HomeMy WebLinkAbout2040 North Shore Drive Point of Sale Inspection-Non-CompliantTASK 90349
Date
Called in
12/9/21)24
Date
Scheduled
12/10/2024 9:0
City Of Orono
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
Property Address, 2040 North Shore Drive
PID: 11011723310002
Owner Information
Name, Leanna Erickson
Mailing Address:
(if different from
Property)
Phone: 952473-7051 95MO7-9173 Email: leannagenetics@gmail.com
Inspector Information
Name,
Company/ Organization License number,
Phone: Email:
Inspection
System Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open I1(X\
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, wherd it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet)
Notes. f5&' S 0�'�.t c 5'0 •. i- Fv jr 4ttwr fv%jjo ec9h'e v% / /4e de v0p
Toilet Removed o Yes WNO
For Inspection:
Inspectors Signature: ,.' �•-� Date: l2 -10 � 7 �l
Owners Signature: Date:
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
Owner Information
Name, Leanna Erickson
Mailing Address:
(if different from
Property)
Phone: 952473-7051 95MO7-9173 Email: leannagenetics@gmail.com
Inspector Information
Name,
Company/ Organization License number,
Phone: Email:
Inspection
System Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open I1(X\
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, wherd it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet)
Notes. f5&' S 0�'�.t c 5'0 •. i- Fv jr 4ttwr fv%jjo ec9h'e v% / /4e de v0p
Toilet Removed o Yes WNO
For Inspection:
Inspectors Signature: ,.' �•-� Date: l2 -10 � 7 �l
Owners Signature: Date:
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
Inspector Information
Name,
Company/ Organization License number,
Phone: Email:
Inspection
System Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open I1(X\
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, wherd it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet)
Notes. f5&' S 0�'�.t c 5'0 •. i- Fv jr 4ttwr fv%jjo ec9h'e v% / /4e de v0p
Toilet Removed o Yes WNO
For Inspection:
Inspectors Signature: ,.' �•-� Date: l2 -10 � 7 �l
Owners Signature: Date:
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
Inspection
System Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open I1(X\
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, wherd it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet)
Notes. f5&' S 0�'�.t c 5'0 •. i- Fv jr 4ttwr fv%jjo ec9h'e v% / /4e de v0p
Toilet Removed o Yes WNO
For Inspection:
Inspectors Signature: ,.' �•-� Date: l2 -10 � 7 �l
Owners Signature: Date:
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
Inspectors Signature: ,.' �•-� Date: l2 -10 � 7 �l
Owners Signature: Date:
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
City Review
❑ Com liant Corrective Action Re uired
Certificate of Compliance Expires: 10Cor ective Action Due b : 0,3flO b
Date: Signature: mfiv
12,110120 Name: Vellie
AM
AM