commitment No. 24-4094, commitment date October 21, 2024) The land referred to in this Commitment is described as follows: That part of Government Lot 4 and the Southwest Quarter of Section 2, Township 117, Range 23, Hennepin County, Minnesota, described as follows: Beginning at a point on the East line of Government Lot 4, distant 434.3 feet South of the Northeast corner thereof, designated as Point A; thence Northwesterly deflecting to the right from said East line IOI degrees 43 minutes, o distance of 182 feet; thence Northwesterly 60 feet along a curve to the right with a radius of 4687.5 feet; thence Northwesterly 200 feet along a curve to the right with a radius of 222.45 feet; thence Northerly 175 feet along a curve to the right with a radius of 237.56 feet; thence Northerly 50 feet along a curve to the right with a radius of 527.42 feet; thence Northeasterly to a point on the North line of Government Lot 4, distant 360 feet West of the Northeast corner thereof designated as Point B; thence northeasterly 55.51 feet along a line which forms an angle of 68 degrees 40 minutes 08 seconds with said North line of Government Lat 4; thence northerly 100.00 feet along a tangential curve concave to the west having a radius of 181.40 feet and a central angle of 31 degrees 35 minutes 07 seconds; thence northwesterly 125.00 feet along a compound curve concave to the west having a radius of 283.70 feet and a central angle of 25 degrees 14 minutes 42 seconds; thence northwesterly on a line tangent to last described curve 267.40 feet; thence northwesterly deflecting 02 degrees 23 minutes 00 seconds to the left from last described course 123.34 feet; thence northwesterly 104.40 feet along a tangential curve concave to the southwest having a radius of 164.00 feet and a central angle of 36 degrees 28 minutes 30 seconds, to a point on the west line of the East One-Half of the Northwest Quarter of the Southwest Quarter of said Section 2, exclusive of the highway (33 feet wide) upon the easterly side thereof, said East One-Half being ascertained after taking from the Northwest Quarter of the Southwest Quarter of said section said highway upon the easterly side, and which is 636.66 feet north from the Southwest corner of said East One-Half so ascertained; thence north along said west line of the East One-Half so ascertained 679.66 feet to the northwest corner thereof; thence east along the north line of the Southwest Quarter of said Section 2 to the northeast corner of the Northwest Quarter of the Southwest Quarter of Section 2; thence south along the east line of said Northwest Quarter of the Southwest Quarter of Section 2 and Government Lot 4 to the point of beginning. Also that part of said West One-Half of the Northwest Quarter of the Southwest Quarter of Section 2 exclusive of highway (33 feet wide) on the easterly side thereof, said West One Half being ascertained after taking from said Northwest Quarter of the Southwest Quarter of Section 2 said highway upon the easterly side; lying easterly of Macmillan Addition, according to the recorded plat thereof and northerly of a line and its westerly extension described as commencing at the northeast corner of said West One- Half so ascertained; thence on on assumed bearing of South 00 degrees 17 minutes 01 seconds East, along the east line of said West One-Half so ascertained 679.85 feet, more or less to a point 636.66 feet north of the southeast earner af said West One-Half, said point being the point of beginning of the line to be described; thence deflecting right at an angle of 83 degrees 53 minutes 00 seconds on a line bearing South 83 degrees 35 minutes 59 seconds West 33.68 feet; thence South 82 degrees 23 minutes 59 seconds West 66.32 feet to the most southerly southeast corner of Outlot C, said Macmillan Addition and said line there terminating. Together with a non-exclusive easement for driveway purposes over, under and across part of Outlot C and Lot 2, Block I, MacMillan Addition and the Northwest Quarter of the Southwest Quarter of Section 2, Township 17, Range 23, as described in the Private Road Agreement recorded January 14, 1930 as Document No. Al579568 and amended in the Agreement Regarding Correction of Easement Legal Description recorded June 19, 2018 as Document Nos. Al0563491 and T5538418. Together with a non-exclusive easement for driveway purposes aver that part of Government Lot 4, Section 2, Township 117, Range 23 lying Northerly and Easterly of a line and its extension drawn parallel with and 8 feet distant Southerly and Westerly from the line between Point A and Point B measured at right angles and radially to said line between Point A and Point B as contained in instrument recorded in CR Book 1643 of Deeds, page 333, Doc. No. 2295932. (See Order Doc. No. 6076705). Hennepin County, Minnesota. PRELIMINARY PLAT FOR:SKY BLUE WATERS ADDITION11ofwww.sunde.comOF: 485 ORONO ORCHARD ROAD S, ORONO, MN