Loading...
HomeMy WebLinkAbout1989-06-06 Insp Notice, Construction FINAL0 TIME CITY OF ORONO CALLED IN INaPECTION NOTICE SCHEDULED 4011 - s PEAT NO. COMPLETED 1 FOOTING a PLUMSaNG Al Z- FIRE PREV. �. FRAMING C7 PLUMIDING FINAL C FIRE SUPIllINON SYS. W INS"ION C MECHANICAL RI ❑ EXCAYKWVZPSGff%AJNO I WALL S>D. C MECHANICAL FINAL C LAKESHOPKNAETLAOM ► NER C TREE REMOVAL FINALu' FIREPLACE/W000 BURVA MO — SITE C WATER HOOK-UP C KENNEL LICENSE r X DEMO --FINAL C METER SETITURN ON C SITE INSPECTION i d , SEWER HOOK -IJP d MOGRESS SEPTIC MMNL C OOMPLAWT j SEPTIC INSTALL C POLLOWUP i G SEPTIC FINAL C SITE WELL f C WELL TEST PUMP f -7,e It Lr►'t1c• L: atL: ■ ' t f WORK SATISFACTORY PRoGEED J PHOTN C CORRECT WORK i PROCEED CITATION MGM C CORRECT WORK, CALL FOR IIFINSPECTION ISSUE CERTIFICATE OF OCCUP JiCY BEFOREC0VEPANG TEMPORARY CORRECT UNSAFE CONDITION WITHIN HOURS PERMANENT WSPECTOR WILL RETURN STOP OMER POSTED CALL INSPECTOR i INSPECTION REQUIRED. CALL TO ARRANGE ACCESS ca i AFRI wapo m i4 h0 in samim 473-M7 MMc w