Loading...
HomeMy WebLinkAboutInfo on storm damage repair :� � ''As �e�, >"3.. A���. 1 � � �� � r� �F CITY of ORONO _ t .�. - , ,� ,,� .�����- r: I """���� �'� Post Office Box 66•Crystal Bay, Minnesota 55323•Municipal Offices ;"-��� ,+� W:�;, ' � - �` - � r�. On the North Shore of Lake Minnetonka August 1 , 1990 , I Re: Robert Owens Residence at 1700 Bohn's Point Road, Wayzata, 55391 To Whom It May Concern: The above referenced property sustained major damage to the shoreline from the back-to-back 100 year storms of July 23, 1987. The storm undermined existing retaining walls and resulted in the loss by erosion of portions of the steep lakeshore banks. The City of Orono instituted an emergency storm repair ordinance that would waive all requirements for land use review for work within the lakeshore protected area ( 0 -75 ' from shoreline of Lake Minnetonka, measured at 929.4' elevation). The owner of the property applied for the necessary building permits to restore the lakeshore bank by installing a series of retaining walls. The owner also provided temporary safety precautions by roping off the lakeside of the property in addition to providing temporary erosion control at the shoreline. �, � � Jean A. Mabusth Building & Zoning Administrator City of Orono JAM/lsv . / � BUILDINC&ZONING-473-7357 • ADMINISTRATION&FINANCE-473-7358 • PUBLIC WORKS-473-7359 ASSFSSING FAX-473-0510 �� , ROBERT H. OWENS 1700 Bohns Point Road Wayzata, Minnesota 55391 June 11, 1993 Ms. Jeanne Mabusth Building and Zoning Administrator City of Orono P.O. Box 66 Crystal Bay, Minnesota 55323 RE: LAND USE APPLICATION OF MAY 27, 1993 Dear Ms. Mabusth: Enclosed is a cross section of the revised retaining wall design by GME Consultants, Inc. This information applies: • This drawing has been submitted to, and reviewed with, Shawn Gustafson by GME Consultants. • You will note the use of Allan Blocks (a concrete product) with Geogrid reinforcements. The engineer has marked the drawing "preliminary" because he has not finalized the Geogrid design. They are doing test borings June 15, 1993, to establish final Geogrid dimensions. • As noted on the drawing, this cross section shows the maximum wall heights. They taper down from this as the bank height reduces. • The 3:1 slopes will have grass or ground cover and will have shrubs planted in front of the walls. A hedge will be planted above the upper wall. After much review with professionals, this design is believed to be best able to retain the slope permanently. If you have any questions or you require additional information, please call me. My office number is 854-3800. My home number is 471-7966. Sincerely, --� Enclosure i � ,