HomeMy WebLinkAbout1976-03-19 Letter, Corrections From Final InspectionMuch 19p 1976
P0tman PluMbing 6 Htiting
N cvut »» Miimesot«» SS992
D mt Mr. Pttmon:
R0: 2807 Cisco Foint Road/Building Pondt S194
Ftr «ur cmonition yostoid^r, I Mds 1 Pinal Inspection this iftemoon on the
Aampn^pntf. hhen the AIMA k itma of eoiic iie conpletod md inspected, 1
Gsrtificste of Occupeney will be issued. Because the house is cunently oc
cupied, I would expect the woik to be completed within IS days.
^ waste line in baseaent is not adequately anchored where it posses
throui^ the north wall. The pipe should be grouted inpplaoe or otherwise
anchored so as to prewmt novenent.
2. The upstairs bathrooai has sane plain gypsia wallbotfd installed in the tub
HH ft?*®?.?*®** ** replaced with water resistant type perUBC 1711 (d).
S. Tte eoBessive pile of construction <M>ris outside mist be rsiMfred per
Ordinance Section 82.040.
If you hare «iy questions, please call.
Sinoeriiy,
Al« P. Olson
Mldinf I Zoiing Inspector
m/Td