Loading...
HomeMy WebLinkAbout1987-11-03 Septic System DesignS -P TESTING, INC. 951 KATYDID LANE ST. MICHAEL, MN 55378 497.3588 STEVE SHIRMERS November'3, 1487 Tom Betz Lot 1 of Lot 41 Auditor's Sub #203 Stubbs Bay load Orono, Henn. Co., MN This system is designed for a Type 1, four bedroom nome and in accordance with the Minnesota Pollution Control Agency standards WPC 40 and local ordinances. The soils on this site are typical of SCS soils mapped - KkC - Kilkenny loam. A seasonally high water table was located at. 26", 28", 30", 6 42", (mottl- ing). Due to the seasonally high water table, a pressurized mound system will need to be installed. The bottom of the rock bed must be located at least 3' above the seasonally high water table. The soils at a depth of 18" have a percolation rate averaging 13.6 min/inch and are adequate for treating septic effluent. A pumping chamber will need to be installed to lift the effluent to the treatment area. The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this Is in case of a pump failure. (Mercury floats are a good method). All neighboring wells are located more than 100' away from the proposed treatment area and 75' away on this site. Keep all heavy equipment off of the proposed treatment area before and after construction. as much as possible. The treatment area should be marked off before construction. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. It is recommended that the septic tanks be pumped every 2 years. Soil and Percolation Taus Steven X Schirmers SBS/ds Sepik Systems Design — aYoy �. dti 1 O f, a N u J O Q u N Al n r ��3 N CD 4ex • — ahoy 9 _ •'i 1 4 7 • , 0 Y U Q m W V) N z O F W J W z � 4 i J 1 o �o w f IP L/1 C 0 Z • 'LO w V M pC3 v - ' a0 y Z N C-c� a o s .� y I �o W 1.1 W lit Lit cWD �o ry FIL O Ln (1^ or ) c T T T T 2 Jr 4 ~ a v\ F- F-- W u 4 9 Y F E a 0 0 c J N a Y 10 g Y U � � i o 2 0 .I� N pW o�y Y Z1 Y 9 2i3a� E E E E 0 0 0 0 N Y C p O; " n s^ v, u Y L. E E 7 O a p ti v C E E E O O O y� C F� y G Y N N T N z � 4 i J 1 o �o w f IP L/1 C 0 Z • 'LO w V M pC3 v - ' a0 y Z N C-c� a o s .� y I �o W 1.1 W lit Lit cWD �o ry FIL O Ln (1^ or ) c T T T T 2 Jr 4 ~ a v\ F- F-- W u 4 9 L-13 CERTIFICATION i 00627 Logs of Soil Boring:. Location or Project Lot 1 of Lot 41, Auditor's Sub #203, Stubbs Bay Rd. Bcrings made by S -P Testing, Inc. Steve Schirmers Date 10-28-87 Classifiction System: AASHO USDA -SCS X Unified ; Other Auger used (check two): Hand X or Power Flight , or Bucket X Depth, Boring number_ 1 Depth, Boring number 2 in feet Surface elevation 978'7 in feet Surface elevation 979'7 0 - 0 - Topsoil dark brown loam Topsoil dark brown loam 0 - 112" 0 - 1-1/2' _ Brown loam Brown loam 2 - 2 - 1-112' _ /'^""l 1'2" - 214" r-mottling Brown 2'4" - 2'8" ��aiolam Brown clay loam - Gray brown loam 3 3 3 -1/2' -mottling 2'8" - 318" 214" - 318" 4 - 4 _ Olive brown clay loam ,_,rey brown sandy loam 3'8" - 4110" olive gray silty loa:., 6 _ 3'8" - 6' 6 _ 4110" 6' _ 7 - 7 - 8 - 8 - End of boring at 6 feet. Standing water table: present at —feet of depth, hours,after boring. Not present in hole X Mottled soil: Observed at 2'4,. . feet of depth. Not present in hole — Comr:<�nts : End of boring at 6 feet. Standing water table: present at feet of depth, hours after boring. Not present in hole X _ Mottled soil: Observed at 3-1/2' feet of depth. Not present in hoie Comments: r L-13 • CI�RTIFICATION / 00627 Logs of Soil Borings • Location or Project Lot l of Lot 41, Auditor's Sub#203, Stubbs Bay Rd. Eorings made by S -P Testing, Inc. Steve Schirmers Date 10-28-87 Classifiction System: AASHO USDA -SCS X Unified i Other Auger used (check two): Hand X or Power , Flight_ _, or Bucket X Depth, Boring number 3 Depth, Boring number 4 in in feet Surface elevation 975.9 feet Surface elevation 974.5 0 - F 1 0 - 3 - 4 - AW 6 - `_ 8 - Topsoil dark brown loam 0 - 1' 2" 1 1 1 - Brown loam L'2" - 2' 2"-mottliric Olive bro%-i clay loan, 20211 - 31211 Olive gray silty loam 3'2" - 3'10" Olive gray loam 3'10" - 6' End of boring at 6 feet. Standing water table: present at feet of depth, hours after boring. Not present in hole X Mottled soil: Observed at 212" feet of depth. Not present in hole Comments: Topsoil dark brown loam 0 - 1'8" • Dark gray brown loam 2 - 118" - 212"-mett11ni Olive brown clay loam 3 - '2" - 3'4" 4 - 5 - 6 - 7 - 8 - Olive brown loam 3'4" - 4'10" Olive brown loam w/traces of 4'10" - 5-1/2' sand HIT ROCK End of boring at 5-1/2' feet. Standing water table: present at feet of depth, hours after boring. Not present in hole X Mottled soil: Observed at 2'2" feet of depth. Not present in hole Comments: L-13 Cs�.TiPiCATiON i 00627' Logs of Soil boringb Location or Project Lot 1 of Lot 41, Auditor's Sub 4203,.9tubbs Bay Rd. Borings made by S -p Testing, Inc. Steve Schirm�-rs Date 10-28-87 Classifiction System: AASHO USDA -SCS X Unified J OthEA Auger used (check two): Hand X or Power , Flight , or Bucket X Depth, Boring number 1 _ Depth, Boring number 2 in feet Surface elevation 97+'7 in feet Surface elevation 979'7 0 - 0 - Topsoii dark brown loam Topsoil dark brown loam 1 - 1 - 0 - 11211 Brown loam Brown loam 2 2 1-1/2' - 2'4" -mottling 112" - 2'4" i Brown 2'4" - 2,8„ "layol2am Brown clay loam - Gray brown loam 3 - 3 3 -1/2' -mottling 2 1 811 _ 3' 811 �J 21411- 3' 8" olive brown clay loam 4 _ 4 _ Gray brown sandy loam 3'8" - 4010" 5 - 5 - olive gray silty loam 6 - 318" _ 6' 6 - 4'10" _ 6' 7 - 7 - 8 - 8 - J End of boring at 6 feet. Standing water table: present at feet of depth, hours -after boring. Not present in hole_ X _ Mottled soil: Observed at 2'4" feet of 1. Not present in hole__ Comments: End of boring at 6 feet. Standing water table: present at feet of depth, _ hours after boring. ..ot present in hole X Mottl�•d soil: Observed at 3-1/2' feet of depth. Not present in hole Comments: CERTIFICATION # 00627 Logs of Soil Borings Location ur Project Lot 1 of Lot 41, Auditor's Sub #203, Stubbs Bay Rd. Borings made by S -P Testing, Inc. Steve Schirmers Date 10-28-87 Classifiction System: AASHO USDA -SCS X ; Unified ; Other Auger used (check two): Hand_X , or Power , Flight , u;:. cket X Depth, Boring number_ 5 Depth, Boring numbcVr 6 in in feet Surface elevation 970.0 feet Surface elevAtion 970'2 - Topsoil dark brown loam Topsoil very dark 0 - 8" 1 brown loam 1 - Brown loam 0 - 2'2" 2 - 2 - 8" - 2' 2 -1/2' -mottling 2'4" -mottling Dark gray brown loam Ol:ve brown loam Dark gray brown clay loam 4 - 4 - 2' - 412" ----312'0 _ 4'8" Rusty olive brown loam 5 _ Gray silty clay loam 5 _ 6 - --- 48 - 6 - 6 - — - --- 402 -- 5'10" 7 - 7 - 8 Fn. of boring at 6' feet. Standing water table: present at feet of depth, hclir,s -after boring. Not present in hole Y Mottled soil: Observed at 2-1/1'feet of depth. Not present in hole Comments: End of boring at 5'20" feet. Standing water table: present at feet of depth, hours after boring. Not present in hole X Mottle, soil: Observed at 2 t .» feet of dF r :h. Not present in hole Comments: r— PERCOLATION TEST DATA SHEET Percolation test readings made by � — P T s i nq . Inc . �,.� 10 — 2 9 — 8 7 starving at 8 :15 ;Mm- iron Test hole location Lo t l , o f Lo t 4 l ,Auditor ' s S ��it* dlh�fr 1 , Date hole was pn paw 10-28-87. Depth of hole bottoms+ 18 inches, Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 — 18" Topsoil dark brown loam Method of scratching sidewalt Knife 2 Depth of gravel in bottom of hole inches Date and hour of initial water filling 10-28-87 .�� ueptn tm ul water filling inches above hole bottom Method used to maintain at least 12 inches of watt • • lr;,th in hole for at least 4 hours _ - Automatic siphon Maximun: water depth above hole bottom during test 6 incbes ~ Percolation Time interval, Measurement, Drop in water ate, Remarks minutes inclies level, inches m!1.40 pe. LA 8:05 prefil1 6 8:15 8:4= " 4 -3/8 6.5 3V m:l.aa 8:57 9 27 4-1/8 -7.3 « « 9 28 9.58 3-7/8 7. 3 PaooWion rare per inch. PERCOLATION TEST DATA SHEET S -P Testing, inc. 10-29-87 8:16 A.M. Percolation test readings made by on v■rting at a",# Test hole locati�t+ Lo t 1 o f L o t4,Auditor ' s S oVn%4iber 2 , Due hole was pre10-28-87 Depth of hole bon 18 inches, Diameter of hole 6 �ncha Soil data from test hole: Depth, inches 0 - 14" 14" - 18" Brown loam Soil texture Method of scratching sidewall Knife 2 Depth of gravel in bottom of hole inches Dau and hour of initial water filling— 10-28-87 De t o?9111 � water filiing 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at leant 4 hrw LAu t oma t ie siphon Maximum water depth above hole bottom during test 6 inches • Time Time interval, minutes Measurement. inches Drop in wwa level, inches Percolation rate, minutes per inch Remarks 8:05 prefil1 6 8:16 8:46 3 10.0 30 min 8:56 9:26 " 2-7/8 10.4 M M 9:29 9:59 " Percolation rate - 10. 3 rain Per inch. PERCOLATION TF—ST DATA SHEET Percolation test madin smadeb S -P Testing. Inc. on 10-2�-R7 a.m. B Y carting at 8 • 1 p. m. Test holelocati�LotlofLot4l,Auditor's Sup&203 ' 10-28-87 number Date hole was prepared Depth of hole bottom 18 inches, Diameter of hole 6 inches ,.t from test hole: Death, inches Soil texture _ 0 - 14" Topsoil Clark brown loan 14" - 18" Brown loam Method of scratching stdewall Knife 2 Depth of gravel to bottom of hole inches 10-28-87 9:0081, 12 Date and hour of initial water filling , DePth dTtmltal water f.11,n , inches above hole bottom — Method used to maintain at least 12 inches of water depth in hole for at least 4 hours_ Automatic siphon 6 Maximum water depth above hole bottom during test inches Time Time interval, minutes Measuremeni, inches Drop in water level, inches Percolation rate, minutes per inch Remarks 8:05 pre fi11 6 8:17 8:47 1-3/8 X1.8 30 min 8:55 9:25 9:30 10:00 lllsookaw ma - 21- e' mien pet iacb. PERCOLATION TEST DATA SHEET Percolation test readings made by S - P Testing, Inc .o„ 10-29-87 „dng d 6:18 a:�11: ut pp Awl Lot 1 o f Test hole locati Lo t 41 , A v c] i t o r ' s il%le number. 4 , Date hole was p mpa� 10-28-87 Depth of hole botto18 inches, Diameter of hole -----6 inches Soil data from test hole: Depth, inches Soil texture 0 - 18" Topsoil dark brown loam Method of scratching sidewall K n i f e 2 Depth of gravel in bottom of hole inches 10-28-87 0 .In. 12 Date and hour of initial water filling , Dep o�initial water filling �nchea above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least a hour& Automatic s i p h o n Maximum water depth above hole bottom during test 6 inches Time Time interval, minutes Measurement, inches Dmp in water level, inches Percolation rate, minutes per inch Remarks 8:05 I prefi11 6 8:18 8:48 3-7/16 8.7 i30 min 8:54 9:24 9:31 10:01 I Percolation rate - 8. 7 minutes per awh. PERCOLATION TEST DATA SHEET —I' Testing, Inc. 10-29-87 8:19 a.m. Percolation tri readings made by 9 on starting at_ p.m. . otlofLot4l,Auditor's Sub 1203 r,aw`i 10-28-87 Test hole h>caaor>__ , Hole number. Date hole was prepa+� Depth of hole bottum. 18 inches, Diameter of hoe 6 inches Soil data from first hole: Depth. inche: Soil texture 0 — 18" '%soil very dark brown loarr. Method of scratching sidcwall Knife 2 Depth of gravel in bottom of hole nehes 10-28-87 4:00p.m. 12 Date and hour of initial water filling _, Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon _ Maximum water depth above hole bottom dunng test 6 inches Time TimePercolation interval, minutes Measurement, Drop in water inches ; level, inches -- -- —� rate. minutes per inch Remarks 8:05 prefill 8:19 8:49 4-13/16 6.2 30 min 8:53 9:23 " — 4-5/8 —� 6.5 " 9:32 10:02 4-3/8 6.9 " t7.5 f wilati011 raft - ...i Hms PW inch. PERCOLATION TEST DATA SHEET , Inc.g Percolation test readings made by S -P Testing, on 10-29-8-7 v,,,ing at 8 : 2 0 p m. 'A a. Test hole locationLotlofLot4l,Auditor's St #203& 6 10-28-87 ole num r , Date hole was prepared Depth of hole bottom 18 inches, Diameter of hole6 inches Soil data from test hole: Depth, inches Soil texture 0 - 8" Topsoil dark brown loam _ 8" - 18" Brown loam Methyl of scratching sidewall K n i f e — 2 Depth of gravel in bottom of holy inches 10-28-87 4: pi) E,.In. 12 j Date and hour of initial water filling , Depth of initial water filling inches above hole bottom iAutomatic siphon Method used to maintain at least I .. inches of water depth in hole for at least 4 hours i Maximum water depth above hole bottom during test 6 _inches Time Time interval, minutes Measurement, inches Drop in water level, inches Percolation rate, minutes per inch Remarks Water reinaininq in test hole 8:20 8:50 6 1-1/8 26.7 30 min 8: 5 2 9: 2 2 " ' 9:33 10:03 " ' 26.7 molal! - minutes per inch. -PERFORATED LATERALS SANDY LOAM SOIL- LAYER OF STRAW OR MARSH HAY COVERED WITH RED ROSIN PAPER PIPE /FROM 2PUMP-21 I ?, CLAN FLOCK �,/ ����•.' ��� DIVERSION FOR Y ,�y�.+,�►►/�� /� J % SURFACE WATER 6" TOP SOIL, 1 SELECT a5 LEVEL a 9TE AS aiaLr. von THEMo:�►A - 7 j 2 REMDVE EXESS VEGETATION Rfl». DISK OR tbNG BACKHOE RAKER TEET K �•'-, gOUC ,1! THE SwgfF SDA 6 INCHES DEEP Do THIS ONLY IF THE MNST(1RE mPITENT 5 LES-5 THAN THE PLASTIC UMIT (SOIL 15 PLASTIC IF IT CAN BE RDI-lfn HTO AN �j NCH WIRE) 00 NOT REMpVE MRI D< THE SURFACE SOIL MOUND ,R-'� , pfgFT)i1MAPKE ON C T 5Q1�� DE �CQQNNS ME CAR£�pT�O�PSRE[ NT__COMPAT;a �•/ 4'i' J% , AND RIDDLING CIFrE [LAY oaaNSRtJC' �W►E TNEIti[+� CO►+51R1K ION EDLIPMEN. AMC DO NOT MOUND N CLAY SOIL IS N A PLASTIC CDIDI TION �5[ ONIY TRAOC TYPE EThIIP+aOIT FOR COdTFtUCTING THE nFDu1a0 SO AS F1()T 1,1y,.'�o• �'" '-�'t J �' �N , �• (i /�.'% TO ODwWACT THE ORIGINAL SOIL p�RC�p I =" "'fir—.,'�•��'- �~ _.� � .: �' ~MAk.j A THERE WIST BE RATE NO SLT T/MN 120 MFEET MIiNUT6 PER NOR a XL �F��STER T1MN S 1 �. MINUTES PER INCA/. BEFORE ftAC G TIE LJ►rFyl OF CLEAN off '' F S TIE 12 INCH LAYER OF CLEAN SMO IS PART OF THE Mjk10 COF6T7RICT� S� h~-t`-- _ -J • _' 15 CONSIDERED CLEAN F IT CAN R56 T►E'i1RlIT iAR TEST RJR mNC SMS Cl�qOPE .. , 6 THE TDP OF TPE CLEAN SAM LAYER AND THE TOP CIF THE IgOt IiD MMT BE `,.•: ODNSTTiUC LEVEL MS SA LEA CII `1 7 DISTRIBUTION PIPES ARE NCH DIAMETER SIMCED AO INCHES 011 CENTER FI I SOD 3`v — '% CONNECTEDWE AND AT ONS DRIRI�LEZ EVERY 36 NNC. CENTERTHE POI�NG DO80 PIWN M E LAYER +_ /{� '}.�►�. ` , EE ANEW DRILL BIT TO AVOID BURRS INSIDE THE PIPE R�kEr� `f _ B MINE INCHES OF ROCK Al`PLACED LINDfR THE PERFORATED LATERALS AMC 2 f� INCHES ABOVE FOR A TC NROCK CK DEPTH Of 12 INCHES UP _ -+ 9 THE ROCKFIRSTCESTRAW WI LAYER OF RED ROSINP&PERL6INCHES AT \RRIT RgL 10 AATOcK ST 6 INCHES OF LOAMY SAND SHOULD BE PLA'ED OVF THE TOP OF THE R LIgYE II A 6-INCH LAYER Of TOP SOIL SHOULD BE PLACED OVER THE EP, (IRE MOUND 50 THAT A WSS COVER CAN BE ESTABLISHED �12 CROWN THE SOIL COVER AT LEAST 6 INCHES IN THE CENTER DF 7HE MOUND ABOVE THE ROCK LAYER SO THAT HE}VY FAIN W.— RUN OFF 13 SIDE SLOPES OF THE DIKES SHOULD BE NO STEEPER THAN • 1 ON CLAY SOLS AND 31 ON SANDY ILS HI 6A.TNIR. DEPEt" ON T; AMOUNT OF DAILY SEUENf 1 5 IMU MAFM EFFLT DOSE PFR PUMP CYCU SHOULD BE N: MORE THE TABLE VALUES • 16 MINIMUM PUMPING RATE IS 5+4OWN IN TABU PUMPING HEAD MUST BE .• ADEQUATE TO t"RCCIME ELEoe',ON DIFFERENCE. FRKT+JN LOSS PLUS 5 rtET FOR PFRFORATFc �ATERRALS 0 E-'. 4 INCHES STRAW OR MARSH SANDY LOAM SOIL HAY AND LAYER OF RED ROSIN PAPER PERFORATED LATERAL GRASS COVER 6 INCHES SAND FILL TOPSOIL MAXIMUM SLOPE -�- !} TO I < _ °/ SLOPE OPS IL __� SUBSOIL PLOWED OR CLEAN ROCK DISKED SURFACE 3/4 TO 21/2 INCHES CROSS SECTION A - A /-- PIPE FROM / PUMPING CHAMBER W PERFORATED ( i LATERALS- 0 I BED AREA W I i I , j w i W i m - � Z � 2 I 20 0' ( 20' :. INCHES#� INCHES _ �- DIKE 10 FEET_DIKE MAX. TOTAL WIDTH PLAN VIEW t, ,E :I LAYOUT OF PERFORATED PIPE LATERALS FOR PRESSURE DISTRIBUTION IN MOUND (I—PERFORATED PLASTIC PIPE111120 n. ) PERFORATIONS SPACED 30" OR 36" END ON CENTER. PERFORATION VIEW SIZ�tAY 8EOR /6l6' PERFORATIONS ON BOTTOM OF PLASTIC PIPE END CAP 1o" �SPACIN6 PERF ORA,I oN MANIFOLD PIPE ?-,'o #,a, PIPE FROM PUMPING CHAMBEP TEE TO TEE LATERAL- MANIFOLD CONSTRUCTION A Topsoi I 4 Loamy Sand Backfill Manifold Grass Cover Hay or Straw Covered by Layer of Red Rosin Paper for nylon fabric) Perforation in Cap Near Crown of Pipe Perforations at Lateral Invert PIGGY BACK PLUG IN WEATHER ALARM WIRt PROOF ENCLOSURE -OR LOCATE MANI+01.E COVER SICUREo FROSTPROOFING THE IN HOUSE BASEMENT DISCHARGE PIPE POWER SUPPLY _�J \ TO PREVENT VNAul.OA,ZED 1 ENTRY mcK LU«u — 74' MANHOLE - ALARM FLOAT ON SEFI✓LRATE ELECTRICAL CIRCUIT RESERVE CAPACITY \ \ AFTER ALARM SOUNDS START LEVEL J_ SHUT-OFF LE VEL .j'._ 12 - IB MINIMLIM DEPTH FWCITY YCA GALLo .,.' PLACE A ROCK ENVELOPE 1.5 AROUND DISCHARGE PIPE 20 ROCK SHOULD BE 3'4 TO 2'/z 2.5 INCHES IN DIAMETER, WITH UNION ON OIHER UICK DISCONNECT PITTING NO SAND COVER WITH A 2 40 INCH THICK SHEET OF 50 EXPANDED POLYSTYRENE TO SOIL WHEREVER POSSIBLE MAIN- 3—TREATMENT TAIN A GRASS COVER OVER AREA TOP OF TRENCH AND ALLOW 4' WEEPHOLE FOR SNOW TO REMAIN IN PLACE P vl4 vE MA. ,K, -- Ch CHE CHEC WHEN SNOW COVER IS LIGHT, BE INSTALLED IF PLACE A 6 INCH HAY OR PIPE TO TREATMENT 200 AREA IS FRCST STRAW LAYER ON GROUND 31 TO 45 ABOVE PIPE PUMPING RATE SHOULD NOT EXCEED DROP BOX OUTFLOW CAPACITY OR 45 GALLONS PER MINUTE (2700 GALLONS PER HOUR) PUMP DISCHARGE HEAD MUST BE ADEQUATE TO OVERCOME ELEVATION DIFFERENCE BETWEEN THE PIMP AND DISTRIBUTION BOX PLUS FRICTION LOSS IN DISCHARGE PIPE. LIQUID CAPACITIES OF VERTICAL CIRCULAR TANKS INSIDE DIAMETER OF TANK IN FEET GALLONS PER FOOT OF DEPTH 1.5 130 20 235 2.5 370 30 530 40 940 50 1470 60 213.0 FOR EXAMPLE. A CIRCULAR TANK WITH AN INSIDE DIAMETER OF 4 FEET HAS 94 GALLONS OF LIQUID CAPACITY PER FOOT OF DEPTH TO PUMP 200 GALLONS PER CYCLE. TME PUMP CONTROL SWITCHES WOULD NEED TO BE SET 21 FEET APART BACKFILL EXPANDED -- POLYSTYRENE DISCHARGE PIPE -- e ROCK 3/4' 2'/2* DIA TO DETERMINE THE LIQUID CA,IACITY OF ANY TANK, FIRST DETERMINE THE SURFACE AREA OF THE LIQUID MULTIPLY THIS VALUE BY 75 (GALLONS PER CUBIC FOOT) TO DETER- MINE THE TANK LIQUID CAPACITY IN GALLONS PER FOOT OF DEPTH. .D4R�.OPP._ Box - "KtX T2 SOIL CUVER Pl �- ' 3i,' - 2'i= DIA HOCK FROM PUMP - DRAIN TILE OR 81610 PERFORATED PLASTIC ►1/E S MIN FROM BOTTOM OF TFIENCH TO WATER TABLE OR CLAY OR IMCK -:z--L LAYER SOIL TREATMENT AREAS FOR TYPE Z HOMES* REQUIRED SOIL TREA'MENT AREA IN SQUARE FEET PER BEDROOM PERCOLATION RATE IN TRENCHES MINUTES PER ppEE BELOW INCH BEDS OIS7RIBUTION PIIPE. IN INCHES 6 12 1 IS 1 24 FASTER THAN 0.1of TO 5 12S 125 100 BS 75 6 TO 15 190 190 150 125 115 16 TO 30 250 250 200 165 150 31 TO 45 300 300 240 200 IAO 46 TO 60 330 330 265 220 200 SLOWER THAN 60b ° SF_WAGE FLOW - 150 GPO PER BEDROOM bSPECIAL DESIGN SHOULD K USED TO PROVIDf r.CEG GT( TREATMENT AND ABSORPTION OF EFFLUENT RECOMMENDED AMOUNI OF EFFLUENT TO PUMP PER CYCLE IS 25 PERCENT OF DAILY SEWAGE FLOW MINIMUM AMOUNT OF EFFLUENT TO PUMP PER CYCLE IS 75 GALLONS 1 0 . - ' PUMPING bTATION IBY4"M--- I IMETAL COVER ..*,at CONCRETE MANHOLE RING METHODS OF SECURING MANHOLE COVER TO PREVENT i UNAUTHORIZED ENTRY i PENCIL MARKS 6" MANHOLE INLET._ _ t , �= SCUM �' OUTLET • • ';OUTLET LEVEL - SCUM CLEAR SPACE CLEAN OUT TANK WHEN IS 3" OR LESS OR B "8" IS 12" OR LESS BLACK COLOR • SLUDGE DISTINGUISHES SLUDGE LAYER FROM LIOUID MEASURE SCUM AND SLUDGE ACCUMULATIONS IN THE SEPTIC TANK