HomeMy WebLinkAbout1988-12-06 Septic System ApprovalINS P Corr
CITY OF ORONO
SEPTIC SYSTEM APPROVAL
Permit
Fee $
Entered syr
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub -contractors. Septic system
design is not considered as approved unless this sheet is attached.
LOCATION: 3 970: CM 2 I LVIj E De 1 Y E c q —/ 2 C&$
6REZRAL CONTRACTOR: 6. A . CA -a L. s o ,,,j
SEPTIC CONTRANPOR:
OWNER, _ U -)1. L 1. &J
❑ APPROVED
CONDITIONALLY APPROVED: Note Changes Below
140 C Y -2
,Is7-
PROSE: yy �, 3(o
.A
CA:)��
L �fl
WOTICE TO INSTALLERS: Any changes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
Z"ICE TO C RAL CONTl71CTORS: Drainfield sites must be protected prior to
and after system installation to avoid compaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
..........
`� J1
Data Approved By