KRAUS-ANDERSON CONSTRUCTION COMPANY
� c�>N�i�i:��cr�>i�s �� � ����sTizucri���� �MnNnc,ri:s
March 24, 1995
Mr. Lyle Oman
C:iry of Orono
2750 Kelly Parkway
Orono, MN 55356
RE: Building Permit
Southways Greenhouse/Garage
Dear Mr. Oman:
Scope of Work for the Greenhouse/Garage remodel and renovation (these items
are not noted on the attached sketches):
Demolition
1) Remove concrete slab at basement of Greenhouse.
2) Remove existing studwall at basement of Greenhouse.
3) Remove miscellaneous piping in tunnel not required to service
Greenhouse (These pipes will have to be identified and tagged).
Asphalt
1) Provide patching for utilities to service garage.
Landscape
1) Provide sod repair for disturbed areas around Greenhouse.
Concrete
1) Provide placement of a new 4" concrete slab at basement of Greenhouse.
Masonry
1) Remove and replace north and west walls, the existing brick cap and the
top (4) courses of brick.
�) Restore and repair existing brick wall (east and west) from the garage to
cottage.
Rough CarpentrX
1) Provide new stud wall at basement of Greenhouse where existing wall is
to be removed.
Midwest Division ol�GENEqq�Coy
8625 N.E. Rendova Street, P.O. Box 158, Circle Pines, MN 55014 A�C f
Phone: (612) 786-7711 FAX: (612) 786-2650 r��
Equal Opportunity Employer �F�yEp\G�
Mr. Lyle Oman -2- March 24, 1995
City of Orono
Mechanical - Gara�e
1) Install a new natural gas line from the existing meter at the south end of
the existing greenhouse to the existing garage. Note: Kraus-Anderson
to remove and replace blacktop driveway as needed.
2) Furnish and install (2) 75,000 BTU natural gas fired unit heaters, one
in each corner of the garage near the back wall.
The units will be complete with Class B stacks and line voltage
thermostats.
Mechanical - Greenhouse
1) Install a natural gas line to the (2) Modine propeller unit heaters, which
are furnished and installed by the Rou�h Brothers Company.
2) Furnish and install (2) new floor drains and connect the new waste line
to existing floor drain, this waste line will extend back into the existing
mechanical room where waste connection will be made. This new line
will have a vent line extended through the greenhouse roof, an opening
in roof should be provided by Rough Brothers Company. Note: There
would be approximately 30 sq. ft. of concrete for Kraus-Anderson to cut
and patch.
3) Furnish and install (4) frost proof outdoor sillcocks. Two on the west side
and two on the east side of the new greenhouse. No pipe covering on
any water lines.
4) Install a 1/2" water supply to the Rough Brothers Company furnished
and installed 100 gallon sump tank. This line will be protected with a
R.P.Z. valve.
5) Furnish and install (6) cold water faucets (Chicago number 998 with
vacuum breakers). Three on the west wall and three on the east wall.
6) Furnish and install (1) 50,000 BTU natural gas fired unit heater, this
would be necessary to protect the P-trap for the floor drain in the upper
level floor or this would ha�e to have a heating tape on it. There would
be a 4" Class B chimney run up through the new greenhouse, Rough
Brothers would ha�e to provide openin� in the roof of tne greenhouse
for the stack to pass through. We will furnish a line voltage thermostat,
but Kraus-Anderson's electrical contractor will have to do power and
control wirin�.
Mr. Lyle Oman -3- March 24, 1995
Ciry of Orono
Mechanical - Greenhouse-Cont.
7) Furnish and install a sump pump, and basin, this will have a floor drain
attached, the water will be pumped up into the new waste line, and the
vent will be connected to the new floor drain vent line. Kraus-Anderson
will have about 14 sq.ft. of concrete to cut and patch. Kraus-Anderson's
electrical contractor will have to wire standard 110 opening.
Electrical- Greenhouse
1) Install a 12 circuit, circuit breaker panel in the greenhouse and all
outlets and connections as specified on Rough Brothers quotation.
Lighting in the greenhouse basement five 8' tandem (2) lamp
fluorescent with T8 lamps and electronic ballasts and on first floor
10 8' tandem (2) lamp fluorescent same as basement, but with shades.
2) Rework existing panels within the existing mechanical room in the
cotta�e.
3) Wire gas fired unit heater with line-voltage thermostat and separate
circuit from breaker panel. No. 2 wire sump pump outlet.
4) Upgrade the 400 amp single phase 120/240 volt service with meter
on the outside and a new 400 amp main circuit breaker, breaker
panelboard.
Electrical- Gara�e
1) Install new feeder into garage. Furnish and install (5) 8' 2 lamp with
fluorescent fixtures with electronic ballasts and (4) 48" T8 lamps.
A duplex receptacle, 2-3 ways switches, wire for and connect two
unit heaters with line voltage thermostats.
Very truly yours,
KRAUS-ANDER,$ON CONSTRUCTION COMPANY
MIDW�ST DIX��SION
, �
; %
�a �% /%�
�J . L;
/
' cott A.�rawford
Project anager