HomeMy WebLinkAboutSWP22-000064 - Sewer and Water Disconnect�DATEi TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED 22 0 FtOO AW
PERMIT NO. "Ll �' COMPLETED
ADDRESS 19 '5 LOVI (' OV J I A �L
OWNER
CONTRACTOR
�; DESCRIPTION
III ❑ FOOTING ❑DEMO -FINAL
Q ❑POURED WALL ❑PLUMBING RI
y ❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL
Z❑ LATHE ❑ MECHANICAL RI
Q ❑ FRAMING ❑ MECHANICAL FINAL
❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ FINAL ❑ WATER HOOK-UP
tell ❑ AS BUILT - SURVEY ❑ SEWER HOOK-UP
J ❑ DEMO - SITE ❑ SEPTIC INSTALL
OWNERICONTRACTOR TO MEET YOU: _ YES _ NO
COMMENTS:
ct 1C e
0
cc
0
W
cc
Q
W
J
W WORK SATISFACTORY: PROCEED
W❑`i;ORRECT WORK & PROCEED
O ❑ CORRECT WORK, CALL FOR REINSPECTION
V BEFORE COVERING
❑ CORRECT UNSAFE CONDITION WITHIN
INSPECTOR WILL RETURN
❑ STOP ORDER POSTED. CALL INSPECTOR
❑ SEPTIC FINAL
❑ EXCAV/GRADING/FILLING
❑ TREE REMOVAL
❑ SITE INSPECTION
❑ RATED WALLS
❑ COMPLAINT
❑ FOLLOW-UP
❑ FOUNDATION/REMOVAL
PROJECT COMPLETE
❑ ISSUE CERTIFICATE OF OCCUPANCY
TEMPORARY
PERMANENT
HOURS. p pHOTOTAKEN
❑ INSPECTION REQUIRED. CALL TO ARRANGE ACCESS.
❑ CITATION ISSUED
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor on site:
Inspector.
White Copylinspector's File Canary CopylSite Notice