Loading...
HomeMy WebLinkAbout1982-02-04 Letter, Sewer Installation Cost4adoo" 6 is" RY. 9J Af•+r M Z X.l R►. - eern PA.. 412."d a600 EXHIBIT 5no. 4( 1956 - 5th - 1981 ' =a1 nnivcrsary r i February 4, 1982 City of Orono BOR 66 Crysta_ Day, MN 557'7 Attn: Jeanne Maybusth Re: Tonke Lake Property 1340 Bolden Park Raod Our File 139-669 Dear Jeanne: This letter provides an estimate of the cost of constructing a sever line to serve the Gladys Olson home. 450 m... C/ 8" DIP Sanitary Sever @ 516.00/lin.ft. r.vn Or M.v.• RI 105 /.rrL r J.4rld I I A" PVC Sanitary Sever 8 514.00/lin.ft. 1,470.00 450 •4Ir4 I I..v.. II Insulation 4'wide P 58.00/lin.ft. 1..... I Olr r 1 4( 1956 - 5th - 1981 ' =a1 nnivcrsary r i February 4, 1982 City of Orono BOR 66 Crysta_ Day, MN 557'7 Attn: Jeanne Maybusth Re: Tonke Lake Property 1340 Bolden Park Raod Our File 139-669 Dear Jeanne: This letter provides an estimate of the cost of constructing a sever line to serve the Gladys Olson home. 450 Lin.ft. 8" DIP Sanitary Sever @ 516.00/lin.ft. S 7,200.00 105 Lin.ft. A" PVC Sanitary Sever 8 514.00/lin.ft. 1,470.00 450 Lin.ft. Insulation 4'wide P 58.00/lin.ft. 3,600.00 1 Each 8" Wye Branch A SSO.00/ea. 50.00 ?0 Lin. ft. 6" CISP Is 510.00/lin.ft. 200.00 100 Ton Class S eXtrepate base (1001 crushed) e 58.00/tin 800.00 0.1 Acres Seeding @ 07,000/ac. 1,500.00 TOTAL CONSTRUCTION ........................ $14,820.00 The sewer line will have lore than three feet of cover in some cases and insulation of the main will be required. If you have any questions, please contact this office. Tours very truly, BORESTROO, ROSEME, ARDERLIR 4 ASSOCIATES, INC. Clenn R. Cook r)RCI jo R7n9e