Loading...
HomeMy WebLinkAbout2474 Carman Street Point of Sale Inspection-Compliancy Expires 6/6/2034TASK 84884 Date Called in 5/28/2024 Date Scheduled 5/31/2024 10:30 A City Of Orono Reinspected after repairs 6/6/2024 Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: j2474 Carman Street PID: 12011723120027 Owner Information Name: Scott Edwards Mailing Address: (if different from Property) Realtor Ellen Dehaven Phone: 612-817-5555 Email: edehaven@cbrealty.com Inspector Information Name: Company/ Organization License number: Phone, Email: Inspection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary X sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from X Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters X basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary X Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. (Details on back of this sheet Notes: Spot repair 2' from west side of house. 4' PVC with ferncos and stainless steel bands. Task#85111 -James N 6/6/2024 Toilet Removed o Yes o No For Inspection: Inspectors Signature: Date: Owners Signature: Date: City Review Com liant ❑ Corrective Action Re uired Certificate of Compliance Expires: 6/6/2034 Corrective Action Due by: Date: 6/6/2024 I Signature: 1 Name: Keliie Hoen