Loading...
HomeMy WebLinkAboutLtr re PUD modifications . . r '� ... O � ,,~ P«� 'S"r� �„��#"_'9 �i ` E��� r c._ r�f� � i� f.�. ti : �4 r, . �� LANDFORM MINNEAPOLIS•PHOENIX October 20, 2004 Michael Gaffron City of Orono 2750 Kelley Parkway PO Box 66 Crystal Bay, MN 55323 RE: StoneBay Minor PUD Modifications Dear Mr. Gaffron, On behalf of our client, Landform is requesting approval of a minor modification to our approved PUD plans related to building encroachments. Specifically, 1. Setback for Lot 6, Block 1. After approval of the StoneBay project, we realized that we had erroneously shown a 19.6-foot setback from the north property line for Lot 6 (0.4 feet less than the 20-foot approved setback). Due to the way the lots were dimensioned on the plat, we did not realize our error until the lot certificate for Lots 5 and 6, Block 1 were recently completed. It was certainly not our intention to knowingly thwa►t the approved plans, but was simply an oversight in the many iterations of the plan during the approval process. We are not able to shift the buildings without replatting the project. The homes to the north are 200-300 feet from the planned building; therefore, the change to the plan (less than 5-inches) would not be distinguishable from the adjoining properties. The modification to the PUD setback would have no impact on adjacent properties because the approve setback for other portions of the site allowed a 10-foot setback from this lot line. The adjacent building (on Lots 7 and 8) to east was approved with a 10-foot setback from the north plat boundary and the only difference is that the adjacent building is 10 feet from the rear of the building and we are requesting flexibility to allow a 19.6-foot side yard setback. We believe this is consistent with the StoneBay PUD approvals and the project design. � If we are required to replat the property, it will result is significant delays for the residents ready to begin construction of their new homes on Lots 5 and 6, which are the only lots affected by this issue. We hope that you will use the City's discretionary authority to approve this modification to the PUD. fi��� 3UTLF.R NORTht 3U!�DING 510 F1RST AVEMUE NORTFI MINNE.APOL.'��.5, P.1N 55403 0�=('ICE: o_-'..252,fi070 i=AX: 612,252_9077 vdvvw.landferin,net � , - . �Michael Gaffron Re:StoneBay PUD Modification ' Page 2 October 20,2004 2. Eave Overhangs. Our envelope lots for this development were intended to enclose the building footprint, and allow for eave overhangs. Unfortunately, it was recently brought to our attention that your ordinance allows 1.5-foot overhangs to encroach into the setback requirement, not 2 feet as proposed on � our units. Due to the setback issue described above, our eaves encroach into the setback beyond what is typically permitted. However, we believe that this encroachment is consistent with the intent of the PUD for StoneBay and request PUD flexibility to allow this encroachment. 3. Structural overhangs. We have a bump out proposed on Lot 6, Block 1 which also encroaches 1.5-feet into the setback. While we understood that this encroachment was similar to an allowed encroachment for a bay window, we now understand that because the cantilever is from floor to ceiling on the main level, it would not be allowed to encroach into the setback even though it does not include an extension of the foundation. The City has approved similar cantilevers in other portions of the project, but these elements have never created a setback issue. This is a unique circumstance due to the envelope lot setback; therefore, we are requesting flexibility to allow this encroachment for Lot 6, Block 1. Unfortunately, this lot has been restricted beyond the limits of other lots in the PUD due to the error in the setback. We believe that while the cantilever does not meet the letter of the law, it does meet the spirit and intent af the ordinance and we ask that you provide setback flexibility for this homeowner. We are very excited about the StoneBay project and believe that the project is a wonderful addition to the City of Orono. The wetlands, approved building designs and approved lot layout, create constraints that are unique to Lot 6. However, we believe the requested flexibility is indistinguishable to surrounding properties and does not diminish the spirit of the StoneBay PUD approvals. Therefore, we request approval of these modifications to the approved RPUD General Plan based pm the finding that they are generally consistent with StoneBay approvals and would have no impact on surrounding properties. If you have any questions or comments, please contact me or Steve Johnston at 612.252.9070. Sincerely, LANDFORM* ��- l�l�l ) . Kendra Lindahl, AICP Principal Planner COPY: John Hassler, John Terrance Homes, LLC 'Landform Engineering Company doing business as Landform 650 BUTLER NORTH BUILDING 510 FIRST AVENUE NORTH MINNEAPOLIS,MN 55403 OFFICE: 612.252.9070 FAX:612.252.9077 wv�nN.landform.net