HomeMy WebLinkAboutSWP24-000096- SEWER CONNECTTIME
C,
Z
Q
J
W
Z
J
Z
0
w
a
J
O
cc
0
w
W
Q
z
Lw
cc
J
a
w
cc
CITY OF ORONO
INSPECTION NOEIC 10
PERMIT NO. 5VVYZI_060 60
ADDRESS ANY AlUdUl
C I ►'GI_X10
CONTRACTOR
DESCRIPTION
CALLED IN
SCHEDULED
COMPLETED
DATE
I r' 2
I 10 2
TELEPHONE NO. 70 (9k 83YZ
❑ FOOTING ❑DEMO -FINAL ❑SEPTIC FINAL
❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL
❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION
❑ FRAMING ❑MECHANICAL FINAL ❑RATED WALLS
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
❑ AS BUILT -SURVEY SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
❑ DEMO -SITE ❑ SEPTIC INSTALL
OWNERICONTRACTOR TO MEET YOU: )(YES _ NO f�
COMMENTS:��-
❑ WORK SATISFACTORY: PROCEED
w ❑CORRECT WORK &PROCEED
RRECT WORK, CALL FOR REINSPECTION
C BEFORECOVERING
❑ CORRECT UNSAFE CONDITION WITHIN _
INSPECTOR WILL RETURN
❑ STOP ORDER POSTED, CALL INSPECTOR
Y
❑ PROJECT COMPLETE
❑ ISSUE CERTIFICATE OF OCCUPANCY
TEMPORARY
PERMANENT
HOURS. �HOTOTAKEN
❑ CITATION ISSUED
O INSPECTION REQUIRED.CALLTOARRANGEACCESS,
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice