Loading...
HomeMy WebLinkAbout1987-10-10 Septic System Design SpecificationsS.P TESTING, INC. 961 KATYDID LANE ST. MICHAEL, MN 55376 497.3566 STEVE SHIRMERS November 10, 1987 Tom Betz Lot 3 of lot 41 Auditor's Sub #203 Stubbs Bay Road Orono, Henn. Co., MN This system is designed for a Type 1, four bedroom home and in accordance with the Minnesota Pollution Control Agency standards WPC 40 and local ordinances. The soils on this site are typical of SCS soils mapped - :.+B - LeSueur loam. A seasonally high water table was located at 16", 20", 22", 26", 5 280, (mottling). Due to the seasonally high water table, a pre3surized mound system will need to be installed. The bottom of the rock Iced must be lo- cated at least 3' above the seasonally high water table. The soils at a depth of 1B" have rzr^olation La`e aver%ying 6.1 min/inch and are adequate for treating septic effi.-jnt. A pumping chamber will need to be i.1stalled to lift the: `fluent to tt..? treatment area. The manifold and supply line pipe must ha -v:- uac:K drainage to the pumping chamber. The distribution pipes shall hav,s their ends capped. Be sure the rock and sand fill material are c ea,-. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this is in case of a pump failure. (Mercury floats are a good method). All neighboring wells are located more than 100' away from the proposed treatment area. Keep all heavy equipment off of the proposed treatment area before and after construction as much as possible. The treatment area should be marked off before construction. With proper installation and maintenance, this system should have no problem.in treating septic effluent effectively. It is recommended that the septic tanks be pumped evr-r7 2 years. Soil and PercoMtiow To.a��_ 1�iL� �_ _ Septic System D filln Steven B. Schirmers SBS/ds I 1 e a sv - 4 r 0 ooua � t 1 who • � y A� ¢ 0 N O r O � L < fDi 1 40 O W4 W41 F to Y r cc � � � x O < 1 40 W W4 W41 F to Y r cc � Q I • O �� + Y J1 Jt O 0 O `CI CITY of ORONO Yost ')ffice Box 66 • Crystal Bay, Minnesota 55323 • Municipal Offices On the North Shore of Lake Minnetonka March 1988 SEPTIC SYSTM INSTALLATIONS - CONSTRUCTION i INSPECTION MVIRRIGMTS A. All installations shall comply with the approves septic system design (the report you work from should contain the City's signed and dated approval cover sheet, which will note any required changes). _ B. A11 inspections must be cal led -in at least 24 hours in advance to ensure timely i ctiona (473-7357). The following inspections are required: rl. Pre -installation site inspection (any time prior to installation; purpose is to rify proposed system location and layout). 2�. Tank inspection (prior to covering). 3. Standard trench drainfield inspection (at least 751 complete but prior to covering). ( 4. )lotted - Inspections ( 2 required) : ' After ground is roughed -up, but prior to sand placement. When rock and piping are in place, but prior to covering. �inal inspection a. When final grading is complete. b. Pump station function final inspection. C. Special requirements for poW station inspection: Pump stations have become an increasing problem due to a wide range of installation and electrical connection methods, and due to varying per ,tions of who is responsible for various portions of the installation (incl iq bui ling inspectors, electrical inspectors, system installers, electricians,c eneral contractors). The following procedure and policy is immediately placed in effect. - a. The septic installer shall be responsib. a for ensuring that all electrical connections conform exactly to the diagram snown on the back of this sheet (90 EQCXPTIO�S) . b. Septic installer shall call City for final pump station inspection when the pump, floats, electrical connections, and alarm system are complete and working. The alarm system will be tested, as will the pump on-off levels to ensure proper gallonage per cycle. C. Installer shall provide pump make and model number and a copy of the Pus:t: Characteristic Curve to the inspector for filing in permanent City records. d. Certificates of Occupancy for new residences will not be issued until the above is completed. Any questions? Contact Lyle Oman or Mike Gatfron at 473-7357. BUILDING& ZONING - 473.7357 • ADMINISTRATION A FINA':sE - 4/.:'358 • PUBLIC WORKS - 473-7359 ASSESSING WATER TIGHT a LOCKABLE ELECTRIC BOX PLUGS OR ELECTRIC CONNECTIONS 2" PVC CONDUIT SCHEDULE 80 6" SPACE MANHOLE COVER CHAINED a LOCKED- --- SEALED MANHOLE R I NGS TREATEDPOST 4O4min) ALL ELECTRIC CONNECTIONS MADE INSIDE BOX LOOP OF POWER CORD FOR �r I '/ LLSETTLEMENT SII Q FINAL StA L Wins S Ar*' 8CX VXXy w tru Pu -7y � UNION AT LEAST 12" rl-NYM BELOW GRADE Wl RE FROM POWER SUPPLY _ PIPE IS LAID ON A UNIFORM SLOPE FROM PUMP STATION UP TO SOIL TREATMENT AREA FOR PROPER DRAINBACK SEALED TANK COVER IF PIPE AT TANK MUST BE LOWER THAN UNION TO GET ELEVATION FOR DRAINBACK, PLASTIC ROPE OR CHAIN A 1/4 INCH WEEP HOLE MUST BE USED WITH ANCHOR WEEP HOLE ALARM FLOAT ON SEPARATE ELECTRICAL CIRCUIT NOTES ELECTRICAL WIRE FROM POWER SUPPLY --5!AFU MUST NOT RUN OVER ANY TANKS BUT MUST BE LAID BESIDE OTHER TANKS AND MUST BE PLACED IN CONDUIT ALONG POST SHUN gf-F—LE EL.. -9 _ ELECTRICAL CORDS FROM PUMP AND n FLOATS MUST BE RUN THROUGH CONDUIT. WIRES CANNOT HAVE GROUND PUMP CONTROL FLOAT CONTACT. J00 March 4, 1988 March 4. 1988 REDWOOD, CED OR . WATER TIGHT a LOCKABLE ELECTRIC BOX TREATED PO T14 x 4 mIn) PLUGS OR ELECTRIC* CONNECTIONS ----- BALL ELECTRIC CONNECTIONS MADE 2" PVC CONDUIT SCHEDULE 80 6"SPACE INSIDE BOX 5tAt_ WIitES LOOP OF POWER CORD FOR MANHOLE COVER CHAINED 81 LOCKED k-- -�-- SETTLEMENT SEALED MANHOLE RINGS w tom. FINAL GRADE AT LEAST 12" ' BELOW GRADE UNION i WIRE FROM POWER SUPPLY ' PIPE IS LAID ON A UNIFORM SLOPE FROM IL TREATMENT AREA _ FOR PROPER DRAINBACK SEALED TANK COVER �-- IF PIPE AT TANK MUST EE LOWER THAN UNION TO GET ELEVATION FOR DRAINBACK, PLASTIC ROPE OR CHAIN A 1/4 INCH WEEP HOLE MUST BE USED WITH ANCHOR WEEP HOLE ALARM FLOAT ON SEPARATE ELECTRICAL CIRCUIT �-- NOTES: ELECTRICAL WIRE FROM POWER SUPPLY STAFff-yE�� MUST NOT RUN OVER ANY TANKS BUT �� _ MUST BE LAID BESIDE OTHER TANKS AND MUST BE PLXED IN CONDUIT ALONG POST SHUJ-- 4EF-L�� — - ELECTRICAL CORDS FROM PUMP AND FLOATS MUST BE RUN THROUGH WIRES CANNOT HAVE GROUND PUMF CONTROL FLOAT CONTACT J00 March 4. 1988 L-13 CERTIFICATION 1 00627 Logs of Soil Borings �. Location or Project Lot 3 of lot 41 Auditor's Sub #203 Borings made by S -P Testing, Inc. Steve Schirmers Date 11-5-87 Classifiction System: AASHU ; USDA -SCS X ; Unified ; Other Auger used (check two): Hand X , or Power , Flight , or Bucket X Depth, Boring number 1 Depth, Boring number 2 in in feet Surface elevation 961.3 feet Surface elevation 958.8 0 - I 0 - Topsoil -dark brown loam 0 - 1' 1 - Lark 1, - 1'4"-g5jy13R$wn 1 a 1 - 2 - I Gray silty clay loam 3 - 144" - 312" Rusty gray loam 4- 3,2" - 4'8" Rusty gray loam w/traces 5 _ 418" - 5' of sand Rusty olive gray loam 6 - 50 - 6' 7 - End of boring at _ feet. Standing water table: preser, at 4-1/21 fee, of depth. 21 urs -after boring. Not press— in hole Mott:. _'; z^-.1: Observed at 114" feet of depth. Not present in hole Comments: 2 - Z 5 - 6 - 7 - Topsoil very dark brown loam 0 - 1-1/2' Dark gray brown loam 2'4" -mottling 1-1/2' - 2'10" Gray brown clay loam 2010" - 4'8" Gray loamy sand 4' 8" - 6' End of boring at 6 _ feet. Starding water table: present at-- feet of depth, hours after boring. Not present in hole K Muttled soil - Observed at 2'4" fees of depth. Not present in hole Comments: L-13 CERTIFICATION M 0OC27 Logs of Soil Borings Location or Project_ Lot 3 of lot 41, Auditor's Sub ii203 Borings made by S -P Testi+ na,_Inc. Steve Schirmers Date 11-5-87 Classifiction System. AASHU ; 9SDA-SCS X ; Vnif+ed Other Auger used (check two): Hand X , or Power`_, Flight , or Bucket X Depth, Boring number 5 Depth, Bori,ig number_ 6 in 957.7 in 960.2 feet Surface elevation feet Surface elevation 0 - 0 - - Topsoil very dark brown loam 1 - 0 - 1'4" Dark brown loam 2 - 2'2" -mottling 11400 - 21 411 11 Cray brown 2'4" - 2'10"c I 3 Gray brown clay loam 2'1,-,"-- 3110" 4 Rusty gray silty clay loam 5 - :-: 7 - 8 - 3'10" - 4'10" Gray silty loam 4'10" ­ 5-1/2' Rusty gray loam 5-1/2' - 6' End of Loring aL 6 feet. Standing water table: present at__ feet of dope- hours after boriag. Not present in hole X Mottled soil: Observed b•: 2'"" ' feet of depth. Not present in hole Cos ntss Topsoil very dark brown 0 - 10" loam Dark brown loam 10" - 1110" Brown1'10" - 21•.�'loamottling Gray brown clay loam 2'2" - 3110" Rus'y olive gray loam 3'10 t' End of boring at 6 *_. Standing water table: pt. .vnt at_, fee, )f depth, t,. .irs after boring. Not 7resent hole X Nottle Coll: Obsei. at i1,2" feet. o.- ole; +.h. Not p t .•.-e hole Comments. L-13 CERTIFICATION M 00627 Logs of Scil Borings Location or Project Lot 3 of lot 11, Auditor' :ib #203 Borings made by__S-P Testing, Inc. SteveSch;r.'La Date 11-5-87 Classifiction System: AASH)__; USDA -SCS X unified Other _ Auger used (check two): Hand X , or Power , Flight , or Bucket X Depth, Boring number 3 Depth, Boring number 4 in in feet Surface elevation 957.2 feet Surface elevation 955.3 0 - N i0 - i— Z End of boring at 6 feet. Standing water table: present at 5140 of depth, 21 hours al.er boring. Not present in hole Mottled soil: Observed at 1'8" feet of depth. Not present in hale Comments: 7 - 8 - End of boring at 6 feet. Standing water table: present at 4-1/2 feet of depth, 21 hours after '-3ring. Not preF-�;nt in hole Nottled soyi; Observed at 1'10" feet c depth. Not present in hole Comments: Topsoil very dark brown Topsoil very dark 1 - loam 0 - 1'4" 1 - gray loan 118" -mottling 1'10"-mottlin! 2 - Very dark gray brown loam .. 2 - 0 2' Dark gray i:jam 1.14" - 2'8" 2' - 2'8" 2 -1/2' -mottling strong 3 - 3 - Very dark gray clay loam 2'8" - 3'10" 218" 308" Gray silty loam 4 4 Gray silty loam 3'10" -.4'10" 5 - 5 - Rusty gray loam 6 - 4'10" - 6' 6 - 3 # 801 - 6 Z End of boring at 6 feet. Standing water table: present at 5140 of depth, 21 hours al.er boring. Not present in hole Mottled soil: Observed at 1'8" feet of depth. Not present in hale Comments: 7 - 8 - End of boring at 6 feet. Standing water table: present at 4-1/2 feet of depth, 21 hours after '-3ring. Not preF-�;nt in hole Nottled soyi; Observed at 1'10" feet c depth. Not present in hole Comments: PERCOLATION TEST DATA SHEET S—P Testing, Inc. 11-6-87 10:54 'C=--- Percolation test readings made by 4+" ta,wi parting at p.m. Lot3oflot41,Auditor's Sub #203 1 11-5-87 Test hole locatio" , Hole number Date hole was prepared Depth of hole boautn 18 —inches. Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil textutc 0 — 12" Topsoil dark brown loam 12" — 16" Dark gray brown loam 16" — 18" Gray silty clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 11-5-87 2:OOp.m. 12 Date and hour of initial water filling , Depth of initial water tilling inches above hole twuom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours A u t oma t i c --Z." hon , Maximum water depth above hole bottom during tc%l 6 m%hes Time 10:44 Time interval. minutes prefill Measuremeat, inches 6 Drop in water level, inches Percolation — rate, minutes per inch Remark% 10:54 11:09 2-1/4 6.7 15 min 11:20 11:35 " 2-1/8 7.1 " 11:36 11:51 " Ferwimm raw - 7 • 0 m.auwb per inch. PERCOLATION TEST DATA SHEET a.n ' Percolation test readings made by S - P Testing, Inc. urL-1 l - 6 - 8 7_stining at 10:551--c p, m. 3 Test hok location Lot3of 1ot41 ,Auditor's Sole number numl hole was prepared 11-5-87 Depth of hole button, 18 inches, Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 - 18" Topsoil very dark brown loam Method of scratching sidewall Knife 2 Depth of gravel in bultom of hole— inches 11-5-87 2:00p,m, 12 Date and hour of initial water filling Depth Of initial water filling - inches above hole txmoni Method used to maintain at least 12 inches of water depth in hole for at least a hours Automatic siphon _ 6 Maximum water depth atxwe hole txmum dunng tc,t__—. _ _ _—__inche, Tinto Time interval, minutes Measurcincm. inches Drop in water level, inches Percolation --� - - - -------- rate, Remarks minute, per _ 10:44 pref ill 6 _inch 4.5 , 15 min 10:55 11:10 of 3-3/8 11:19 11:34 3-1/8 4.8 " 11:37 11:52 " 3-1/16 4.9 " 4 • 7 Pacinlm rate s i aunutc> per Inch. M 1•. PERCOLATION TEST DATA SHEET Percolation test readings made by S–Y Testing. Inc. on 11–b–ti / starting at to : 5b P. Test hole IocatiunLOt Sof 1Ot41 ,Auditor's Sukollgttin r J Date hole was prepared 11-5-87 Depth of hole buttum 1 —Binches, Diameter of hule 6 inches Soil data true► test hole. Depth, inches suil tc+tture 0 – 16" Topsoil verf_smrl; brown 16" – 18" Very dark gray brown loam Method ut scratching sidewall Knife _ 2 Depth of gravel to buttum of hole —inches 11-5-872,00 in. 12 Date and hour of initial water filling . Depth df inUt d water filling orches atxrvc hole boo n► Method used to maintain at least 12 inches of water depth in hole fut at least 3 hours Automatic siphon 6 Maximum water depth above hole Nmum dui ung trst_____ _------uu hr. Time Time �— interval, minutes Measurentcnt, inches Drop in water level, inches Percolation rac, nrtnntes per inch Remarks 10:44 pre fi11 6 10:56 11:11 " 1-3/4 8.6 15 min 11:18 11:33 " 11:38 11:53 Percolation rate = E - 6 minutes per inch PERCOLATION TEST DATA SHEET S -P Testing, Inc. 11-6-87 10:570=li►-t Percolation test readings niade by on starting at p m. Test hole location Lot Sof 1ot41 ,Auditor's SHI t�unib�r 4 Date hole was prepared 11-5-87 DILpth of hole buttuni 18 inches, Diameter of hole 6 inches Soil dale from test hole: Depth, inches Soil texture 1 •• • •. • •.II Method of scratching side wall Knife 2 Depth of gravel in bottutn of hole inches 11-5-87�U m. 12 Date and hour of in:ual water filling— p imual water filling— —inches above hole himom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours— Automatic siphon 6 Maximum water depth above hole button during test___.—ui.ltcs Time Time interval, minutes Measurenxnt, inches Drop in water level, inches Percolation rate, minutes per inch Remarks 10:44 prefil1 6 10:57 11:12 113-1/16 4.9 15 min 11:17 11:32 2-15/16 5.1 " 11:39 11:54 " Perculation rite - 5. 0 minutes per inch. PERCOLATION TEST DATA SHEET Percolation test readings made by S - P Testing, Inc. on 11-6-87 staring at 10 : 5 8 a.m. Lot3oflot41,Auditor's Sub #203 5 11-5-87 Test hole lucatiu" - ole number Date hole was prepared Depth of hole bottom 18 inches, Diameter of holes 6 inches Soil data from test holt: Depth, inches Soil texture 0 - 16" Topsoil very dark brown loam 16" - 18" Dark brown loara Method of scratching stdewall Knife 2 Depth of gravel in bottom of hole— inches 11-5-97 2:OOp.m. 12 Date and hour of initial water filling , Depth of initial water filling inches aho%c little h,stlom Method use0 to maintain at (cast 12 inches of water depth to hole for at leaf J hours_Automatic siphon 6 . Maximum water depth above hole bottom during test—u►che. Time Time interval, minutes Measurement, inches Drop to water level, inches lirculattun rate. mtnule% per itch 5.5 Remark% 15 min 10:44 Prefill 6 10:58 11:13 of 2-3/4 If Percolsuon rate - 5.6 minutes per inch. M ■: PERCOLATION TEST DATA SHEET S -P Testing, Inc. a.m. Percolation test readings male by on 1 1- 6 - 8 7 wing ai 10:5 9 P.M. 33 ru. Test hole locationLot3oflotill,Auditor's Suholenum'm 6 , Date hole was prepared 11-5-87 Depth of hole bottom -1 8 inches, Diameter of hole—6 inches Soil data from test hole. Depth, inches Soil texture 0 - 10" Topsoil very dark brown loam 10" - 18" Dark brown loam Method of scratching sidewall Knife 2 Depth of gravel in bottom of hole inches 11-5-87 2:OOp.m. 12 Date and hour of initial water fi:,mg , Depth of initial water filling— inches above hole butioni Method used to maintain at Team 12 inches of water depth in hole for at le:ut 4 hours Au toms t is s i p h o n 6 Maximum water depth above hole bottom during to%t_ —inches 'rime 10:44 Time interval, minutes pre fi11 Measurement, inches 6 Drop in water level, inches Percolation - — We, Remarks minutes per inch —� i 10:59 11:14 I 2-11/16 5.6 15 min 11:15 11:30 11:41 11:56 M Percolauua rate = _ 5.6 ry+inutes per titch. -PERFORATED - LATERALS SANDY LOAM SO I L LAYER OF STRAW OR MARSH HAY COVERED •,�-,�' WITH REO ROSIN PAPER PIPE PUMP fir 3j•_2�j • .�_., CLEAN DOCK •''',. ��� ,+):,y�%' : / �� DIVERSION FOR • - /� NOTE`' SURFACE WATER 60 TOPSOIL •. % ' ; : . I SELECT AS LEVEL A !TE AS P095111ILE FOR THE WOUND 2 REJAWE EXCESS vE�TATION. FLAY OF3Hc YLIw0[ TtFM J • , / jM ROUGHEN TIE SUF011� TOIL s NOES 00 TTS pp11����� i TK M01�TURE OONTENT 15 LESS THAN THE PLASTIC LIMIT W& FS PLAdTIC i 1T CAN E ROLLED •: we �i j MTO AN ''�L MCN wSK) 000 NOT REI�AOYI 0� T►W�Fm'w'p PEIVORMAKK 004 CLAY SOIL EDu1PNEXT� i[yTa0�5��M011 w ��""� `r� ,i" /� �� ''• ' vG: M A PLASTTIICC C%T OF0 7�ir;'tri� • �I`�J '' I \ iC 3T T►E <larpmety 1 :OR OOF6rIhJCTNG THE WOUND SO AS NOT M 1 ,� 4. 71ERF MIST AT z f��T Or IM OR FYl_ 9QIL ►IMnM6 A 1A- . '�.�� ''-� J•J• ��• 1 TION R♦TE N� I?'O wINW IFIC11 ry FA /! 1 TMw S MINUTES PER PC". PPLACIM T1E�OF CLEAN f.FO / • ✓0 SLop 4. '; • s THE a INCm LAPpH OF CLiAN SAND IS P29T OF THE �p ► -� ' •' a ` IS CONSIDERED CLEAN IF IT CAN PA44 THE IITRnT JM1� TIST lIYO 4 `C TSP E,ul y�ro urrR ,wo THE TOP a T» ROCK Eim FIesT EIE NO .r✓� 7 DISTRIBUTION PIPES ARE hMCH DIAMETE'N PNcnFS ON CENTER FI S O1 6 —��\ '.. {' CONNECTED TO A MANI/�L.D M THE aj( ER OF T.ff BED PIPES ►VIE �• r INCH PERFORATIONS DRILLED EVERT 36 INCHES AND POINTIFK DDY�Ra - •`...' A NEW DRILL SIT TO / OiD B )FMS INSIDE THE PIPE R�kEr� YER e NNCCHE'S�AHES E FMR A ETOTALPLACED NOCK OOVT' EN THE 1 iWHIMNISTEo LATERALS AND z Up 9 THE ROCK R FIRST COVERED ED SLA NV OF IMP STRAW WHICH 6SE�. . • . COVERED WITH ♦ LAYER OF RED ROSIN PAPER 6 INCHES AT THE BAR%T`JRA .. 10 AT LEAST 6 04CHIM OF LOAMY SAND SHOULD K PLACES OVER THE TDP OF rm[ R I ROICIt KD I A 6 -INCH LAYER OF TOP SOIL SHOULD K PLACED OVER THE ENTIRE MOUND SO LAYE�T1MT A CNA% COVER CAN K ESTAGUSHED )2 CROWN THE SOIL COVER AT LEAST 6 RNCHO M THE CENTER Of THE MOUND ABOVE THE ROCK LAYER SO THAT NEWT RAIN WILL RUN OFF 13 SIDE SLOPES OF THE DIKES SHOULD K NO STEEPER THAN • 1 ON CLAr SOILS AND 31 ON SANDY SOILS N I.M68, OEPIENIM ON THE AMOUNT OF ONLY Y f) 15 MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SMLULO K NO MAM THE TABLE VALUES 16 MINIMUM PUMPING 01111471 IS U40MN M TABLE PIMPING HERO MUST K AOEOU♦'.E TO €E ELEv♦TION OKFERENCE. FRICTION I= PLUG S FEET FOR PERFORATED LA EFALS PERFORATED - �,�_.� LATERALS SANDY LOAM SOIL LAYER OF STRAW OR - MARSH MAY COVERED , ' WITH RED ROSIN PAPER �.' = / / -_ r OR PIPE �'R& p CLEAN DOCK DIVERSION FOR 6" TOPSOIL • •1 I SELECT j r N0'' SURFACE WATER - _ •. AS LEVEL A VIE AS POSSE FOR T►E MOUND ,s' ,•' , 2 REMOVE EXCESS VEITTAT . PILOIK DESK OR �w MW Wp1 T( X "wG EM T►1E S41�C[ IOIL 6 ND4ES OED QQ_TrNS OKl i TIE MgISTURE COMTLINT K 1E55 T►MM THE PLASTK IN a0ti IS PLASTIC i IT CAN BE ROLLED • ► ' / INTO yr Iti r1CrI wrEl. DO NOT !1/1FACE ,� ' •I: / ,'� COJiDRM0ML1I c ►ECA1�iR1Rp M' �`•,�.� • .. / t' ,//• N A RASTIc C01OIDO NOT TWIN /DR CONSTRUCT" THE IIOUIO 10 AS NOT �'�. 911 � •:C • 10 QCT TSE IiOI�L,T � � /� M� �• 1 .: • TIOiNERA TN� AT T1YM 120 � �I &XLNO lfr%U pa"s 'V(���5. ( 11 rf l%,► MINUTES PER INC11�� PLACIWQ T1E�D< CLEAN SAND S THE 12 IDE LATER OF �FiN Sit UA) K PUR OF TIE AOIRO D�ATA3FT10 _f�1O �. � :. �!- � � K CONSIDERED GLEAM t IT Wi I�S6 THE'FTRIIT ,NII_ TL1T IOP ODwCRE'It 7wMi SAND CLE /� OpE '' ; . !S' l TIE TOP 0� 7 H _ CF�N SAM 1AM01 AMC THE TOP OF THE IbOt �D N1RT 4 n1 >„ r �� •' z ... DOMST1k1CTED IEvEL D BE %; ` ,►y 7 DISTRIBUTION PIPES ARE I'//�� NUN DIAMETER SPOM 40 INCHES ON �/� N FI SO `� `�6'—� \• • a NO CONNECTED TO A MANUOLD N THE CENTER OF THE ROCK BED. PIPES MWE D�( A �`p Jam• .: " '.. r 'INCH PERFORATION• DRILLED EVERY 36 INC HS AND POINTING OOW900AND 8X0' `EPA YE►T - � � ``- •'�•�•.B NINE NEW DRILL OF Roca T�ORE.rPOLwACB�URRSp[Hal 'T*IE PIPE. .Eo LATERALS AND : UP ` •'' INCHES ABOVE FOR A TOTAL ROCK OfPTFI OF 12 nKH m p� N� `. a••.• ! THE COVERED WITH 1A LAYEERR OF RED ROSIN PAAPPEYER R MAY 6 INCHES STRAW AT THE SEAMS. i�IJR/I . a ' • 10 AT L ISS D CH 6 INCHES OF Lowy SAND SHOULD BE PLACED OVER THE TOP OF THE ROCK I A (rIhCN LAYER OF TOP SOIL BE OAR THE ENTIRE MOUND ER �AyE�12 CROWN THE SOIL �C9VE�AT�LEAASTT ABUSHED 6D INCHES NE THE CENTER MOUNDS i ABOVE THE ROCX LAYER SO THAT HEAWN RAIN WILL RUN OFF 13 SIDE SLOPES OF THE OIHtES SHCIuLD BE NO STEEPER THAN 6-1 ON CLO SOILS AND 3 I ON SANDY SOILS N LAMR. DEPENDS ON M /IMOMMT OP (WLT S£ f 1 IS MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NO MORE THE TANA VALUES 16 MINIMUM PUMPING RATE IS SHOWN N TABLE RJMPING HEAD MUST K ADEQUATE TO OvE p ELEVATION DIFFERENCE. FRICTION LOSS PLUS S PST FOR PERFORATED LATERALS LAYOUT OF PERFORATED PIPE LATERALS FOR PRESSURE DISTRIBUTION IN MOUND PERFORATED PLASTIC PIPEIif':i11P. ) PERFORATIONS SPACED 30" OR 36" ON CENTER. PERFORATIONEND \ VIEW SIZ AY 8E ;i, '; '�3�: 16' OR i4 PERFORATIONS ON BOTTOM OF PLASTIC PIPE m END CAP 4Q, froN SPA��N� �rRf4RA MANIFOLD PIPE =4 PIPE FROM PUMPING CHAMBER a 4 INCHES STRAW OR MARSH HAY AND LAYER OF RED ROSIN PAPER GRASS COVER SAND FILL--,, -St NDY LOAM SOIL r-- PERFORATED LATERAL 6 INCHES TOPSOIL MAXIMUM SLOPE -� J.\� 4 TO I °/ SLOPE T TOPSOIL -, SUBSOIL PLOWED OR CLEAN ROCK DISKED SURFACE 3/4 TO 2'/Z INCHES CROSS SECTION A - A -- PIPE FROM PUMPING CHAMBER TIT / PERFORATED LATERALS I ' BED AREA ----� w , � J I , , w_ A i Ln w; w' I m A U , 11 Z 20 '0 0 20 INCHES` Iq INCHES � 10 FEET_DIKE D I K EMA X. -- - TOTAL W 10 T H -- - -- PLAN VIEW TEE TO TEE LATERAL- MANIFOLD CONSTRUCTION Topsoi I Loamy Sand Bockf i l l r Gross Cover Hay or Straw Covered . by Layer of Red Rosin Paper (or nylon fabric) Perforation in Cap Near Crown of Pipe zc Tee 4 — Perforations at Lateral Reducer Manifold Invert 4� < Tee Focl,, Layer 12 - I nch Layer of Clean Sand PIGCr BACK PLUG IN WEATHER PROOF ENCLOSUPE-OR LOC►TE IN HOUSE BASEMENT ''OWER SUPPLY CONTROL WIRE PUMP POWER CORO = 214' MANHC LE -ALARM WIRE FROSTPROOFING THE �MANHOLE CODER SECURED . TO PREVENT UNAUTHORIZED pISCHAk�,E PIPE ELECCTRRF ELECTRICAL CIRCUITT RESERVE CAPACITY \\ AFTER ALARM SOUNDS START LEtf j S _ _ L _ 3• ) — _SHUT-OFF LEVEL 12'-18• MINIMUM DEPTH l 0 ,. PLACE A ROCK ENVELOPE IN FEET AROUND DISCHARGE PIPE 1 5 ROCK SHOULD BE 3'4 TO 2 Vz 2 0 INCHES IN DIAMETER, WITH UNION OR OTHER NO SAND. COVIN WITH A 2 UICK DISCONNECT 530 ITTING INCH THICK SHEET OF 50 EXPANDED POLYSTYRENE 60 WHEREVER POSSIBLE MAIN - TO SOIL 3-f TREATMENT TAIN A GRASS COVER OVER AREA TOP OF TRENCH AND ALLOW •' WEEPHOLE FOR SNOW TO REMAIN IN PLACE DAAINB — VALVE CHEfr VALVEE MAY WHEN SNOW COVER IS LIGHT, BE INSTALLED IF PLACE A 6 INCH HAY OR PIPE TO TREATMENT AREA FRCTT STRAW LAYER ON GROUND PROOF ABOVE PIPE PUMPING RATE SHOULD NOT EXCEED DROP BOX OUTFLOW CAPACITY OR 45 GALLONS PER MINUTE (2700 GALLONS PER HOUR) PUMP DISCHARGE HEAD MUST BE ADEr)UATE TO OVERCOME ELEVATION DIFFERENCE BE WEEN THE PUMP AND DISTRIBUTION BOX PLUS FRICTION LOSS IN DISCHARGE PIPE LIQUID CAPACITIES OF VERTICAL C114CULAR TANKS INSIDE DIAMETER OF TANK GALLONS PER FOOT IN FEET OF DEPTH 1 5 13.0 2 0 235 2.5 370 30 530 40 940 50 1470 60 213.0 FOR EXAMPLE, A CIP!CULAR TANK WITH AN INSIDE DIAMETER OF 4 FEET HAS 94 GALLONS OF LIQUID CAPACITY PER FOOT OF DEPTH TO PUMP 200 GALLONS PER CYCLE, THE PUMP CONTROL SWITCHES WOULD NEED TO BE SET 21 (2'-/o,) FEET APART BACKFILL - EXPANDED POLYSTYRENE DISCHARGE A6' PIPE s' ROCK 3/4' 2'/2" DIA TO DETERMINE THE LIQUID CAPACITY OF ANY TANK, FIRST DETERMINE THE SURFACE AREA OF THE LIQUID. MULTIPLY THIS VALUE By 75 (GALLONS PER CUBIC FOOT) TO DETER- MINE THE ;ANK LIQUID CAPACITY IN GALLONS PER FOOT OF DEPTH DROP BOX 12' SOIL COVER • 34 . 2'i� DIA ROCK • FROM PUMP DRAIN Tit E OR RIGIC _J PERFORATED PLASTIC PIPE y S MIN. FROM BOTTOE.4 OF TRENCH TO WATER TABLE OR CLAY OR ROCK LAYER SOIL TREATMENT AREAS FOR TYPE I HOMES REQUIRED SOIL f REATMENT AREA IN SQUARE FEET PER BEDROOM PERCOLATION RATE IN TRENCHES MINUTES PER p� pF ��ppyyyy INCH SEEPAGE DISTRIBUTION PI K IINCIES 46 TO SLOWER 60 I 330 1330 1265 1220 1200 THAN 60b °SEWAGE FLOW I 1 50 GPO PER BEDROOM bSPECIAL DESIGN SHOULD BE USED TO PROVIDE ACED.: TREATMENT AND ABSORPTION OF EFFLUENT RECOMMENDED AMOUNT OF EFFLUENT TO PUMP PER CYCLE IS 25 PERCENT OF DAILY SEWAGE FLOW. MINIMUM AMOUNT OF EFFLUENT TO PUMP PER CYCLE IS 75 GALLONS UNIVERSITY OF MINNESOTA EXTENSION AGRICLI,.TURAL ENGINEERING _ PUMPING STATION ` 1 6 1 12 18 1 24 FASTER THAN O.I b 0.1 TO 5 125 125 100 85 75 6 TO 15 190 190 150 125 115 16 TO 30 250 250 200 165 150 31 TO 45 300 300 240 200 180 46 TO SLOWER 60 I 330 1330 1265 1220 1200 THAN 60b °SEWAGE FLOW I 1 50 GPO PER BEDROOM bSPECIAL DESIGN SHOULD BE USED TO PROVIDE ACED.: TREATMENT AND ABSORPTION OF EFFLUENT RECOMMENDED AMOUNT OF EFFLUENT TO PUMP PER CYCLE IS 25 PERCENT OF DAILY SEWAGE FLOW. MINIMUM AMOUNT OF EFFLUENT TO PUMP PER CYCLE IS 75 GALLONS UNIVERSITY OF MINNESOTA EXTENSION AGRICLI,.TURAL ENGINEERING _ PUMPING STATION ` METAL COVER ,*.a sig CONCRETE MANHOLE FLING METHODS OF SECURING MANHOLE COVER TO PREVENT UNAUTHORIZED ENTRY 4. PENCIL MARKS 20" vi ' — n MANHOLE / C All - - INLET SCUM ... ` ;1 OUTLET LEVEL - SCUM CLEAR SPACE —= — �� ;; CLEAN OUT TANK WHEN: "A" IS V OR LESS OR "B" IS 12" OR Lc -SS ' BLACK COLOR SLUDGE DISTINGUISHES SLUDGE LAYER FROM LIQUID MEASURE SCUM AND SLUDGE ACCUMULATIONS IN THE SEPTIC TANK SEPTIC SYSTEM INFORMATION STREET ADDRESS 3 So!D C F4"-s77/-)e`-/R.IVt LOT 3 BLOCK_ SUBDIVISION rz ADDInbN MONTH AND YEAR TESTING DONE /1/,OL/ . 19S7 ITEMS ALREADY COMPLETED y S r Tse D e SlG-fo "7 g poMr NEED TO COMPLETE BEFORE ISSUING BUILDING PERMIT: OBORINGS UPERC TESTS OSYSTEM DESIGN 9S PLAN O OTEER 0 COMMENTS C'1o^^N e Jyi t . PCS'r7I S/ rz�-.S DATE THIS SHEET FILED 20-2'O BY`� SUBDIVISION FILE NO. IZ-32— r / Acres _ I .. CnFFIN !i nRnNRFRG. INC. �\ R Sb Ir . � •-�•---- �' moi— .....y„ "�! . wo loe .0e 96 _. `\ f /�_ r 04 ` .. / loll lolo, r / Acres _ I .. CnFFIN !i nRnNRFRG. INC.