HomeMy WebLinkAbout2040 North Shore Drive Point of Sale Inspection-Compliancy Expires 12-23-2034TASK 90349
Date
Called in
12/9/2024
Date
Scheduled
12/10/2024 9:0
IAM
City Of Orono Reinspected After Repairs I Z/23/2024
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
Property Address:
1 2040 North Shore Drive
PID:
11011723310002
Owner Information
Name:
Leanna Erickson
Mailing Address:
(if different from
Property)
Phone:
952473-7051 95MQ7-9173
Email:
leannagenetics@gmail.com
Inspector• Information
Name:
Company/ Organization
License number:
Phone:
Email:
Inspection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
,
x
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
"
pumped outside of the building. Foundation drains should not be connected
n
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit,, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service
Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. Details on back of this sheet
Notes:
Bill Coppin replaced 25' of PVC 4"sch 40, WYE at 20' with 2 4" Ferncos
Task#90603
Toilet Removed
o Yes o No
For Inspection:
Inspectors Signature:
Date:
Owners Signature:
Date:
City Review
Com liant
❑ Corrective Action Required
Certificate of Compliance Expiresl2/23/2
34
Corr ctive Action Due by:
Date:
12/23/2024
I Signature:
1 Name: Kellie Hoen