HomeMy WebLinkAbout3520 Livingston Ave. Point of Sale Inspection-Compliancy Expires 6-3-2034TASK 84572
Date
Called in
5/8/2024
Date
Scheduled
5/10/2024 7:30 AM
��KFSHnRE
City Of Orono Reinspected after Repairs 6/3/2024
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form 2:00 PM
Property Address:
1 3520 Livingston Ave.
PID:
11711723430041
Owner Information
Name:
Brookside Holdings LLC.
Mailing Address:
(if different from
Property)
4046 Brookside Ave. So.
St. Louis Park, MN 55416
Phone:
612-889-2907
Email:
idealrefrig@comcast.net
Inspector Information
Name,
Company/ Organization
License number:
Phone:
Email:
Inspection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
X
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
connections to the sanitary sewer using a non -shrink permanent material, and
redirect the roof drains onto the ground outside the building.
Foundation
Foundation drains are underground pipes that collect storm water from
X
Drains
around the base of a building and into a sump basket, where it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground water that enters
X
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sump pumps should not be connected to the sanitary sewer.
Sewer Service
Sanitary Sewer Inflow & Infiltration (I/1) Compliance Inspection Sanitary
X
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. Details on back of this sheet
Notes:
Ouverson did a 32' CIPP from fence in yard to main.
Service is 4" cast to main. 2' repair is 4" Sch40 with reinforced ferncos.
Ouverson provided post repair video.
-Scott O. 6/3/2024
Toilet Removed
o Yes o No
For Inspection:
Inspectors Signature:
Date:
Owners Signature:
Date:
City Review
� Com liant
� Corrective Action Re uired
Certificate of Compliance Expires: 6/3/2034
Corrective Action Due by:
Date:
6/3/2024
Signature: zjtf
Name: Kellie Hoen