Loading...
HomeMy WebLinkAbout1980-04-24 Notice of Gas Service InstallationMethod of Installation or Construction (including method of compaction and excavation) will be in accordance with procedures as described in Minnegasco Operations Manual, Section 500, "Excavating, Backfilling and Surfacing", the most recent edition on file with the permitting authority. Install: Additional Info. Date ComDleted Service To the (City Engineer (City Council (Village Council (Town Board Main "Mal Pressure Class Location The Minnesota Gas Company hereby reLluests permission to perfor n the work indicated above. MINNESOTA GPS COMPANY r , L i ti y L t. -Y �--� --. ✓ (Chief E To the Minnesota Gas Company —1 Permission is hereby granted the Minnesota Gas Company to perform the work indicated above. f (•7 V� l: Date r2 2 C By (Au*" a, Orratu►.► F UI IT$ 52 H 5 IS MINNEGASCO SERVICE INSTALLATION Map No. Natural Gas LJ Propane Vapor O Permit No. Municipality Orono Minneapolis O Order No. u2� Folio No. Date Ordered 14'24'80E No. t-44 stome►'sName Kenneth H. Erickson Tel. tallation Address 2,173 r Casco Poin, Rr d Zip t Block Addition LQUJL tal Method of Installation or Construction (including method of compaction and excavation) will be in accordance with procedures as described in Minnegasco Operations Manual, Section 500, "Excavating, Backfilling and Surfacing", the most recent edition on file with the permitting authority. Install: Additional Info. Date ComDleted Service To the (City Engineer (City Council (Village Council (Town Board Main "Mal Pressure Class Location The Minnesota Gas Company hereby reLluests permission to perfor n the work indicated above. MINNESOTA GPS COMPANY r , L i ti y L t. -Y �--� --. ✓ (Chief E To the Minnesota Gas Company —1 Permission is hereby granted the Minnesota Gas Company to perform the work indicated above. f (•7 V� l: Date r2 2 C By (Au*" a, Orratu►.► F UI IT$ 52 H 5 IS