HomeMy WebLinkAbout3237 Shadywood Circle Point of Sale-Compliancy Expires 11-25-2025Date Called in
1/22/2025
Date Scheduled
City Of Orono
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
Property Address:
1 3237 Shadywood Cir
PID:
12011723110045
Owner Information
Name:
Mailing Address:
(if different from
Property)
Phone:
Email:
Inspector Information
Name:
Company/ Organization
License number:
Phone:
Email:
Inspection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
X
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
\/
pumped outside of the building. Foundation drains should not be connected
/\
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
�(
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service
Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
X
sped cations. (Details on back of this sheet
Notes:
11/20/2019: 4: pvc sch 40 sewer service anode & tracer wire.
will tap main & install new Y on west side of home. Will Inspection new
Y when done tapping main. 51b air test for 15 minutes - all ok
11/25/2019 4" PVC connected to 8" main on west side of home.
32' 6"from mh Anode installed
Connected 11/25/2019. Compliancy valid for 10 years from this date.
Toilet Removed
o Yes o No
For Inspection:
Inspectors Signature:
Date:
Owners Signature:
Date:
City Review
Compliant
❑ Corrective Action Re uit•ed
Certificate of Compliance Expires: 11/25/2029
Corrective Action Due by:
Date:
01 /22/2025
Signature:
Name: Kellie Hoen