February 4, 1982
City of Orono
BOR 66
Crysta_ Day, MN 557'7
Attn: Jeanne Maybusth
Re: Tonke Lake Property
1340 Bolden Park Raod
Our File 139-669
Dear Jeanne:
This letter provides an estimate of the cost of constructing a sever line to
serve the Gladys Olson home.
450
m... C/
8" DIP Sanitary Sever @ 516.00/lin.ft.
r.vn Or M.v.• RI
105
/.rrL r J.4rld I I
A" PVC Sanitary Sever 8 514.00/lin.ft.
1,470.00
450
•4Ir4 I I..v.. II
Insulation 4'wide P 58.00/lin.ft.
1..... I Olr r 1
4( 1956 - 5th - 1981 '
=a1 nnivcrsary
r i
February 4, 1982
City of Orono
BOR 66
Crysta_ Day, MN 557'7
Attn: Jeanne Maybusth
Re: Tonke Lake Property
1340 Bolden Park Raod
Our File 139-669
Dear Jeanne:
This letter provides an estimate of the cost of constructing a sever line to
serve the Gladys Olson home.
450
Lin.ft.
8" DIP Sanitary Sever @ 516.00/lin.ft.
S 7,200.00
105
Lin.ft.
A" PVC Sanitary Sever 8 514.00/lin.ft.
1,470.00
450
Lin.ft.
Insulation 4'wide P 58.00/lin.ft.
3,600.00
1
Each
8" Wye Branch A SSO.00/ea.
50.00
?0
Lin. ft.
6" CISP Is 510.00/lin.ft.
200.00
100
Ton
Class S eXtrepate base (1001 crushed)
e 58.00/tin
800.00
0.1
Acres
Seeding @ 07,000/ac.
1,500.00
TOTAL CONSTRUCTION ........................
$14,820.00
The sewer line will have lore than three feet of cover in some cases and
insulation of the main will be required. If you have any questions, please
contact this office.
Tours very truly,
BORESTROO, ROSEME, ARDERLIR 4 ASSOCIATES, INC.
Clenn R. Cook
r)RCI jo
R7n9e