Loading...
HomeMy WebLinkAbout1988-04-11 Letter, Reconstruction PlanA A I ‘‘■'^ /^\ ’ '^<«. V “. 4'<«» > - <'^JTv.mm ORONOJ ■L'. .'^-A,' ^ CITY of ORONO Post Ofr.w Uox 66.Crystal Itay. Minne«>ta 65323• Munidpd OfiRcn On the North Shore of Lake Minnetonka April 11, 1988 Todd Waters 3061 Casco Point Road Wayzata, MN 55391 Re: 3061 Casco Point Road -Restoration Dear Mr. Waters: Davenport^s^*letter‘^o/Ma^lh^2T‘^relate^d® Davidplan. The followinq shou i reconstruction reconstruction: ^ ^ ® guideline for such 1.The plan detail should include the following: ?«de?"o?thfi'd:r/e„f„‘„SLrurbe^" inaictin,final grade. undisturbed property and proposed rapping.*''** ‘he location of the proposed rip- el’evationsof"the*8"'’ninelocation and invert you Intend tl prlvatelv iis^»?1*'^ \° ‘olnstalled. if conditional Use Permit a^p^o"va 1*^11* i°e*?:qufre ‘? *"*" * D.) Provide detail of any proposed retaining walls. portions of th«r*structuA* that *^' elevations for restoration. Upon review of tholl* '1® to accomplish the will aetermine whether rpermU U reoulr'ed t® ’’“tialng inspectorStructural changes. ^ required for the necessary only retainViTg^lfalls^that*can*^hi^^^ restoration, the site disturbance will be renermftt“a®‘l®lw®’‘*®**"«retaining walls in the 0-75* staff. Any new having pre-existed will cannot be verified as Use Permit and varialfc*e“ with Vl\nnlno'^?om°" ® Conditional review, Planning Commission and Council ‘“'Sko®"”®-*”’"’ADMINISTRATION A FINANCE - 473-7358 Pl'BLIC WORKS-473-7359 r 4 The plan should indicate the methods of erosion control to be used* and should indicate the method of revegetation proposed. 5. Plans should contain information on the number and type of replacement plantings proposed in the 0-75' zone where trees were removed without City approval. 6. Rip-rapping shoreline is generally the jurisdiction of the Minnehaha Creek Watershed District, who issues permits for such work. Upon receipt of the Watershed District rip-rap permit, the property owner should submit a copy of that permit the City of Orono for issuance of a no-fee rip-rap permit. The City normally issues the rip-rap permit the same day as it is applied fore 7. The approval process normally will take 7 to 10 working days from the date of plan submittal. Review and approval of the reconstruction plan will be the sole responsibility of staff and the city engineer. The only need for Planning Commission and Council review would occur if the proposed restoration plan proposes work in excess of that which is obviously necessary for restoration or foundation protection. I am not aware of any further outstanding items, however, my involvement in review of the after-the-fact Conditional Use Permit application was minimal. I would advise you to contact Building & Zoning Administrator, Jeanne Mabusth upon from vacation on April 18, for confirmation of any additional Issues remaining unresolved. Please contact me at 473-7357 if you have any questions. Michael P. Gaffron Asst. Zoning Administrator cct David Davenport , ^ ^ ^Jeanne Mabusth, Building 4 Zoning Administrator John Gerhardson, Public Works Director Mark Bernhardson, City Administrator Glen Cook, City Engineer MPG/lh 1 A 9