Loading...
HomeMy WebLinkAboutNavWaterTower-4PAINTING INSTRUC IONS k A SPECIFICATIONS: ;t All material and workmanship to be 14 accord*nce with Vie specification issued for this contract by Mills.Engineeting Com4ny Long Lake, Minnesota55356 B. SHOP: 1. Surface preparation: All surfaces'to be G it Blasted 'er SSPC #6 (Commercial Blast) f 2. Painting: No Paint within 2" of f.ikld weld'd edges orlinside tubular columns. Inside: A Prime coat of Tnemec A2724`Topox. j Recommended coverage rate 240 sq. ft. per gallon for a dry mil thickness of 3 mils. Thin with VNEMEC 2 Thinnar. 1 Outside: A prime coat of Tnemec 880. �ftecomneladed coverake rate 300 sq. ft. per gallon for a ry mil thickness of 2.2 mils. Thin with Tnemec #883 Thinner Special Note: Do dot stack plates wet. C. FIELD: 1. Surface Preparations Clean all unpainted and braded areias by sand blasting per SSPC #6 (Co�mercial Bllast) 2. Spot Painting: All unpainted and abraded areas., to✓spot--P�int�with same coating as was used in shop. E 3. Whip Blasting: In order for the field coats ofiinside paint to mot- adhere to the shop primer of Topox, all inside areas should be scarified.by whip blasting f i� INI MILLS ENGINEERING CO, LONG LAKE� MINN. 2r)0 H Gal. DEW T & T i For Orono. Minnesota .r P:1 (Sh't ), PITTSBURGH•DES MOINES SrM COMPANY �t ENGINEERS-- MANUFACTURKRR—