Loading...
HomeMy WebLinkAbout1989-11-30 On Site Sewage Treatment Inspection ReportOn the Sorth Shore of Lake Minnetonka ON-SITE SEWAGE TREATMENT INSPECTION REPORT (It'. OBON(.i POST OFFICE BOX 66 1335 S. Brown Rd. Crystal Bay, MN 55323 473-7357 OWNER I ADDRESS PERMIT NO.’S.DATES CONTRACTORS Cfv Ordinance No 210 .e.iu.res that each on.«ite tevaage treatment *v»tem in Orono jntPect^ on a regular b#lil. The onsite faenaga trealmerlt tvMern at the above addre.. ha. been in,pected and apt>ear. to laM into the category checked below. □ l ET2 □ 3 □ 4 (This IS □ an existinq sv»te"i □ new construction) Meets or exceeds cu.rent City standards in all respects relating to design, constioction. and location. Appears to be operating properly. Does not meet all cuiren, City standards fo, new construction (1978 Code) but in most r^ts appears to be ^ted. and ronsliucted generally m accordance with piev.oos codes. System appears to be lunctioning properly, no ma|Or Upgrading of the system is required at this time. noes not meet current City standaids n many respects relating to design, construction, or location. A^ars tobeopwWuig Adequately at this time, but has a relatively high ,H.f nt.al loi luiure problems No ma|or upgrading ol system is required at this Time System may oi may mu meet current City standards loi rlesign. const.uction or localion, but dispose ol the curreni input, and ,s endangeiing a water su|n>ly. or is a source ol pollution to surlace creating a salety ha/ard. oi is otherwise ciealmg a public nuisance Please contact the Cdy Inspector to diKusssyMW re^^^ replacement procedures II drainlield replacement is necessa.y, soil testing will usually be required, and a design and MW plan must be submitted for rev.ewv Your contrsetof must obtain a permit before work is started. SYSTEM CONDITION ( (Z Checked items may require your action) Tank pispection indicatesik_______ QiC Pumpout not needed et this time. □ Solids accumulation in tanks indicates they should be pump, ed out this year to help prevent future problems. □ Solids accumulation m tanks is at a critical level. Tanks should be pur-nped out as soon as possible. □ System is discharging to surface. Tanks must be pumped within 48 hours to eliminate surface discharge. G Inspection risers missing- tanks could not be inspected. Inspection risers (4 * dia. pipe) must be installed in each tank at next pun Tut. If tanks have not been pumped out within the last threr. .s, they should be pumped out now G Inspection pipe is located directly over tank baffle. (Does not give accurate measurement of solids accumulation.) If tanks have not been pumped out within the last three years, they should be pumped out now. DrainJ>eld inspection indicates B b Drainlield is dry. no surfacing evident. Q Some evidence of surfacing, not critical yet. n Drainlield is saturated and visibly discharging untreated effluent to the surface. This condition may require replace­ ment or additions to drainlield. Contact tha City Inspactoi immediately. Repairs must be completed within 90 days. G Drainlield extent and condition unknown. SITE CHARACTERISTICS Limiting Site Factors □ Slope Q Soil O^igh water table fi^ot sire Sb Lake, wetland, or stream Q Drainage Site CapahrMies for Future Expansion □ Adequate ffffair □ Poor □ Inadequate c iMENTs Potential for System Failure (depends on soil types, water table, and systerrt c onditinn) G^ow SfMedium □ High □ Sysu.n IS causing visible surface discharge ^ p Atp' CL • _j(2kL€—7 - '' 'J r tT . ^ __ iikoJBi. 1 ifcf Xc I f ^ U • ri oJ the tyslefn oiuJei cuiu ut < iimliiions based on the avaitatke mfoimation This lepoii must bi kiut on die pii-mises with syslidn lociticin and pumping tecoids WMt TF L (tpy tn««.cto. s T It* GOl O COPY , Homeowne,