HomeMy WebLinkAbout1992-04-02 Septic System Approval4*
iM'--: ^
1. ■, f', U
SEPTIC SY
ORONO
APPROVAL
Permit #
Fee $
Entered By
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub-contractors. SEPTIC SYSTEM
DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED.
LOCATION: Si RrOui^
GENERAL CONTRACTOR:
SEPTIC CONTRACTOR:
OWNER:
PHONE:
ih^a^S {h/eimars T?.
PHONE:
PHONE: ^73 ’-'
□ APPROVED
CONDITIONALLY APPROVED: (Note Changes Below)
COMMENTS : Un!<S 1 /CXX> '/OOO 10 O yt\ L.J/p^j^ ^ nLv^
_______Rock,
A/b!^. ' flSn^/yryJ /?“f~ r)iL'X^' |y c Jfh^ly /TVyrkt^J p/;^
•'C t__________________________________________________________________________________
nOTICB TO INSTALLERS: Any changes to the aoDroved olans and specs must have prior
approval of the Inspector (473-7357). Call for'inspections 24 hours in advance.
NOTICB TO GENERAL CONTRACTORS; Primary and alternate drainfield sites MOST be protected
prior to and after system installation to avoid compaction of the natural soil.
ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must
remain in place until final site grading. Approval to pour footings will not be granted
until the Inspections Department has verified that primary and alternate sites are
adequately protected.
HO VEHICULAR TRAFFIC OF ART KIND (carSr truckSr earth moving equipment^ etc.) is allowed
within 20* of tested drainfield sites either before or after system construction. This
applies to the lot you are working on and all adjacent lots. You could be held liable for
damaging sites on neighboring lots.
VEHICULAR TRAFFIC CAR CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE.
Evidence of traffic on drainfield sites may be cause for revocation of building permits.
Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued.
Date Approveroved of Orono)