Loading...
HomeMy WebLinkAbout1992-06-05 Letter, Septic System Repair RequiredJune 5, 1992 Donald DeMulling 4325 Chippewa Lane Maple Plain, MN 55359 RE: Septic System Repairs Dear Mr. DeMulling: CITY of ORONO n1unb6pal oma Paq (Mke Box 66 Crystal Bay, Mhmewft 55321-0066 This is a reminder that a recent inspection revealed that your septic system is failing and must be repaired. Please contact me as soon as possible to discuss your options. You have until August 4, 1992 in which to make repairs to the system. Enclosed is a copy of your most recent septic report. The procedure for initiating septic system repairs is as follows: 1. Hire a Soil/Site Evaluator to do the necessary testing and design. 2. Submit the design to the City for approval. 3. Once the design is approved, have one or more contractors bid on the approved design. 4. The contractor you choose shculd then obtain a permit from the City before starting work, and he will call for the required inspections. If you have any questions please contact me at the City offices. Thank you for your prompt attention to this letter. Sincerely, Stephen Weckman On -Site Systems Manager Enclosure sw/ I sv TELEPHONE - 473-7357 • SAX • 4734510