April 11, 1988
Todd Waters
3061 Casco Point Road
Wayzata, MN 55391
Re: 3061 Casco Point Road -Restoration
Dear Mr. Waters:
Davenport^s^*letter‘^o/Ma^lh^2T‘^relate^d® Davidplan. The followinq shou i reconstruction
reconstruction: ^ ^ ® guideline for such
1.The plan detail should include the following:
?«de?"o?thfi'd:r/e„f„‘„SLrurbe^" inaictin,final grade. undisturbed property and proposed
rapping.*''** ‘he location of the proposed rip-
el’evationsof"the*8"'’ninelocation and invert
you Intend tl prlvatelv iis^»?1*'^ \° ‘olnstalled. if
conditional Use Permit a^p^o"va 1*^11* i°e*?:qufre ‘? *"*" *
D.) Provide detail of any proposed retaining walls.
portions of th«r*structuA* that *^' elevations for
restoration. Upon review of tholl* '1® to accomplish the
will aetermine whether rpermU U reoulr'ed t® ’’“tialng inspectorStructural changes. ^ required for the necessary
only retainViTg^lfalls^that*can*^hi^^^ restoration,
the site disturbance will be renermftt“a®‘l®lw®’‘*®**"«retaining walls in the 0-75* staff. Any new
having pre-existed will cannot be verified as
Use Permit and varialfc*e“ with Vl\nnlno'^?om°" ® Conditional review, Planning Commission and Council
‘“'Sko®"”®-*”’"’ADMINISTRATION A FINANCE - 473-7358
Pl'BLIC WORKS-473-7359
r
4 The plan should indicate the methods of erosion control to
be used* and should indicate the method of revegetation proposed.
5. Plans should contain information on the number and type of
replacement plantings proposed in the 0-75' zone where trees were
removed without City approval.
6. Rip-rapping shoreline is generally the jurisdiction of the
Minnehaha Creek Watershed District, who issues permits for such
work. Upon receipt of the Watershed District rip-rap permit, the
property owner should submit a copy of that permit the City of
Orono for issuance of a no-fee rip-rap permit. The City normally
issues the rip-rap permit the same day as it is applied fore
7. The approval process normally will take 7 to 10 working days
from the date of plan submittal. Review and approval of the
reconstruction plan will be the sole responsibility of staff and
the city engineer. The only need for Planning Commission and
Council review would occur if the proposed restoration plan
proposes work in excess of that which is obviously necessary for
restoration or foundation protection.
I am not aware of any further outstanding items, however, my
involvement in review of the after-the-fact Conditional Use
Permit application was minimal. I would advise you to contact
Building & Zoning Administrator, Jeanne Mabusth upon
from vacation on April 18, for confirmation of any additional
Issues remaining unresolved.
Please contact me at 473-7357 if you have any questions.
Michael P. Gaffron
Asst. Zoning Administrator
cct David Davenport , ^ ^ ^Jeanne Mabusth, Building 4 Zoning Administrator
John Gerhardson, Public Works Director
Mark Bernhardson, City Administrator
Glen Cook, City Engineer
MPG/lh