Loading...
HomeMy WebLinkAbout3237 Shadywood Circle Point of Sale-Compliancy Expires 11-25-2025Date Called in 1/22/2025 Date Scheduled City Of Orono Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: 1 3237 Shadywood Cir PID: 12011723110045 Owner Information Name: Mailing Address: (if different from Property) Phone: Email: Inspector Information Name: Company/ Organization License number: Phone: Email: Inspection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open X connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then \/ pumped outside of the building. Foundation drains should not be connected /\ to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a �( drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and X sped cations. (Details on back of this sheet Notes: 11/20/2019: 4: pvc sch 40 sewer service anode & tracer wire. will tap main & install new Y on west side of home. Will Inspection new Y when done tapping main. 51b air test for 15 minutes - all ok 11/25/2019 4" PVC connected to 8" main on west side of home. 32' 6"from mh Anode installed Connected 11/25/2019. Compliancy valid for 10 years from this date. Toilet Removed o Yes o No For Inspection: Inspectors Signature: Date: Owners Signature: Date: City Review Compliant ❑ Corrective Action Re uit•ed Certificate of Compliance Expires: 11/25/2029 Corrective Action Due by: Date: 01 /22/2025 Signature: Name: Kellie Hoen