HomeMy WebLinkAbout51 Hackberry Hill Point of Sale Inspection-Compliancy Expires 9-25-2034TASK 84689
LDNO
City Of Orono
�iKF5H04t
Point of Sale Sanitary Sewer Service I&I Compliance
Date Called in 5/15/2024
Date Scheduled 5/20/2024 9:30 AM
Reinspected after repairs 9/25/2024
Inspection Form
Property Address:
Z) I HaL;Kberry r=1111
PID:
13311823440016
Owner Information
Name:
Duane H Lund
Mailing Address:
(if different from
Property)
507-995-8172 Logan
Phone:
612-382-8490
I Email:
duane@103111c.com
Inspector Information
Name:
Company/ Organization
License number:
Phone:
Email:
Inspection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
v
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service
Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. Details on back of this sheet
Notes,
Ouverson Repaired sewer service 6" to 4" repair. 5'4" PVC repair
6" settled causing offset
Repairs inspected 9/25/2024, Scott O 9/25/2024
Toilet Removed
o Yes o No
For Inspection:
Inspectors Signature: Date:
Owners Signature: Date:
City Review
Com liant
❑ Corrective Action Re uired
Certificate of Compliance Expires:
Corrective Action Due by:
Date:
9/25/2024
Signature:
Name: Kellie H en