Loading...
HomeMy WebLinkAboutRPS22-000148 Final Permit Summary1 Jason (Tano) Mejia From:gnelson@oronomn.gov Sent:Friday, January 31, 2025 11:58 AM To:Gary Nelson Cc:Jason (Tano) Mejia; Katie Fitzsimmons Subject:Inspection Report Individual CITY OF ORONO 2750 KELLEY PARKWAY ORONO, MN 55356 PH: (952) 249-4600 FAX: (952) 249-4616 Inspection Report 2970 Lillian LN Permit Number: RPS22-000148 Site Address: 2970 Lillian LN, Orono, MN 55356 Property Owner: TOBY B TYLER & ERIN B TYLER Description: Extend Mud Room on First Floor & 2nd floor Addition on Existing Garage Inspection Date: 06/09/2023 Inspection Type: Building Final Inspection Results: Permit Finaled Sincerely, Gary Nelson 952-242-4442 To schedule your inspections please call: (952) 249-4600 FILE SUMMARY REPORT March 06, 2025 FILE INFORMATION File #:22-001447 Address:2970 Lillian LN Status: Closed Parcel #:3311823310017 Open Date:10/07/2022 Description:Extend Mud Room on First Floor & 2nd floor Addition on Existing Garage Close Date:03/06/2025 Owner Name:TOBY B TYLER & ERIN B TYLER Type:Permitting Owner Address:5312 WEST NOKOMIS PKWY MINNEAPOLIS MN 55417 CONTACTS CONTACT ASSOCIATION CONTACTTYPE ADDRESS PHONE Chamberlain Fine Custom Homes Paul Cameron Applicant Contractor Company Address: 15612 Highway 7 Suite 300 Minnentonka MN 55345 Home Address: 15612 Highway 7 Suite 300 Minnentonka MN 55345 Work: (952) 649-7653 Mobile: (952) 649-7653 Home: (952) 649-7653 PERMITS PERMIT #TYPE DATES APPLICANT DESCRIPTION RPS22- 000148 Residential Principal Structure Building Permit Exterior / Structural Modification or Addition Status: Closed Application Date: 10/07/2022 Issue Date: 11/04 /2022 Expiration Date: 12/09/2023 Close Date: 03/06 /2025 Chamberlain Fine Custom Homes Extend Mud Room on First Floor & 2nd floor Addition on Existing Garage INSPECTIONS PERMIT #TYPE INSPECTION DATE INSPECTOR STATUS RPS22-000148 Footing 11/15/2022 Gary Nelson Inspection Passed: Proceed RPS22-000148 Framing 11/29/2022 Gary Nelson Inspection Passed: Proceed RPS22-000148 Framing 12/06/2022 Gary Nelson Partial Pass RPS22-000148 Framing 01/27/2023 Gary Nelson Inspection Passed: Proceed RPS22-000148 Building Final 06/09/2023 Gary Nelson Permit Finaled REVIEWS PERMIT #TYPE REVIEW DATE REVIEWER STATUS RPS22-000148 Completeness Check 10/11/2022 Katie Fitzsimmons Review Approved RPS22-000148 Grading Review 10/12/2022 Adam Edwards Review Approved RPS22-000148 Zoning Review 10/20/2022 Melanie Curtis Review Approved RPS22-000148 Building Code Review 10/26/2022 Nicole Post Review Denied RPS22-000148 Building Code Review 10/28/2022 Nicole Post Review Denied RPS22-000148 Building Code Review 11/04/2022 Nicole Post Review Approved RPS22-000148 Septic Review 11/04/2022 Nicole Post Review complete: Comments added RPS22-000148 Final Review 11/04/2022 Melanie Curtis Review Approved ACTIVITIES PERMIT #TYPE ACTIVITY DATE ASSIGNED TO STATUS RPS22-000148 Online Payment Received 10/07/2022 Alicia Johnson Complete RPS22-000148 Online Permit Application 10/07/2022 Katie Fitzsimmons Complete RPS22-000148 Online Document Upload 10/07/2022 Katie Fitzsimmons Complete RPS22-000148 Online Document Upload 10/07/2022 Katie Fitzsimmons Complete RPS22-000148 Online Document Upload 10/11/2022 Katie Fitzsimmons Complete RPS22-000148 Online Document Upload 10/11/2022 Katie Fitzsimmons Complete RPS22-000148 Online Document Upload 10/27/2022 Melanie Curtis Complete RPS22-000148 Online Document Upload 10/28/2022 Melanie Curtis Complete RPS22-000148 Online Document Upload 11/02/2022 Melanie Curtis Complete RPS22-000148 Online Document Upload 11/04/2022 Melanie Curtis Complete RPS22-000148 Required Inspections 11/04/2022 Nicole Post Review Approved RPS22-000148 Online Payment Received 11/04/2022 Alicia Johnson Complete RPS22-000148 Review Complete 11/04/2022 Alicia Johnson Complete Activity Completed 03/06/2025 System User DOCUMENTS SOURCE DOCUMENT NAME DATE CREATED BY Construction documents (Footing/ foundation, floor, elevation, wall bracing, etc.) A103 First Floor Plan-Revisions.pdf 09-27-2022.pdf 10/07 /2022 System User Construction documents (Footing/ foundation, floor, elevation, wall bracing, etc.) A104 Second Floor Plan-Revisions. pdf 09-27-2022.pdf 10/07 /2022 System User Construction documents (Footing/ foundation, floor, elevation, wall bracing, etc.) A201-Front Elevation.pdf 09-27- 2022.pdf 10/07 /2022 System User New Construction Minnesota State Energy Code Calculations CLICK HERE 2970 Lillian Lane - energy_cert.xls 10/07 /2022 System User New Construction Ventilation, Make up and Combustion Air Calculations Submittal Form CLICK HERE Orono Heat Calc Worksheet.pdf 10/07 /2022 System User Certified Site Plan: CLICK HEREbsp 2019014 grading as-built 7-14-2021. pdf 10/07 /2022 System User Minnehaha Creek Watershed District (MCWD) Permit; OR Documentation from MCWD stating no permit is required MCWD.docx 10/07 /2022 System User Erosion Control Plan MCWD.docx 10/07 /2022 System User Hardcover Calculations MCWD.docx 10/07 /2022 System User Hardscape Plan MCWD.docx 10/07 /2022 System User Applicant Signature signature.png 10/07 /2022 System User System Email Your permit application has been received.htm 10/07 /2022 System User System Email Online Payment Received.htm 10/07 /2022 System User System Email Your citizenserve payment has been received.htm 10/07 /2022 System User Online Document Upload InkedHelical Pier.jpg 10/07 /2022 System User System Email Online Document Upload Received. htm 10/07 /2022 System User Online Document Upload 2020 Pier Lilian Lane.pdf 10/07 /2022 System User System Email Online Document Upload Received. htm 10/07 /2022 System User Email Single Reviewer Plan Review.htm 10/10 /2022 Katie Fitzsimmons Survey 2019014 with proposed addition 10- 10-2022.pdf 10/10 /2022 System User System Email Online Document Upload Received. htm 10/10 /2022 System User Online Document Upload Minnehaha Creek Watershed District permit response.pdf 10/11 /2022 System User System Email Online Document Upload Received. htm 10/11 /2022 System User Septic As-built Septic Asbuilt Form_2790 Lillian La_11-15-19.pdf 10/20 /2022 Melanie Curtis Email Single Reviewer Plan Review.htm 10/26 /2022 Nicole Egan Online Document Upload 2970 Lillian Lane Original Pre Addition.pdf 10/27 /2022 System User System Email Online Document Upload Received. htm 10/27 /2022 System User Online Document Upload Floor Truss Layout.pdf 10/27 /2022 System User Online Document Upload Floor Truss Profiles.pdf 10/27 /2022 System User Online Document Upload Mud Room Truss Layout.pdf 10/27 /2022 System User Online Document Upload Mud Room Truss Profile .pdf 10/27 /2022 System User Online Document Upload Roof Truss Layout.pdf 10/27 /2022 System User Online Document Upload Roof Truss Profiles.pdf 10/27 /2022 System User System Email Online Document Upload Received. htm 10/27 /2022 System User Online Document Upload Responses to Building Official Questions.pdf 10/27 /2022 System User System Email Online Document Upload Received. htm 10/27 /2022 System User Email Single Reviewer Plan Review.htm 10/28 /2022 Nicole Egan Online Document Upload A103 First Floor Plan-Revised-2.pdf 11-01-2022.pdf 11/02 /2022 System User Online Document Upload A201 Exterior Elevations & Section- Revised.pdf 11-01-2022.pdf 11/02 /2022 System User Online Document Upload A-SC01-Entry & Office Section-2.pdf 11-01-2022.pdf 11/02 /2022 System User Online Document Upload Floor plans bed count 5.pdf 11/02 /2022 System User Online Document Upload Response to Building Official email 10.28.22 .pdf 11/02 /2022 System User System Email Online Document Upload Received. htm 11/02 /2022 System User Online Document Upload SC104 Second Floor Plan-Revised. pdf 11-01-2022.pdf 11/04 /2022 System User Online Document Upload Heat Calcs .pdf 11/04 /2022 System User Online Document Upload Orono Ventilation, Makeup and Comb Air Form .pdf 11/04 /2022 System User Approved for Permit 2970 Lillian ln combined.pdf 11/04 /2022 Nicole Egan Approved for Permit 2019014 with proposed addition 10- 10-2022 with markups.pdf 11/04 /2022 Melanie Curtis System Email Your citizenserve application status has changed.htm 11/04 /2022 System User System Email Online Payment Received.htm 11/04 /2022 System User System Email Your citizenserve payment has been received.htm 11/04 /2022 System User System Email Your citizenserve application status has changed.htm 11/04 /2022 System User Merge document Permit Approved.htm 11/04 /2022 Alicia Johnson Merge document Inspection Card.htm 11/04 /2022 Alicia Johnson Email Inspection Report Individual.htm 11/15 /2022 Gary Nelson Email Inspection Report Individual.htm 11/29 /2022 Gary Nelson Email Inspection Report Individual.htm 12/06 /2022 Gary Nelson Email Inspection Report Individual.htm 01/27 /2023 Gary Nelson Email Inspection Report Individual.htm 01/31 /2025 Gary Nelson