HomeMy WebLinkAbout2075 Weber Hills Rd Point of Sale Inspection-Compliancy Expires 11-14-2034TASK 89193
Date
Called in
11/6/2024
Date
Scheduled
11 /14/2024
7
30
AM
e
��KfSHORE
City Of Orono
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
Property Address: 2075 Webber Hills Rd
PID: 0311723340025
Owner Information
Name. Michael McKeand
Mailing Address:
(if different from
Property)
Phone: 414477-0482 1 Email: mckeand13 ahoo.com
Ins ector Information
Name:
Company/ Organization License number.
Phone: Email:
Inspection
S stem Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open r/
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, where it is then /
pumped outside of the building. Foundation drains should not be connected V
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all \/
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet
Notes: 41)' 4o dank
yr, 6" Gash ,G
Toilet Removed o Yes o No
For Inspection:
Ins ectors Signature: Date:
Owners Signature: Date:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
Owner Information
Name. Michael McKeand
Mailing Address:
(if different from
Property)
Phone: 414477-0482 1 Email: mckeand13 ahoo.com
Ins ector Information
Name:
Company/ Organization License number.
Phone: Email:
Inspection
S stem Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open r/
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, where it is then /
pumped outside of the building. Foundation drains should not be connected V
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all \/
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet
Notes: 41)' 4o dank
yr, 6" Gash ,G
Toilet Removed o Yes o No
For Inspection:
Ins ectors Signature: Date:
Owners Signature: Date:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
Ins ector Information
Name:
Company/ Organization License number.
Phone: Email:
Inspection
S stem Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open r/
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, where it is then /
pumped outside of the building. Foundation drains should not be connected V
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all \/
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet
Notes: 41)' 4o dank
yr, 6" Gash ,G
Toilet Removed o Yes o No
For Inspection:
Ins ectors Signature: Date:
Owners Signature: Date:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
Inspection
S stem Standard Pass Fail
Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open r/
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation Foundation drains are underground pipes that collect storm water from
Drains around the base of a building and into a sump basket, where it is then /
pumped outside of the building. Foundation drains should not be connected V
to the sanitary sewer.
Sump Pumps Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all \/
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet
Notes: 41)' 4o dank
yr, 6" Gash ,G
Toilet Removed o Yes o No
For Inspection:
Ins ectors Signature: Date:
Owners Signature: Date:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
Ins ectors Signature: Date:
Owners Signature: Date:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
City Review
Com liant ❑ Corrective Action Re uired
Certificate of Compliance Expires: / r7 Corrective Action Due by:
Date: Signature:
20 2 Name:
Service Line Inspection Details
Weather Conditions:
Approximate Depth of Service
Type and Size of Service
Overall Condition of Service Pipe
Please note all connections, fittings, points of concern on service line including infiltration, tree root,
cracks, misaligned joints, etc.
This report must include a digital copy of the televising.
Feet
Comment
Example:
0
Start for 4" cleanout in NE corner of Basement
1-10
Misaligned joint —Infiltration
0
Notes: