HomeMy WebLinkAbout1987-02-13 Insp Notice, FINALo;
0
W
Ilk
12
i
W
ct
b
W —
ct
'kW WORK SATISFACTORY PROCEED U PHOTO TAKEN
CORRECT WORK i PROCEED
- CORRECT WORK CALL FOR REINSPECTION BEFORE COVERING
CORRECT UNSAFE CONDITION WITHIN HOURS INSPECTOR WILL RETURN.
STOP ORDER POSTED CALL INSPECTOR
:. INSPECTICIN REQUIRED CALL TO ARRANGE ACCESS
call for the next inspection 24 hours in advance. .
Owner/Contr. on site
Inspector 4M=
01ir / Inwel 7SF lie Garwti /Silt Nvtme
DATE TIME
CITY Of ORONO
CALLED IN
--�
INSPECTION NOTICE
SCHEDULED
+� 2
PERMIT NO.
COMPLETED
? "I 3 -81
ADOREii
OWNER
CONTR.
TELEPHONE NO.
7 FOOTING
D
PLUMBING RI
'7 SITE INSPECTION
'] FRAMING
"-%
PLUMBING FINAL
'7 EXCAV /GRADING/FILLING
3 INSULATION
71
MECHANICAL
;_1 LAKESHORE/WETI A1,.DS
J WALL 80
:7
WATER HOOKUP
71 LICENSING
"INAL
:J
METER SEWTURN ON
7 COMPLAINT
0 PROGRESS
`.J
SEWER HOOKUP
i3 FOLLOW-UP
7 DEMOL
J
SEPTIC INSTALL
O SEPTIC FINAL
7 FIRE PREY
SEPTIC MAINT
3 FIREPLACE/WOOD BURNER
Z
WELL TEST PUMP
:)
i
COMMENTS:
i
W
Z)
0
o;
0
W
Ilk
12
i
W
ct
b
W —
ct
'kW WORK SATISFACTORY PROCEED U PHOTO TAKEN
CORRECT WORK i PROCEED
- CORRECT WORK CALL FOR REINSPECTION BEFORE COVERING
CORRECT UNSAFE CONDITION WITHIN HOURS INSPECTOR WILL RETURN.
STOP ORDER POSTED CALL INSPECTOR
:. INSPECTICIN REQUIRED CALL TO ARRANGE ACCESS
call for the next inspection 24 hours in advance. .
Owner/Contr. on site
Inspector 4M=
01ir / Inwel 7SF lie Garwti /Silt Nvtme