Loading...
HomeMy WebLinkAbout1105 Tonkawa Rd Point of Sale COmpliancy Expires 11/4/2030Date Called in Date Scheduled City Of Orono Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: on awa Koad RID: 1081172313004 Owner Information Name: Mailing Address: (if different from Property) Phone: Email: Inspector Information Name, Company/ Organization License number: Phone: Email: Inspection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump v system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. Details on back of this sheet) Notes: Sewer line was connected and inspected on 11/4/2020 4" sch 40 PVC with tracer wire and anode. 138' of service pipe 51b air test for 15 minutes All OK Scott Toilet Removed o Yes o No For Inspection, Inspectors Signature: Date: Owners Signature: Date$ City Review Com liant ❑ Corrective Action Re uired Certificate of Compliance Expires 11/04/2030 Corrective 4kction Due by. Date, 7/31/2024 Signature: Natne: Kellie Hoen