HomeMy WebLinkAbout1971-09-09 On Site Sewage Treatment Inspection ReportOn the North Shore of Lake Minnetonka ON-SITE SEWAGE TREATMENT INSPECTION RF.PORT POST OFFICE BOX 66 1335 S. Brown Rd.
Crystal Bay, MN 55323
473-7357
OWN ER _G-_______ o_R.._G_G __ /_�_A_.,-,_N_t:_'f _______ ADDR t:SS �-=-----=!3=--'-/co=-=(,,,(..)�....:.__��---=D:=:..-L.____:c::-::;z_�--
PHONE ________ PE AM IT NO'S. _.,;;;:,:;__..;8:::;.-__.�t...ll_,-=:;,_ ____ DATES __ CJ_?.___-...... 7_._/ ___ _
City Ordinance No. 210 requires that each on-site sewage treatment system in Orono be inspected on a regular basis.
The on-site sewage tr eatment system at the above address has been inspected and appears to fall into the category checked
below:□1□2
03
D4
Meets or exceeds current city standards in all respects relating to design, construction, and location. Appears
to be operating properly.
Does not meet current city standards in some respects relating to design, construction, or location. Appears
to be operating properly.
Does not meet current city stanPards in many respects relating to design, construction, or location. Appears
to be operating adequately.
Does not meet current city standards of desjgn, construcf 'Jn or location, is being overused, or is failing to
properly trea and dispose of the current input and is therefore endangering a water supply, is a source of
pollution to surface or groundwaters, is creating a safety hazard, or is otherwise creating a public nuisance.
Please contact the inspector to discuss requirements for repairs to your system. Soil testing may be re
quired. In all cases a design and site plan must be submitted for review. Your contractor must obtaifl a permit
before work is started.
WORK REQUIRED:
0 Se.ptic tanks must be pumped within 48 hours.D Drainfield must ,>e repaired or replaced within 90 days.
� Inspection riser (4" diam. pipe) must installed in ach tank. (1 r /tL. �,-.,. D't � )
D Tank inspection indicates maintenance pumpout is need d as soon as possible. City ordinance requires that
tanks be pum d out every three years.
S!TE CHARACTERISTICS:
Limiting Site Factors
OSlop□Soll
QHigh w t r tabl
0Lot iz
0Lak , w ti nd, or tr am
Q0rainag
COMM NT
Pot nti I for Syst rn Failure
(dep nds on oil tvP s, water
table, and syst m condi i n)
0Low
OM ium
Di 0 Sys m 1s c u in vi ibl
SU
GO
Site Capabilities for
Future Expan iong AdequattJ Fair 0 Poor 0 In _d qu t