HomeMy WebLinkAboutSWP24-000042-Sewer RepairTIME
0
Z
Q
J
W
Z
J
Z
0
a
j
0
cc
0
W
cc
Q
12
W
z
W
j
d
W
W
O
O
U
CITY OF ORONO
INSPECTION NO'
PERMIT NO.
ADDRESS
OWNER
CALLED IN
SCHEDULED
DATE
— TELEPHONE NO.
CONTRACTOR
DESCRIPTION
❑ FOOTING ❑DEMO -FINAL
❑ POURED WALL ❑ PLUMBING RI
❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL
❑ LATHE ❑ MECHANICAL RI
❑ FRAMING ❑ MECHANICAL FINAL
❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ FINAL ❑ WATER HOOK-UP
❑ AS BUILT -SURVEY ❑ SEWER HOOK-UP
❑ DEMO - SITE ❑ SEPTIC INSTALL
OWNER/CONTRACTOR TO MEET YOU: _ YES _ No
tm
COMMENTS: r>� 5 l I'd
L
❑ WORK SATISFACTORY: PROCEED
❑ CORRECT WORK &PROCEED
❑ CORRECT WORK, CALL FOR REINSPECTION
BEFORE COVERING
❑ CORRECT UNSAFE CONDITION WITHIN_
INSPECTOR WILL RETURN
❑ STOP ORDER POSTED, CALL INSPECTOR
❑ SEPTIC FINAL
❑ EXCAV/GRADING/FILLING
❑ TREE REMOVAL
❑ SITE INSPECTION
❑ RATED WALLS
❑ COMPLAINT
❑ FOLLOW-UP
❑ FOUNDATION/REMOVAL
hed
❑ PROJECT COMPLETE
❑ ISSUE CERTIFICATE OF OCCUPANCY
TEMPORARY
PERMANENT
HOURS. ElPHOTO TAKEN
❑ CITATION ISSUED
❑ INSPECTION REQUIRED. CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-4600
�ontractoi.Qn site:
Inspector.
White Copyllnspector's Flle
Canary CopylSite Notice