Inspection Report
2970 Lillian LN
Permit Number: RPS22-000148
Site Address: 2970 Lillian LN, Orono, MN 55356
Property Owner: TOBY B TYLER & ERIN B TYLER
Description: Extend Mud Room on First Floor & 2nd floor Addition on Existing Garage
Inspection Date: 06/09/2023
Inspection Type: Building Final
Inspection Results: Permit Finaled
Sincerely,
Gary Nelson
952-242-4442
To schedule your inspections please call: (952) 249-4600
FILE SUMMARY REPORT
March 06, 2025
FILE INFORMATION
File #:22-001447 Address:2970 Lillian LN
Status: Closed Parcel #:3311823310017
Open Date:10/07/2022 Description:Extend Mud Room on First Floor & 2nd floor Addition on Existing Garage
Close Date:03/06/2025 Owner Name:TOBY B TYLER & ERIN B TYLER
Type:Permitting Owner Address:5312 WEST NOKOMIS PKWY
MINNEAPOLIS MN 55417
CONTACTS
CONTACT ASSOCIATION CONTACTTYPE ADDRESS PHONE
Chamberlain Fine Custom Homes
Paul Cameron
Applicant Contractor Company Address:
15612 Highway 7 Suite 300
Minnentonka MN 55345
Home Address:
15612 Highway 7 Suite 300
Minnentonka MN 55345
Work: (952) 649-7653
Mobile: (952) 649-7653
Home: (952) 649-7653
PERMITS
PERMIT
#TYPE DATES APPLICANT DESCRIPTION
RPS22-
000148
Residential Principal
Structure Building Permit
Exterior / Structural
Modification or Addition
Status: Closed
Application Date:
10/07/2022
Issue Date: 11/04
/2022
Expiration Date:
12/09/2023
Close Date: 03/06
/2025
Chamberlain Fine
Custom Homes
Extend Mud Room on First Floor & 2nd floor
Addition on Existing Garage
INSPECTIONS
PERMIT #TYPE INSPECTION DATE INSPECTOR STATUS
RPS22-000148 Footing 11/15/2022 Gary Nelson Inspection Passed: Proceed
RPS22-000148 Framing 11/29/2022 Gary Nelson Inspection Passed: Proceed
RPS22-000148 Framing 12/06/2022 Gary Nelson Partial Pass
RPS22-000148 Framing 01/27/2023 Gary Nelson Inspection Passed: Proceed
RPS22-000148 Building Final 06/09/2023 Gary Nelson Permit Finaled
REVIEWS
PERMIT #TYPE REVIEW DATE REVIEWER STATUS
RPS22-000148 Completeness Check 10/11/2022 Katie Fitzsimmons Review Approved
RPS22-000148 Grading Review 10/12/2022 Adam Edwards Review Approved
RPS22-000148 Zoning Review 10/20/2022 Melanie Curtis Review Approved
RPS22-000148 Building Code Review 10/26/2022 Nicole Post Review Denied
RPS22-000148 Building Code Review 10/28/2022 Nicole Post Review Denied
RPS22-000148 Building Code Review 11/04/2022 Nicole Post Review Approved
RPS22-000148 Septic Review 11/04/2022 Nicole Post Review complete: Comments added
RPS22-000148 Final Review 11/04/2022 Melanie Curtis Review Approved
ACTIVITIES
PERMIT #TYPE ACTIVITY DATE ASSIGNED TO STATUS
RPS22-000148 Online Payment Received 10/07/2022 Alicia Johnson Complete
RPS22-000148 Online Permit Application 10/07/2022 Katie Fitzsimmons Complete
RPS22-000148 Online Document Upload 10/07/2022 Katie Fitzsimmons Complete
RPS22-000148 Online Document Upload 10/07/2022 Katie Fitzsimmons Complete
RPS22-000148 Online Document Upload 10/11/2022 Katie Fitzsimmons Complete
RPS22-000148 Online Document Upload 10/11/2022 Katie Fitzsimmons Complete
RPS22-000148 Online Document Upload 10/27/2022 Melanie Curtis Complete
RPS22-000148 Online Document Upload 10/28/2022 Melanie Curtis Complete
RPS22-000148 Online Document Upload 11/02/2022 Melanie Curtis Complete
RPS22-000148 Online Document Upload 11/04/2022 Melanie Curtis Complete
RPS22-000148 Required Inspections 11/04/2022 Nicole Post Review Approved
RPS22-000148 Online Payment Received 11/04/2022 Alicia Johnson Complete
RPS22-000148 Review Complete 11/04/2022 Alicia Johnson Complete
Activity Completed 03/06/2025 System User
DOCUMENTS
SOURCE DOCUMENT NAME DATE CREATED
BY
Construction documents (Footing/ foundation, floor, elevation, wall
bracing, etc.)
A103 First Floor Plan-Revisions.pdf
09-27-2022.pdf
10/07
/2022
System
User
Construction documents (Footing/ foundation, floor, elevation, wall
bracing, etc.)
A104 Second Floor Plan-Revisions.
pdf 09-27-2022.pdf
10/07
/2022
System
User
Construction documents (Footing/ foundation, floor, elevation, wall
bracing, etc.)
A201-Front Elevation.pdf 09-27-
2022.pdf
10/07
/2022
System
User
New Construction Minnesota State Energy Code Calculations
CLICK HERE
2970 Lillian Lane - energy_cert.xls 10/07
/2022
System
User
New Construction Ventilation, Make up and Combustion Air
Calculations Submittal Form CLICK HERE
Orono Heat Calc Worksheet.pdf 10/07
/2022
System
User
Certified Site Plan: CLICK HEREbsp 2019014 grading as-built 7-14-2021.
pdf
10/07
/2022
System
User
Minnehaha Creek Watershed District (MCWD) Permit; OR
Documentation from MCWD stating no permit is required
MCWD.docx 10/07
/2022
System
User
Erosion Control Plan MCWD.docx 10/07
/2022
System
User
Hardcover Calculations MCWD.docx 10/07
/2022
System
User
Hardscape Plan MCWD.docx 10/07
/2022
System
User
Applicant Signature signature.png 10/07
/2022
System
User
System Email Your permit application has been
received.htm
10/07
/2022
System
User
System Email Online Payment Received.htm 10/07
/2022
System
User
System Email Your citizenserve payment has been
received.htm
10/07
/2022
System
User
Online Document Upload InkedHelical Pier.jpg 10/07
/2022
System
User
System Email Online Document Upload Received.
htm
10/07
/2022
System
User
Online Document Upload 2020 Pier Lilian Lane.pdf 10/07
/2022
System
User
System Email Online Document Upload Received.
htm
10/07
/2022
System
User
Email Single Reviewer Plan Review.htm 10/10
/2022
Katie
Fitzsimmons
Survey 2019014 with proposed addition 10-
10-2022.pdf
10/10
/2022
System
User
System Email Online Document Upload Received.
htm
10/10
/2022
System
User
Online Document Upload Minnehaha Creek Watershed
District permit response.pdf
10/11
/2022
System
User
System Email Online Document Upload Received.
htm
10/11
/2022
System
User
Septic As-built Septic Asbuilt Form_2790 Lillian
La_11-15-19.pdf
10/20
/2022
Melanie
Curtis
Email Single Reviewer Plan Review.htm 10/26
/2022
Nicole Egan
Online Document Upload 2970 Lillian Lane Original Pre
Addition.pdf
10/27
/2022
System
User
System Email Online Document Upload Received.
htm
10/27
/2022
System
User
Online Document Upload Floor Truss Layout.pdf 10/27
/2022
System
User
Online Document Upload Floor Truss Profiles.pdf 10/27
/2022
System
User
Online Document Upload Mud Room Truss Layout.pdf 10/27
/2022
System
User
Online Document Upload Mud Room Truss Profile .pdf 10/27
/2022
System
User
Online Document Upload Roof Truss Layout.pdf 10/27
/2022
System
User
Online Document Upload Roof Truss Profiles.pdf 10/27
/2022
System
User
System Email Online Document Upload Received.
htm
10/27
/2022
System
User
Online Document Upload Responses to Building Official
Questions.pdf
10/27
/2022
System
User
System Email Online Document Upload Received.
htm
10/27
/2022
System
User
Email Single Reviewer Plan Review.htm 10/28
/2022
Nicole Egan
Online Document Upload A103 First Floor Plan-Revised-2.pdf
11-01-2022.pdf
11/02
/2022
System
User
Online Document Upload A201 Exterior Elevations & Section-
Revised.pdf 11-01-2022.pdf
11/02
/2022
System
User
Online Document Upload A-SC01-Entry & Office Section-2.pdf
11-01-2022.pdf
11/02
/2022
System
User
Online Document Upload Floor plans bed count 5.pdf 11/02
/2022
System
User
Online Document Upload Response to Building Official email
10.28.22 .pdf
11/02
/2022
System
User
System Email Online Document Upload Received.
htm
11/02
/2022
System
User
Online Document Upload SC104 Second Floor Plan-Revised.
pdf 11-01-2022.pdf
11/04
/2022
System
User
Online Document Upload Heat Calcs .pdf 11/04
/2022
System
User
Online Document Upload Orono Ventilation, Makeup and
Comb Air Form .pdf
11/04
/2022
System
User
Approved for Permit 2970 Lillian ln combined.pdf 11/04
/2022
Nicole Egan
Approved for Permit 2019014 with proposed addition 10-
10-2022 with markups.pdf
11/04
/2022
Melanie
Curtis
System Email Your citizenserve application status
has changed.htm
11/04
/2022
System
User
System Email Online Payment Received.htm 11/04
/2022
System
User
System Email Your citizenserve payment has been
received.htm
11/04
/2022
System
User
System Email Your citizenserve application status
has changed.htm
11/04
/2022
System
User
Merge document Permit Approved.htm 11/04
/2022
Alicia
Johnson
Merge document Inspection Card.htm 11/04
/2022
Alicia
Johnson
Email Inspection Report Individual.htm 11/15
/2022
Gary Nelson
Email Inspection Report Individual.htm 11/29
/2022
Gary Nelson
Email Inspection Report Individual.htm 12/06
/2022
Gary Nelson
Email Inspection Report Individual.htm 01/27
/2023
Gary Nelson
Email Inspection Report Individual.htm 01/31
/2025
Gary Nelson